The work includes replacement of secondary clarifier no. 4 internal components, replacement of control panels for all four secondary clarifiers. (PWO 24-0045)
The work at G575 includes phased construction of upgrades to manholes and piping(removal/replacement/new installation); removal and replacement of submersible pumps and removal and replacement of the existing crane over the wet well. (PWO 26-0044)
Contact InformationPrimary Point of ContactAshley RuizEmail
[email protected] Phone Number9103786971Alternative Point of ContactLauren LocontoEmail
[email protected] Phone Number9104515916Contracting Office Address9324 VIRGINIA AVENUE (No Street Address 2) NORFOLK, VA 23511-0395 USA Attachments/LinksLinksNo links have been added to this opportunity.AttachmentsDocumentFile SizeAccessUpdated Date Amend 0013.pdf 33.49 KB
Public Sep 8, 2026 Amend 0012.pdf 109.55 KB
Public Sep 2, 2026 Amend 0011.pdf 188.43 KB
Public Sep 2, 2026 Amend 0010.pdf 121.7 KB
Public Aug 28, 2026 Amend 0008.pdf 115.63 KB
Public Aug 26, 2026 Amend 0007.pdf 131.08 KB
Public Aug 25, 2026 Amendment 0006.pdf 150.44 KB
Public Aug 24, 2026 Amend 0004.pdf 146.66 KB
Public Aug 11, 2026 Amend 0003.pdf 61.14 KB
Public Aug 7, 2026 IFC_SpecsAsOne_240045FC436ClariferRepairs_REV1.pdf 2.97 MB
Public Aug 6, 2026 Amend 0002.pdf 109.01 KB
Public Aug 6, 2026 N4008526B0044 Dwgs_Signed.pdf 13.77 MB
Public Aug 5, 2026 N4008524B0045 Dwgs_Signed.pdf 7.48 MB
Public Aug 5, 2026 Amend 0001.pdf 125.34 KB
Public Aug 5, 2026 RFP 240045.pdf 174.14 KB
Public Jul 31, 2026 N4008526B0044 Specs.pdf 10.92 MB
Public Jul 31, 2026 N4008524B0045 Specs.pdf 6.89 MB
Public Jul 31, 2026 26-0044 DM.pdf 3.1 MB
Public Jul 31, 2026 26-0044 Basis of Design.pdf 19.89 MB
Public Jul 31, 2026 26-0044 Asbestos and Lead-Paint Survey.pdf 3.74 MB
Public Jul 31, 2026 26-0044 APPD.pdf 216.07 KB
Public Jul 31, 2026 24-0045 AppendixD.pdf 176...