This solicitation is for Pine Ridge Job Corps Wind Turbine Maintenance at USDA FOREST SERVICE PINE RIDGE JCC, HWY 385-15710, CHADRON NE 69337.
The contract is subject to Service Contract Act WD 2015-5355.
Submission of questions are due 1700 PM Eastern Time on 15 September 2026. An Amendment answering all pertinent questions will be issued by 1700 PM Eastern Time on 16 September 2026. Offers are dueno later than 1700 PM Eastern Time on 18
September 2026.
Quoters are allowed to submit only one quote.
The following documents are included as attachments to this solicitation.
Attachment 1 Statement of WorkWind Turbine
Attachment 2 Schedule of Items
Attachment 3 Service Contract Act WD 2015-5355
Quotes will be at least be Evaluated on the following to points.
The contractor must be qualified to service Northwind turbine systems and operate independently without direct government
supervision. This needs to be proven by submission of industry accepted certificates. Will also be evaluated on, Attachment 1 Statement of Work Wind Turbine.
B) Ability to meet the requirements listed: The Northwind 100 is a utility-scale wind turbine model, and all major systems drive train, blades, generators, gearboxes, hydraulics, and control systems which means they are capable of performing maintenance on this type of turbine.
Contact InformationPrimary Point of ContactGary DurhamEmail
[email protected] Phone Number(blank)Alternative Point of ContactNicole GreenEmail
[email protected] Phone Number(blank)Contracting Office AddressPINE RIDGE CIVILIAN CONSERVATN CTR 15710 HIGHWAY 385 CHADRON, NE 69337 USA Attachments/LinksLinksNo links have been added to this opportunity.AttachmentsDocumentFile SizeAccessUpdated Date 1282A726Q0072 Wind Turbine Pine Ridge.pdf 5.79 MB
Public Sep 11, 2026 Attachment 1 Statement of WorkWind Turbine.pdf 1.31 MB
Public Sep 11, 2026 Attachment 2 Schedule of Items.pdf 526.91 KB
Public Sep 11, 2026 Attachment ...