1.1. The contractor shall be responsible for furnishing all personnel, supervision, materials, tools, equipment, supplies, vehicles, and any other resources necessary to accomplish the requirements of this contract contained herein and as included in the contract specifications and drawings which form a part of this contract. The
contractor shall repair damaged turf softball field.
2. Principle features: this project includes the following principle features:
2.1. Structural work
2.1.1. Repair damaged synthetic turf with attached drawing, turf manufactured by kolon ag9200 series equal
or above.
2.1.2. 2ea pitcher (6mx6m) and 2ea catcher zone (6mx6m) will be covered with existing red.
2.1.3. 4ea side line area, will be replace turf, elastic pad, each place approximately (120m x0.4m).
2.1.4. 4ea spot repair place: repair base and install turf, according to the drawing.
2.1.5. Repaired turf will be covered with rubber chips or stone powder, according to the manufacture s
specification. Please consult the list of document viewers if you cannot open a file.
Solicitation w/ drawings
type: other (draft rfps/rfis, responses to questions, etc..) label:
solicitation w/ drawings
posted date: august 16, 2016 w90vn6-16-r-0022_-_softball_field_repair.pdf (81.81 kb)
description: solicitation
synthetic_turf_ag9200.pdf (175.65 kb)
description: turf requirement
floor_plan.pdf (206.46 kb)
description: floor plan - softball field
osan air base,
republic of korea
non-u.s.
Korea, south
primary point of contact.:
royston s. Voglezon,
contract management officer
[email protected]phone: 3157841148secondary point of contact:
pyongha. Hwang,
contract specialist
[email protected]phone: 3157849190 all files
solicitation w/ drawings
aug 16, 2016
w90vn6-16-r-0022_-_s...download/view w90vn6-16-r-0022_-_softball_field_repair.pdfsynthetic_turf_ag920...download/view synthetic_turf_ag9200.pdffloor_plan.pdfgeneral information
pyongha. Hwang,
contract specialist
[email protected]phone: 3157849190 all files
solicitation w/ drawings
aug 16, 2016
w90vn6-16-r-0022_-_s...download/view w90vn6-16-r-0022_-_softball_field_repair.pdfsynthetic_turf_ag920...download/view synthetic_turf_ag9200.pdffloor_plan.pdfgeneral information
notice type:
combined synopsis/solicitation
posted date:
august 16, 2016
response date:
sep 01, 2016 11:59 pm eastern
archiving policy:
automatic, 15 days after response date
archive date:
september 16, 2016
original set aside:
n/a
set aside:
n/a
classification code:
z -- maintenance, repair, and alteration of real property
naics code:
236 -- construction of buildings/236220 -- commercial and institutional building construction
for help: federal service deskaccessibility
z -- maintenance, repair, and alteration of real property
naics code:
236 -- construction of buildings/236220 -- commercial and institutional building construction
236 -- construction of buildings/236220 -- commercial and institutional building construction
for help: federal service deskaccessibility
added: aug 16, 2016 3:54 am