Structural & Building Envelope Restoration Building Renovations - Major Projects Buildings - Demolition for More Information Contact: Pettit, Eric C.Design Engineer Village of Salmo Wsp Canada Inc. 301 - 3600 Uptown Boulevard Victoria, British Columbia V8z 0B9 Phone: 1 (250) 3845510 Fax: Email:
[email protected] Project Overview the Project Generally Consists of Renovations to an Existing Sludge Building, Demolition of an Existing Headworks Building, and Construction of a New Headworks Building at the Existing Waste Water Treatment Plant Located at 124 Lagoon Road in Salmo Bc. Installation of Underground Electrical Conduit from the Sludge Building to the Adjoining Structures and Equipment is Also Included. the Facility is an Operating Sewage Treatment Facility, and Work Must be Done to Minimize Disruption of Operations. No Electrical will be Done Within Walls or Roof Structures, All Electrical Work will be Surface Mounted. All Electrical Work will be Performed by the Owners Current Electrical Contractor, Tri-Valley Electric. a Non-Mandatory Site Meeting will be Held on February 20, 2019 at 10:30 Local Time. the Facility is Located at 124 Lagoon Road, Salmo Bc. All Tender Enquiries Are to be by E-Mail to Address Noted Above. Concrete Work - Strip Footings and some Pad Footings - Foundation Walls and some Short Piers - some Interior Upstand Walls on Existing Slabs - New Interior Slab for the Headworks Building, Approx. 48 Square Metres. - Exterior Slab Under Headworks Dormer, Approx. 3 Square Metres. Wall Framing - Standard 2X6 Construction, R24 Mineral Insulation, and Vapour Barrier. - Interior Walls Are All 2X6 Construction, with Sound Guard Mineral Insulation, and Vapour Barriers on Both Sides. - Interior of All Walls Are Sheathed with 1/2 Plywood, Painted White - Exterior of the Sludge Building Addition is 1/2 Plywood with Prefinished Vertical Metal Siding. - Exterior of the Headworks Building is 1/2 Plywood with Strapping and Horizontal Hardi-Plank Siding. - Installation of Windows and Doors: O Vinyl Windows, Horizontal Sliders O Man Doors, Insulated Steel Doors O Overhead Sectional Door, Insulated Metal Demolition of the Existing Headworks Building - Demolition and Disposal of the Following: O Existing Building is 2X6 Wood Framing on a Slab on Grade. O Existing Building is 5M X 2.5 M, with Metal Exterior Siding and Plywood Interior. O Existing Roof is Shed Style with Metal Roofing. O Slab on Grade is Approximately 9.5 Square Metres O an Existing Mechanical Screen Remains in Operation in the Existing Trench. Electrical Conduit - Approximately 100 Lineal Metres of Electrical Trenching and Backfilling for Rpvc Conduit Between the Sludge Building and Other Buildings and Equipment. - Approximately 150 Linear Metres of 53Mm Rpvc Power Conduit, Complete with Pull Lines and Caps. - Approximately 135 Linear Metres of 35Mm Rpvc Control Conduit, Complet...