Procurement Summary
Country: Hungary
Summary: Utilization of Geothermal Energy Development 2.
Deadline: 24 Apr 2026
Posting Date: 16 Mar 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 137891821
Document Ref. No.: 179410-2026
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
45000000 - Construction work
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
The municipality of Mezőcsát wants to ensure the heating of the town's public institutions with geothermal energy. For this purpose, they would use the barren hydrocarbon research borehole marked MEZŐCSÁ - 1 on the border of the settlement. In the framework of the project, in the northern border of the settlement, a From Beach Bath approx. We are planning to convert a 600 m distance, barren research well for hydrocarbons drilled and sealed in the 90s, into a thermal well. A for a yield of 700 [litres/minute], He created a thermal water heat source in the thermal bath, forecasted to be 57 °C leading to a heat center, we want to connect it to a newly developed district heating system, which will partially replace the current use of natural gas for heating purposes in the 13 municipal properties. Stage 1: WELL TRAINING: Drilling and installation of the drilling equipment after that, the 3" Christmas tree mounted on the well must be dismantled, and a blowout preventer must be built on the 9 5/8" inlet pipe head. After that, the exploratory borehole will be cleaned up to 1071 m, i.e. up to the top of the cement plug. The original must be refined with natural gamma profiling in the geophysical profile, the depth of the layers included in the plan, then in their actual level, with 24 shots per meter, the following layers must be opened in the 7" casing pipe with jet perforation: up to 815 - 820 m, up to 956 - 967 m, up to 971 - 976 m, up to 1020 - 1025 m, 1060 - 33 fm in total up to 1067 m. Perforation should be done gradually from bottom to top. After that, a cleaning compressor must be carried out until the maximum sand-free well performance is achieved. At that time, the preliminary examination must be completed...
Document Type: Contract Notice Reference Number: EKR002281652025 Contract Type: works Authority Type: la Doc Title: Utilization of geothermal energy development 2. Dispatch Date: 2026-03-13 Publish Date: 2026-03-16 Submission Date: 2026-04-24
Documents
Tender Notice