5131C: Highways, Roads, Railways, Airfield Runways 5131Bi: Asphalt and Joint Sealing Services 5131Bb: Paving Contractor Services (Except Mud Jacking) 5114C: Excavating and Earthmoving Work 5112B: Demolition Work 5139C: General Heavy Construction 5173C: Traffic Line Marking Bid Information Project Description: Highway 566:03 and Range Road 11 Roundabout Pre-Bid Meeting: N/A Bid Security: Each Bid Must be Accompanied by a Bond or Certified Cheque Equal to 10% of Tender. Tenders will be Opened by Department Staff, and All Bidders Are Invited to Attend Through Teleconference by Calling the Following Number: 1-888-875-1833 Participant Code: 680 448 669 Additional Requirements: Certificate of Recognition (Cor) Tendering Authority Contact Information: Tran, Hieu Project Procurement Officer 4999 - 98 Avenue, Twin Atria Building Edmonton, Ab T6b2x3 Tel: 780.422.7448 Email:
[email protected] Hard Copy Bid Documents: Open Hard Copy Plan Rooms: Documents Are Only Available for Download from Apc. Electronic Plan Rooms: Alberta Purchasing Connection Buildworks Canada Opportunity Description: Tender Available Date: September 10, 2020 Tender Closing Date: October 1, 2020. Sealed Tenders will be Received in the Procurement Strategy and Planning Section, Suite, 303, Third Floor, Twin Atria Bldg., 4999 - 98 Ave., in Edmonton, Ab, Before 2:01:00 P.M., for Construction of the Following Work: Tnd0021398 Highway 566:03 and Range Road 11 Roundabout Southern Region Approximate Quantities: 31, 909 Tonnes Supply of Aggregate - No Option 44, 300 Cubic Metres Common Excavation 23, 800 Cubic Metres Borrow Excavation - Contractor Supplied 80.6 Metres Culverts - Supply and Install 21, 700 Tonnes Granular Base Course 8, 400 Tonnes Asphalt Concrete Pavement 4, 790 Square Metres Cold Milling Asphalt Pavement Contractor to Supply All Materials. Contract Completion Date: July 15, 2021. Project Inquiries: Hieu Tran, Project Procurement Officer, Alberta Transportation E-Mail:
[email protected] Alberta Transportation
Expires Date : 10.01.2020
Category : Construction
Posted : 09.10.2020