Procurement Summary
Country: USA
Summary: Vizcaya Museum and Garden Farm Village Building Stabilization
Deadline: 28 Sep 2016
Posting Date: 15 Sep 2016
Other Information
Notice Type: Tender
TOT Ref.No.: 8200233
Document Ref. No.: -
Competition: ICB
Financier: Self Financed
Purchaser Ownership: -
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Install new metal flashing with a slope not less than 45 degrees to shed water where full size screen assemblies have been attached to the face of the building to avoid mold and mildew growth. . Where full size screen assemblies about the floor or base they shall be modified to ensure that a free flow of water can escape. Remove branches and foliage from overhanging buildings and roofs. Clean all mold and mildew from building surfaces including coral rock, stucco, roofs wood and tile. Install new copper gutters and downspouts to match the original as required. Remove or repair wrought iron balusters and handrails as required. Clean existing sump and french drains or install new french drains as required. Fix with lime rich mortar to match adjacent work, seal cracks and gaps with mortar to prevent seeping. Remove and replace broken tiles. Cracks at roof eaves shall be filled to prevent water draining from roof and falling rain. Remove leaves, roots, vines, plant materials and accumulated organic debris growing on roofs, walls and interiors. Repair all stucco and coral rock cracks accordance with the technical notes # 9, 4, and 16. All areas exhibiting concrete spalling or concrete cracks shall be repaired in accordance with the recommendations of the structural stabilization . Repair stucco as required accordance with technical note # 13. Replace electrical plates as required. All original electrical plates shall be retained for re-use and or as sample for future restoration. Covers for electrical panels shall be provided as required. Turn off all breakers not required for lighting or ac operation. See electrical stabilization recommendations for each building. Penetrations in walls from pipework, conduits shall be repaired. New penetrations shall be sleeved and repaired as per technical note # 9-g. Windows shutters shall be removed and be cleaned of all debris, vegetation, roots, and vines; allow to dry out. Shutters shall be modified to provide weep holes at sills to enable water and moisture to drain freely. Caulk between window frames and adjacent finish as required. Caulk between door frames and adjacent finish as required. Install new copper roof flashing where are deteriorated, damaged and missing. Repair rotted floor sheeting, rotted wood and floor system as per structural stabilization report. Repair crack at chimney as per structural stabilization report. Repair rotted wood beams as needed accordance with the structural stabilization report. See sheet 1-s301. Exterior and interior doors shall be treated accordance . Interior doors shall be secured in an open position for each air condition zone. See mechanical stabilization report. Repair the existing hvac system as needed to dehumidify and maintain adequate environmental conditions. See mechanical stabilization recommendations for each building. Turn off all breakers not required for ligh
Documents
Tender Notice