Consultancy for Development of an Operations Tender - 35248164
Tender notice from South Sudan, published on 07 Aug 2019.
Executive Summary
The UNITED NATIONS CHILDREN'S FUND has issued a Tender notice for the procurement of a Consultancy for Development of an Operations and Maintenance Model and Manuals in the South Sudan. This Tender notice was published on 07 Aug 2019 and is scheduled to close on 09 Aug 2019, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 35248164, while the tender notice number is and Register on the platform.
Key facts
Summary
Consultancy for Development of an Operations and Maintenance Model and Manuals
Tenders are invited for Consultancy for Development of an Operations and Maintenance Model and Manuals for the Juba South Sudan Water Supply Scheme. UNICEF works in some of the world’s toughest places, to reach the world’s most disadvantaged children. To save their lives. To defend their rights. To help them fulfill their potential. Across 190 countries and territories, we work for every child, everywhere, every day, to build a better world for everyone. And we never give up. For every child, Title of Assignment CASE STUDY: Development of an Operations and Maintenance Model and Manuals for the Juba Water Supply Scheme
Section WASH SSU
Location Home-based work; travel to Nairobi and South Sudan Duration Sixty (60) days spread over four (4) months Start date From: 12 August 2019
To: 10th December2019 1. BACKGROUND
Juba is serviced by unreliable water service delivery modalities, dominated by private sector provision through water trucking. Although a public piped water supply system exists in the old city of Juba, the existing public infrastructure, constructed in 1937, is rapidly aging and its under-maintained piped network is limited to central city coverage.
The South Sudan Urban Water Corporation (SSUWC), which is public utility holds the mandate for the provision of water to urban communities including the city of Juba. However, the SSUWC is only able to serve about 17% of the city’s population with piped water. At least 70% of households in Juba fetch water for domestic use from unimproved water sources such as water vendors and/or surface water like rivers.
Due to resource constraints, SSUWC has traditionally struggled to maintain water services across the city and has no capacity to extend services to underserved areas without external support. This leaves communities to rely on private or communal managed systems.
The private sector also plays critical role in provision of water to Juba and currently there are eight private firms also supplying water to Juba through treatment of water from the Nile followed by tankering. Preliminary estimate done in 2019 indicate a production capacity of about 40, 500 m3 /day by all eight private operators as well as SSUWC whilst the water they distribute via water tankering is on average 19, 700m3/d. This represents approximately 28% of the estimated water demand in Juba. However, it must also be noted most of public institutions, hotels, the UN and International Non-Governmental Organisations have their own private source of water. Since January to May 2019, the unit cost for 1 m3 of water at the water filling station has been constant among all private sector at 0.59 USD whilst the price offered by SSUWC is 0.51 USD. There are wide variations in the cost of water collected at water filling stations across Juba, ranging from 10 to 20 times across different areas.
At household level, the cost of a 20-litre jerry-can is 30 to 60 South Sudanese Pounds (SSP) (equivalent to 0.23USD per litre). This is far more expensive compared to the same amount of about 4 SSP at a filling station. A socio-economic survey conducted in 2018 indicated that about 50% of household surveyed were willing to pay about 10 SSP for 20 liter of water for 24/7 water availability with no waiting time and near the households’ location.
The same survey indicates that for the project area, 93.8% of the households are residents, 5.2% are IDPs from other parts of South Sudan and 1% are returnees. Proportion of water access type is as follows; 40.7% of household use borehole, 26.2% use the river directly, % use tankering services, 5.4% use household connection whilst the remaining 14.7% use a host of other sources
Given the limited capacity of SSUWC to provide water to households in Juba coupled with the high costs households pay for water services from private vendors, UNICEF in collaboration with the Government of South Sudan and support from KfW, commenced implementation of the project “Water Supply and Sanitation for poor Communities and IDPs Camps in Juba” in 2017 to improve access to water in Juba.
The project outputs aimed to reduce the water trucking burden and cost for water supplied to IDPs living in the UN House Protection of Civilians (PoC) site as well as the population in the peri-urban area of Juba called Rajaf and Kator payams. The communities living along the pipeline will be supplied with safe water through water kiosks and water filling stations installed at the water kiosk sites.
Once infrastructure construction is completed, a model of management of the water system will need to be implemented. The Guiding Principles for Urban Water Supply and Sanitation as outlined in the South Sudan Water Policy (2007), which states that the ‘responsibility for regulation, delivery and management of UWSS services shall be decentralized to the lowest appropriate level, in accordance with the principle of subsidiarity and “Efficient management practices shall be required so as to ensure the operational sustainability of UWSS systems.” This ToR aims aim is to develop a management model, aligned to the policy, for the Juba Water Supply Scheme.. 2. JUSTIFICATION The lack of institutional capacity, poor implementation of policy on water regulation and management, low cost recovery for water supply services, low ability and willingness and economic profit drivers for private water firms and vendors all contribute to a weak and fragile waters services supply system. This hinders the ability to provide effective, equitable and sustainable services to vulnerable groups and the general population of South Sudan. UNICEF would therefore like to further understand and gain insights into the various management options available and feasible for the sustainable operation of the infrastructure under construction through the Water Supply and Sanitation for poor Communities and IDPs Camps in Juba project, with a focus on leveraging the existing strengths of private players and communities whilst at the same time developing the capacity of government institutions to provide sustainable and quality water services. 3. PURPOSE AND SCOPE OF WORK 3.1 Purpose
UNICEF requires the services of an individual consultant to development of an Operations and Maintenance Model and Manuals for the Juba Water Supply Scheme
Based on the review and analysis, a suitable model for managing the UNICEF constructed water supply system in Juba will be developed including relevant operational and management guidelines. 3.2 Scope and Activities
The scope of the assignment will comprise the UNICEF funded water supply system for Juba whilst lesson learnt from other locations within South Sudan, including Yei, Yambio and Torit as well as international experience will further inform the final management model. The selected international consultant will undertake three field visits to South Sudan as follows:
• Scoping Visit to South Sudan for a period of 4 days to Juba and at least one other town
• Data Collection visit for a period of 12 days to Juba and at least one other town with UNICEF water supply intervention to conduct expert consultation
• Validation visit of 3 days to Juba to undertake workshop for validation of the final management model During the visits, the consultant will: -
• Conduct expert consultation with Ministry of Water Resources and Irrigation (MWRI), State Ministry of Physical Infrastructures, Ministry of Cooperatives and Rural Development (MCRD), Ministry of Housing, Lands and Public Utilities (MHLPU), SSUWA, Private Sector Water Service Providers, and NGOs to understand the current practice and policy of operation and maintenance of water supplies,
• Review of existing literature on the management of urban water supply schemes in South Sudan, including the role of the South Sudan Urban Water leading to recommendations on the best model to take forward.
• Establish capacity and constraints of SSUWA and other parties in actual activities of water abstraction, treatments and distribution of water
• Analyse the current role of the Water Users Associations (WUA) in the operation and management of water kiosks and how this can be incorporated into the operational models
• Collect relevant data from stakeholders through questionnaires, FGD, KII and semi structured interview
• Undertake site observation in at least 3 locations in Juba on current management practices including a SWOT analysis of the involved stakeholders, systems and processes
• Undertake a high-level review of current operations, management and water supply activities in the two towns of Torit and Yambio including a SWOT analysis of the involved stakeholders, systems and processes. Based on information gathered on current experiences and good practice, the consultant shall: -
o develop options of models for water services provision and determine requirements for establishment.
o Justify the most feasible model for operation and maintenance of water supplies from source to households For the feasible water services model, develop initial requirements for establishment of the management model including: -
- preparation of a dummy business plan and methodology for tariff setting for water supply schemes reflecting capital and operational expenditure / capex and opex
- recommendations on minimum staffing requirements and job descriptions for each staff role, with adequate consideration of equal gender representation in decision-making roles.
- drafting of dummy MoU that outlines the roles and responsibilities of the management body, local authorities and supply zones including the social accountability of the management body to the community, and management of environmental impact.
- recommendations on the minimum training package (documentation, financial management) for the management body for effective operation, maintenance and management of the system including environme
The bid deadline for Consultancy for Development of an Operations and Maintenance Model and Manuals was 09 Aug 2019. Bidding is closed.
This tender has been issued by UNITED NATIONS CHILDREN'S FUND in South Sudan.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is financed by United Nations Secretariat.
The tender is classified under the following CPV code(s): 71530000 - Construction consultancy services.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 35248164. The purchaser document reference is not provided in the notice.
This tender falls under Construction and Real Estate in South Sudan. Suppliers in these sectors can track similar South Sudan tenders using CPV-based alerts.