Procurement Summary
Country : Burkina Faso
Summary : Construction of the Sonabhy Liquid Hydrocarbon Deposit
Deadline : 08 May 2020
Other Information
Notice Type : Tender
TOT Ref.No.: 42535878
Document Ref. No. :
Competition : ICB
Financier : Self Financed
Purchaser Ownership : -
Tender Value : Refer Document
Purchaser's Detail
Purchaser : SOCIETE NATIONALE BURKINABE D’HYDROCARBURES (SONABHY)
Pissy District Route Nationale N ° 1 Floor / Office Number: 1st Floor Building a / Prm Secretariat / Porte a111 City: Ouagadougou Po Box: 01 Bp 4394 - Ouagadougou
Tel: +226-25426800/25430034
Fax:+226-25430174
Burkina Faso
Email :sonabhy@sonabhy.bf
Tender Details
Tenders are invited for Construction of the Sonabhy Liquid Hydrocarbon Deposit in Peni
This solicitation of expressions of interest follows the public procurement plan published on the
SONABHY website SONABHY obtained funds from its 2020 budget to finance the supervision of the
works to extend the depot SONABHY liquid hydrocarbon in Péni. The services consist of the creation
of a 104, 000 m³ liquid hydrocarbon depot consisting of: 3 super bins of 20, 000 m³; 2 diesel tanks of
20, 000 m³; 2 tanks of DDO of 1000 m³; 2 tanks of oil of 1000 m³; Loading and unloading stations; all
other related facilities. The services payable by the firm will relate to all the trades in the project and
will concern, without being limiting: ➢ CIVIL ENGINEERING - VRD Check and verify: The density and
compaction of the embankments; Excavations, reinforcement and aggregates; Plate tests; Proctor
trials; Concrete controls; Calculation notes; ➢ METAL FRAMES Check and verify: the tightening
devices and devices; high strength bolts; Welding tests; calculation and study notes. ➢ PIPING
Perform: Controls and inspections of welds; Destructive tests and checks; Non-destructive checks;
The qualification check of welders; Control of regulatory resistance and tightness tests; Insulation
control; Control of the characteristics of tubes and shaped parts; Verification of calculation notes
and studies ➢ ELECTRICITY Carry out: Tests and inspections in the workshop; Tests and inspections
on site; Initial verification of electrical installations; Examination of installations against standards;
Measuring the resistance of earth connections; Dielectric tests and control of earthing and
connections. ➢ BOILER MAKING Perform: Control of materials; Control of the edges to be welded
and the preparation of assemblies in the workshop and on site; Control of penetrant and radio
welds; Control of the welds of the prefabricated sub-assemblies and the welds of connection with
the dress; Suction cup inspection of all tank bottom welds; Verification of studies and calculation
notes.
[Disclaimer: The above text is machine translated. For accurate information kindly refer the original document.]
Documents
Tender Notice