Architectural, engineering and planning services Tender - 4209845
Tender notice from Germany, published on 02 Nov 2015.
Executive Summary
The Wuerzburger Baeder GmbH has issued a Tender notice for the procurement of a Architectural, engineering and planning services in the Germany. This Tender notice was published on 02 Nov 2015 and is scheduled to close on 01 Dec 2015, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 4209845, while the tender notice number is 386439-2015 and Register on the platform.
I. DESCRIPTION OF BESCHAFFUNGSVORHABENS1. Ausgangslage1.1 The Wuerzburger Baeder GmbH ("WBG" or "Customer") is a group company of Wuerzburger supply and traffic GmbH ("WVV"), a portfolio company of the city of Wuerzburg. The WBG operates the public baths in Wuerzburg.1.2 The existing leisure and family "Nautiland" to renewalbe rt. The project "Educational and family leisure Nautiland" aimed at the renewal of the existing leisure and family bath Nautiland a zeitgemaessen, corresponding to the requirements of the city of Wuerzburg public school, sport and family leisure. The bath should in particular by swimmer pool and training pool in Innenbereich, more pools in the outdoor area, sauna and dining facilities are distinguished. The bathroom is all year for school swimming are available and under utilization of public subsidies (FAG funding) built werden.1.3 A planning office has for a renewal in the way of refurbishment already general planning services up to parSTATEMENTS power phase 3 according HOAI provided. These planning results for a general refurbishment to appropriate planning results for a replacement building variant are placed opposite. Subsequently, the client will determine if the remediation variant or the replacement building variant wird.1.4 reacted This VOF method is used to Becreation of project management services for the Baedervorhaben. The details on the commissioning of the project controller are described in point 2 below. A final determination of the power of the image is carried out in the tender documents for the negotiated procedure, which adjoin the present call for competition wird.1.5 The projectexpensive acts in addition to a general planner, as determined in an ongoing VOF procedure. The general planning is gradually initially commissioned a general planning to work out for a replacement building variant (Phases 2 and 3 according to HOAI). After completing the order level 1 the client is on the continuation of the project and ueabout the further commissioning of all planners decide with another contract stages. The principal will determine at that time whether the replacement building variant or the refurbishment wird.In implemented depending on the variant of decision of the contracting after order Level 1 is the general directions either with the other general planning of the Messklichung remediation variant or with the other general planning for the realization of the replacement building variant commissioned (in each case as a gradual commissioning of the power Phases 4 to 9 according to HOAI, in turn, each with no claim to a commission with each naechstfolgenden order stage) .2. Project management services after Projektstufen2.1. Ausgeschriebene LeistungenDie advertised here Performances refer to the project controlling monitoring of the project "school, sport and family leisure Nautiland" under realization of the construction program set out below in point 3 with simultaneous action of a general planner who will entrusted with the power images in accordance with Clause 4n soll.Die tendered services orientate themselves on the capabilities of the "performance profile project management" of i?1/2 2 of the "performance and fee scale project management in the construction and real estate" of AHO eV (AHO-Series No. 9, 4th Edition May 2014 there Section 2, hereinafter "AHO") for all areas of action (AE)i?1/2and can be used for the project stages 2 to 5. These benefits still be supplemented by benefits from the "power image Project management" of i?1/2 3 AHO. Whether and to what extent this is the case, and whether besides the respective basic services and special services you will pay, and whether and to what extent individual basic services dispensed, is mainly arising from the LeisDescription Send result that wird.2.2 sent to the bidders with the invitation to tender. ProjektstufenIm individuals are entrusted the following project stages in the way of gradual commissioning werden.Projektstufe 2: Planning; Project Stage 3: Ausfuehrungsvorbereitung; Project Stage 4: Implementation; Project Stage 5: Projektabschluss.2.3. HandlungsbereicheDie here ausgeschriebenen services of the contractor include: if the respective stage of the project will be commissioned: the following in each of the project stages action ranges according AHO: - A organization, information, coordination and documentation, - B quality and quantity, - C. Cost and financing, - D Dates, capacities and Logistics, - E contracts and insurance.2.4. Gradual BeauftragungDer contractor is commissioned gradual commissioning in the way. With the completion of the award procedure of the project manager is first with the project Stage 2: mandated planning. A claim to the commission with further stages of the project consists nicht.2.5. Reference point of project management performance due to the planned variantnentscheidung the client the benefits of the project controller in the project stage 2 (planning) will first refer to the development of a replacement building planning to LP 3 according HOAI. After the subsequent decision Description of the client the rest of the project stage 2 (planning) and with appropriate assignment of further stages of the project alsothis provided either in terms of planning, the replacement building variant or with respect to the already present refurbishment variant (according to the commission of the general designer) .2.6. Further specifications to performance image, remuneration and VertragswerkDie further details on the required performance image, the remuneration of the services and to the lefts contract work can be found in due course the tender documents for the negotiated procedure, which is conducted at the local pan-European call for competition in the port. The payment will be made either by eligible costs or at an hourly rate or a flat-rate contract or as a combination of these billing models. The Verguetungsmodell is with the tender documents to the negotiation procedure nor konkretisiert.3. BauprogrammDie project management services related to the achievement of the following construction program. The principal changes in the building program throughout the procedure expressly reserves the right, as well as modifications of the construction program after ZuschlagserteilOGRAMMING a negotiated procedure to be agreed in detail later regulation of Projektsteuerungsvertrages.Es is to realize a barrier-free and family-friendly Grundversorgungsbad, which also corresponds to the demands of a Dreifachuebungsstaette for schools: 3.1 Interior: 3.1.1 swimmers, competitive level: 6 lanes (15.00 mx 25.00 m), water depth 1.80 m: 3.50 m, floor design "stufenfoermig" including Startbloecken, soil and Flaechenmarkierungen and a diving tower with 1m board and 3m platform; 3.1.2 for non-swimmers: leisure-oriented: Wasserflaeche least 160 m, free form design, water depth 1.35 m, including attractions (non-binding InGames attraction: the flow channel, wave and Massageduesen, Carbonated seat / deck-chair, Bodensprudler, islands and the like); 3.1.3 for non-swimmers.. Lehrschwimmbecken: Wasserflaeche least 125 m, Type of Grundkoerpers as a rectangle with 10 mx 12.5 m, Beyond that, free form design, water depth 0.80: 1.35 m; 3.1.4 parent-child area / PlanschbCorners: Wasserflaeche least 45 meters water depth, free form design, 0.00 m: 0.40 m; 3.1.5 gastronomy area with bereichsabhaengiger use for indoor and outdoor use; 3.1.6 Sauna 1: 90C for at least 24 persons; 3.1.7 Sauna 2: steam bath for a minimum of 8 persons; 3.1.8 cooling basin; 3.1.9 Single Case for the bathing activities: at least 38 pieces; 3.1.10 Disabled case for the bathing activities: at least 2 pieces; 3.1.11 changing room lockers for the bathing activities: at least 575 piece: for use in the wardrobe of the users of the individual changing rooms and disability case for the bathing activities; 3.1.12 collecting case for the bathing of 4 pieces: Pro collecting locker design to at least 30 m; per Sammelumkleide recommended an integrated teacher-single dressing room; per collection locker changing room lockers 30 within the collection locker for users of the collective locker (120 changing room lockers); 3.1.13 collecting case for the sauna operation: at least 2 pieces: gender segregation; Arrangement of lockers in the locker collection (total of at least140 changing room lockers); 3.1.14 Duschraeume for beach operation: at least 3 pieces: separation by gender with a life expectancy of at least 25 m per shower room; 3.1.15 Schwimmmeister space: at least 15 m2: A Schwimmmeister room with equipment for first aid with at least 15 m, Optional system as two separate rooms possible; in separate rooms:i?1/2Swimming champion least 7 m, for first aid at least 8 M.3.2 Exterior: 3.2.1 swimmer pool: geometric design (rectangle with Laengsausrichtung for railway swimming), 3 tracks (7.50 mx 25.00 m), water depth 1.80 m, including Startbloecken, soil and Flaechenmarkierungen and pool cover against hypothermia; 3.2.2 for non-swimmers: freizeitorientiert: free form design, at least 120 m, water depth 1.35 m, pool cover against hypothermia (with entry in the indoor and the outdoor pool area), including attractions (non-binding examples of attractions: the flow channel, wave and Massageduesen, Carbonated seat / deck-chair, Bodensprudler, Islands and ae);.. 3.2.3 Parent-child area / Planschbecken: Wasserflaeche least 60 m, free form design, water depth 0.00 m: 0.45 m; 3.2.4 waterslide (with access from the indoor pool and outdoor area); 3.2.5 Sauna 3: 100 C for at least 18 people; 3.2. 6 Sauna 4: panoramic sauna 90C for at least 37 persons; 3.2.7 Sauna 5 Subjects sauna 60C for at least 28 persons; 3.2.8 Kneipp basin; 3.2.9 relaxation area; 3.3 Additional specifications: These areas (3.1 and 3.2) are in the course of planning under consideration of COC Baederrichtlinie to the necessary Nebennutzflaechen, Funktionsflaechen and Technikflaechen, in indoors and outdoors, to ergaenzen.Insbesondere following requirements have been mandatory to implement 3.3. 1 training room with dazugehoerigem chair bearing; 3.3.2 Two EishocKey-team changing rooms, each with at least 33 and at least 33 Umkleideplaetzen locker lockers that match the current arrangements for the exercise of ice hockey. The dressing rooms must have separate inputs and outputs (no common boot floor) are equipped. Access is via a separate outside door, should not be overi?1/2the main entrance of the bath carried out; 3.3.3 A hockey referees'' dressing for at least 3 persons with at least 3 locker lockers. The dressing must have a separate entrance and exit (no common boot transition with the ice hockey team locker room). Access is via a separate outside door, should not therefore about the Haupteineffected transition of the bath; 3.3.4 In the field of swimmers, both indoors and outdoors, are sufficient to arrange rest and Liegeflaechen for the bathing, which can be optionally used as a space for spectators at the club / competitive swimming; 3.3.5 In the pool surround area of parent-child area are sufficient areas for parent communicationtion / wait / supervision provided; 3.3.6 shall be provided on a laid down here, specific user requirements oriented furnishing and equipment design and construction program for umzusetzen.Vorgaben contained in the tender documents, which are available at the sind.4 mentioned contact point. Performance pictures of GeneralplanungDer Project managers wird S.Maria beside a separately commissioned general planner. Meanwhile General planning services include the following performance profiles: 4.1 Objektplanung: i?1/2 34 HOAI; 4.2 Planning of outdoor installations: i?1/2 39 HOAI; 4.3 Structural design: i?1/2 51 HOAI; 4.4 Technical Equipment: i?1/2 55 HOAI, across all asset groups (also Badetechnik); 4.5 Building Physics (Waermeschutz and energy balancing as well as constructioni?1/2and room acoustics); 4.6 fire protection engineering; 4.7 Kuechenplanung; 4.8 Sauna planning; 4.9 services of the Health and Safety Coordinator; 4:10 soil investigations and geotechnical reports; 4:11 WU: planning (waterproof concrete) .II. PROCEDURE, procedure and VERFAHRENSREGELUNGEN1. VerfahrensartDas award procedure is gema as a negotiated procedureess of the Regulations for professional services (VOF) with upstream Europe-wide call for competition durchgefuehrt.2. VerfahrensablaufIm part of a Europe-wide competition participation are invited interested undertakings to apply for participation in the negotiated procedure and their suitability for the advertised Projektsteuerungsorder to prove. From the circle of companies that have applied for participation in the negotiated procedure and their suitability could be detected, the customer will select the most suitable candidate (at least three) and calling as a bidder to negotiations for the subsequent negotiated procedure. These selected bidders whoto the tender documents sent to the negotiation procedure (in particular method letter for negotiated procedures, award criteria, draft contract) .From the tenderers should be submitted indicative bids, are run on the basis Verhandlungsgespraeche with tenderers. The client is following the Verhandlungsgespraeche entscheiden whether and to what extent the tender documents be adapted to Aenderungswuensche the tenderers from the Verhandlungsgespraechen. Subsequently rich bidders a binding offers. The client seeks to make on the basis of binding offers, the final aggregate evaluation of tenders and award the most economicali?1/2To grant offer. However, the contracting authority reserves the right to one or more further bidding rounds durchzufuehren.Weitere procedural rules are in the tender documents contain that obtained in the mentioned contact point sind.3. Formblaetter to TeilnahmewettbewerbDie applicants are required for the submission of the request to participate by the JOBto use aggeber predetermined Formblaetter, which are available as mentioned contact point as part of the tender documents. Changes to the preprinted content of Formblaetter are prohibited and lead to exclusion from the tender process. Amendments to the candidate on his own records must be clearly sein.4. Testing of Teilnahmeancontracts and services, education and NachforderungDer authority is the timely submitted Teilnahmeantraege and the deadline to tender with a view to their formal regularity and completeness as well as their substantive consistency pruefen.Der authority reserves the right, after due consideration of the Enlightenment Beadvertisers / buyers to demand about the request to participate / offer. To answer the Aufklaerungsfragen will the candidates / bidders a reasonable period gesetzt.Der authority also reserves the right, the candidate / tenderer after due consideration for subsequent submission of missing explanations and evidence that up to the deadline for applications / Anbid deadline were not pre-sets to call on (i?1/2 5 para. 3 VOF / i?1/2 11 para. 3 VOF). The client reserves the right to information of all kinds including missing signatures and including missing prices for calling. No additional claim is made for the supporting signature of the candidate or the authorized representative of the applicant consortiumin the form "request to participate" (under section 4). The client assumes that in the absence of this signature is no effective participation application was submitted. No additional claim is carried out also for such signatures and / or information in a bid if the absence of these signatures or information means that absolutely no moreSames offer wurde.Im filed scope of its pflichtgemaessen Ermessensbetaetigung is the principal non-discriminatory judge of whether a general need for further round is initiated or not. If a general need for further round initiated, the client will all concerned candidate / tenderer without discrimination to file decalling r missing include statements and evidence. In which to produce a reasonable deadline is set. In this period is a limitation period, in case of non compliance with the exclusion of the candidate / tenderer from the procurement procedure is carried out, unless the candidate / tenderer has not Fristversaeumung consists vertreten.Es no Parental ratingung of the candidate / tenderer, missing include statements and evidence outside of a general need for further round nachzureichen.Das right of the client, after due consideration for calling up missing include statements and evidence, does not establish any responsibility of the client for the completeness of Teilnahmeantraege / tenders submitted. Applicants/ Bidders remain for the complete and timely submission of all necessary documents themselves verantwortlich.5. Applicants Communities, subcontractors and MehrfachbewerbungenDie application is possible individually or as a bidding consortium. Both individual applicants as well as applicants communities can be used to detect their skills and Leistungsfaehigkeit based on reliable subcontractors (qualifying subcontractors) or reliable eignungsleihende companies. From qualifying subcontractors and eignungsleihenden companies each have a Nachunternehmererklaerung with the request to participate must be submitted. Other subcontractors (such irrelevant to the parkingung the suitability of the candidate or the candidate community) do not have to be named and no Nachunternehmererklaerung abgeben.Die multiple application is not permitted because of the associated threat of violation of secret competition and lead to exclusion from the award procedure at the present time. From an exclusion can only be the exception, i?1/2if the applicant / bidding consortium demonstrates that due to the multiple application a violation of secret competition is excluded. Further details include available at the mentioned contact point Vergabeunterlagen.III. KOSTENOBERGRENZEDie cost ceiling for the overall project in the variant of the replacement new building AMOUNT 25, 000, 000i?1/2EUR net (KGr 200 to 700). This covers all costs of the battle group from 200 to 700 DIN 276 (2008), ie including all fees (eg. As planners, project management) and building costs (eg. As authorizations, inspection fees) according KGr 700.IV. INFORMATION ON PROJEKTSTEUERUNGSVERTRAGDer client will inform the bidders, the AM for participation Verhandlungsverfalead were selected send a contract for a project management contract design. This draft agreement will be negotiated in Verhandlungsgespraechen with the bidders and if necessary amended on this basis. All bidders always offer an identical draft treaty. Further details for treaty are due time the tenderwere to refer to the negotiation procedure, which performed at the local pan-European call for competition in connection wird.V. ADDITIONAL INFORMATION / applicants question Further information about the procurement projects are included in the tender documents, which are provided in the mentioned contact point obtained sindAusserdem, candidates questions. Spaetester date for the submission of a candidate''s question Monday, November 23, 2015, 15:00 clock. More detailed rules are contained in the tender documents. Description: Architectural, engineering and planning services Authority Type: Other
Contact Nature: Services
Procedure: Negotiated procedure
Document: Contract notice
Regulation: European Union, with participation by GPA countries
Award criteria: The most economic tender
CPV code: 71240000
CPV Description: Architectural, engineering and planning services.   Internet address (URL): http://www.wvv.de
The bid deadline for Architectural, engineering and planning services was 01 Dec 2015. Bidding is closed.
This tender has been issued by Wuerzburger Baeder GmbH in Germany.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 71240000 - Architectural, engineering and planning services.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 4209845. The purchaser document reference is 386439-2015.