The usda/nrcs minnesota is issuing a solicitation for wetland restoration work on lands enrolled in usda s wetlands reserve program (wrp) in ulen township, clay county, minnesota.
The magnitude of proposed construction is between is $500, 000 and $1, 000, 000.
Bid opening information:
howard stover, contracting officer, will conduct the bid opening.
The bid opening session will be held august 21, 2015 at 11:00 am cst at,
usda-nrcs
375 jackson street, suite 600
6th floor conference room
st. Paul, mn 55101
*please check in with the security guard on the first floor to gain access to the building.
**if you chose not to attend the bid opening session please have your bids mailed to the following address by august 21, 2015 at 11:00 am cst:
howard stover
contracting officer
375 jackson street, suite 600
st. Paul, mn 55101
*all questions regarding this solicitation must be submitted in writing via e-mail to
[email protected] by wednesday august 12, 2015 by 5:00 pm est, all q&a s will be posted to the solicitation on fbo.
Amendment no. 1 information:
solicitation no. Ag-6322-s-15-0014 is being amended to add and change the following items;
1. Updated bid schedule: line items are unchanged. The referenced construction and material specification numbers associated with the line items have been updated.
2. Updated construction specifications: minor pen & ink changes have been made to spec numbers 11, 21, 23, and 34. Please reference the attachment on fbo.
3. Pen and ink changes have been made to the construction plans and drawings: an asterisk (*) indicates the additional information.
4. A copy of the stormwater pollution prevention plan (swppp) has been provided so the amount of the permit will be known.
5. A copy of site showing meeting minutes and q&a s has been uploaded.please consult the list of document viewers if you cannot open a file.
Sealed bid (ifb)
type: other (draft rfps/rfis, responses to questions, etc..) label:
sealed bid (ifb)
posted date: july 22, 2015 ag-6322-s-15-0004.pdf (6, 969.32 kb)
description: ag-6322-s-15-0004 solicitation package
amendment 1
type: mod/amendment posted date: july 30, 2015 amendment_0001_ag-6322-s-15-0004.pdf (83.88 kb)
description: amendment no.1: ag-6322-s-15-0004
updated_bid_schedule.pdf (71.60 kb)
description: updated bid schedule
con_and_material_specs_update.pdf (968.67 kb)
description: updated construction specifications
ulen_const_drawings_rev.pdf (3, 020.87 kb)
description: construction plans and drawings
ulen_wrp_swppp062015.pdf (639.01 kb)
description: stormwater pollution prevention plan (swppp)
site_showing_meeting_notes_7.29.15.pdf (50.31 kb)
description: site showing meeting minutes and q&a s
construction site showing sign in sheet
type: other (draft rfps/rfis, responses to questions, etc..) label:
construction site showing sign in sheet
posted date: august 4, 2015 ulen_sign_in_sheet.pdf (48.94 kb)
description: construction site showing sign in sheet.
Ulen township
clay county, minnesota.
United states
primary point of contact.:
sean jordan,
contracting officer
[email protected]phone: 2027207329 all files
sealed bid (ifb)
jul 22, 2015
ag-6322-s-15-0004.pd...download/view ag-6322-s-15-0004.pdfamendment 1
jul 30, 2015
amendment_0001_ag-63...download/view amendment_0001_ag-6322-s-15-0004.pdfupdated_bid_schedule...download/view updated_bid_schedule.pdfcon_and_material_spe...download/view con_and_material_specs_update.pdfulen_const_drawings_...download/view ulen_const_drawings_rev.pdfulen_wrp_swppp062015...download/view ulen_wrp_swppp062015.pdfsite_showing_meeting...download/view site_showing_meeting_notes_7.29.15.pdfconstruction site showing sign in sheet
aug 04, 2015
ulen_sign_in_sheet.p...download/view ulen_sign_in_sheet.pdfgeneral information
y -- construction of structures and facilities
naics code:
237 -- heavy and civil engineering construction/237990 -- other heavy and civil engineering construction
237 -- heavy and civil engineering construction/237990 -- other heavy and civil engineering construction
for help: federal service deskaccessibility
added: jul 22, 2015 12:36 pm modified: jul 30, 2015 12:06 pmtrack changes