Procurement Summary
Country: Djibouti
Summary: Construction of a Desalination Plant
Deadline: 25 Feb 2015
Posting Date: 03 Apr 2014
Other Information
Notice Type: Tender
TOT Ref.No.: 590338
Document Ref. No.: 2014/S 039-063676
Competition: ICB
Financier: EuropeAid
Purchaser Ownership: -
Tender Value: Refer Document
CPV Classification
44161410 - Subsea pipelines
45252126 - Drinking-water treatment plant construction work
45253100 - Demineralisation plant construction work
65122000 - Water desalination services
71323200 - Plant engineering design services
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Contract forecast notice for Under the contract the aim is to construct a desalination plant in Doraleh for the population of the City of Djibouti (Republic of Djibouti). This contract entails the following tasks:
1. construction of a desalination plant comprising pre-treatment (sand or membrane filter), reverse osmosis, re-mineralisation and disinfection, for an output of 22 500 m3/day in phase 1 (with an option to increase output to 45 000 m3/day in phase 2) with a seawater pumping station of an approximate capacity of 100 000 m3, a pumping station for transferring drinking water to the city's distribution system, a wastewater and sludge treatment plant;
2. seawater suction intake with a subsea pipeline of approximately 800 m and a subsea discharge pipeline of approximately 500 m with a brine dispersion system;
3. construction of a pipeline of approximately 8, 5 km, designed to carry 45 000 m3/day (connecting the plant to the city's drinking water distribution system) and an approximate 2 000-m3reservoir on high ground (120 m) in the city;
4. provision, by the desalination-plant contractor, of an operating service and professional training, in order to convey instructions between the contractor and the operator efficiently.
Numbers and titles of lots:
The contract is divided into lots:
yes, number of lots: 2:
lot 1: design and construction of the desalination plant — including subsea works — plus operating services and staff training;
lot 2: connection of the plant to the drinking water distribution system.
Intended timing of publication of procurement notice:
March 2014.
11.Additional information
12.Legal basis:
9th or 10th EDF: ACP-EC Partnership Agreement signed in Cotonou on 23.6.2000, as amended.
13.Date of dispatch of this notice: 10.2.2014.
[Disclaimer: The above text is machine translated. For accurate information kindly refer the original document.]
Documents
Tender Notice