Procurement Summary
Country: Luxembourg
Summary: The Civil Engineering Mission of this Contract Concerns the Design Studies and the Execution Studies Necessary for the Creation of a Nearby Ettelbruck Bypass. the Future...
Deadline: 30 Jul 2026
Posting Date: 10 Jun 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 143014540
Document Ref. No.: 2600080
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
The civil engineering mission of this contract concerns the design studies and the execution studies necessary for the creation of a nearby Ettelbruck bypass. The future bypass will connect the N15 (route de Bastogne) to Ettelbruck to the town of Warken and the B7 interchange located between Schieren and Ettelbruck. It will allow, in the long term, a calming and fundamental redevelopment of the N7 and N15 west of Ettelbruck. The length of the bypass in question will be approximately 2, 730m, and will include two tunnels of approximately 735m and 995m, as well as three engineering structures, the first of which will span the Alzette valley, a second the Grondwee and the Haupeschbaach and a third the Wark. Ettelbruck proximity bypass (B7/N15/CR349) - Phase 1 Call for applications
Deadline for submission of envelopes: 07/30/2026 10:00 a.m.
Documents
Tender Notice