Procurement Summary
Country: Canada
Summary: Water Street Storm Sewer Extension
Deadline: 13 Jan 2026
Posting Date: 17 Dec 2025
Other Information
Notice Type: Tender
TOT Ref.No.: 132171642
Document Ref. No.: 2024-18
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
The work consists generally of supplying all labour, materials and equipment for the excavation, installation, backfilling, commissioning, testing ofwatermain, new storm sewer, relocation of existing services pipe, all associated fittings and appurtenances, structures, catch basin leads, manholes, catch basins, concrete curb, concrete sidewalk, clay brick pavers, roadbed granular materials, asphalt pavement, landscaping, street signage, light standard relocations, and associated landscape features and accessories as required to complete the work on Water Street (Princess Street to KingStreet) as per the Specifications and Drawings. More specifically, the project includes the supply and installation of: Approximately 131m of 1800mm diameter concrete storm sewer. Approximately 29m of 1050mm diameter concrete storm sewer. Approximately 3m of 750mm diameter concrete storm sewer. Approximately 4m of 600mm diameter PVC storm sewer. Approximately 6m of 300mm diameter PVC storm sewer. Approximately 13m of 200mm diameter PVC storm sewer. Approximately 5m of 200mm diameter PVC, DR18 Water Main. Approximately 20m of 250mm diameter PVC, DR18 Water Main. The Contractor is responsible for dewatering excavations and/or working around tide-cycles as required to complete the installation of pipes and structures. The Contractor is responsible to coordinate shut-downs of existing infrastructure where required to complete the works. This will include but is not limited to removal and/or collection and disposal of all wastewater where required, for all work that impacts existing infrastructure prior to, and during connections to said existing infrastructure. Temporary works including but not limited to security fencing, Traffic Control Plan, signage, shoring, dewatering, sedimentation control, flushing & disinfection valves, temporary water service, etc.; Approximately 190 linear meters of concrete curb and gutter; Approximately 120m of variable concrete sidewalk; Approximat...
Show Categories : Construction, Infrastructure, Heavy Construction - Earth Handling Equipment (Industrial), Services, Supplies and Equipment
More Details
Bid Classification: Construction
Closing date01-13-2026
Documents
Tender Notice