Expired Tender Switzerland ICB TOT Ref. 8438454

Tender bkp 212 Tender in Switzerland - 8438454

Tender notice from Switzerland, published on 01 Oct 2016.

Executive Summary

The SCHULGEMEINDE KA has issued a Tender notice for the procurement of a Tender bkp 212 in the Switzerland. This Tender notice was published on 01 Oct 2016 and is scheduled to close on 09 Nov 2016, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 8438454, while the tender notice number is 933117 and Register on the platform.

Key facts

Summary
Tender bkp 212
TOT Ref. No.
8438454
Document Ref. No.
933117
Country
Switzerland
Notice type
Tender
Competition
ICB
Publication date
01 Oct 2016
Bid deadline
09 Nov 2016
EMD
Refer Document
Tender value
Refer Document
Purchaser ownership
-
Financier
Self Financed

Purchaser details

Purchaser contact is for registered users

Login to see details

Tender details

Tender bkp 212

brief description of bauvorhabensstaedtebau and architekturdas existing schoolhouse from 1962 no longer is enough to spatial, pedagogical, energy and safety standards. After a feasibility study, the school community kuesnacht has therefore led by a project competition for a new school facility goldbach year of 2010. Bgm architects, basel, went with her contest entry diego emerged as the winner of the advertised through the school community in an open process, and carried out the architectural competition. After projektwettbewerb a study on the reduction of the ground and thus the buildings around 1.60 m opposite the competitive state was developed by architects bgm. The excavation oftotal 2.60 opposite the present level of the sports field was the building committee of the municipality is kuesnacht with preliminary decision from 26.03.2013 bewilligt.die new school complex goldbach schoolhouse and kindergarten. The two different sizes and freestanding buildings border the playground, which forms the center of the plant. The open arrangementtakes the greatest possible consideration for the needs of the surrounding residential buildings by lake view and good tanning. The school system is developed by the b hlstrasse and assigned to this. The public buildings gets so adequate praesenz in street image. The arrangement of the buildings provides versatile functional aussenraeume very differentthe library, media library, drawing / crafts, the workshop, the office of the school management as well as the teachers`` rooms are located on the ground floor. The center of the school building is the inner hall, which is separated from the auditorium by a flexible partition. For bigger eventsis the recreation hall of the auditorium can be activated. The mobile stage can be placed depending on the occasion and allows various spatial concepts. The two upper floors are the 7 classrooms and hand working space. The unterrichtsraeume are oriented east and west. They form a flexible system with class and gruppenraeumen, including the insidelying and by skylights exposed half classroom can be switched. In the base of the school is the course exposed gym. This comprises a separate access directly b hlstrasse, which facilitates the use by external, such as football. The kindergartengebaeude includes three classes. The kindergartens verfuegen by a separate outer space which is directly accessible from the classes. The kindergarten is thus handicapped accessible also on the first floor. The for educational purposes necessary materials can be stored in built-in wardrobes in the classrooms. The proximity of the kindergartens to the schoolhouse allows easy access tothe sharable spaces such as gym and bibliothek.die high compactness of the building gewaehrleistet a favorable ratio of volume to building envelope. With the clear outer shape without large rueckspruenge is achieved with a sufficient insulation of the minergie standard. Certification is provided. The energy supply is based on a regenerative energy geothermal installation. Using a heat pump heating is put at your disposal. The building is partly mechanically ventilated. All unterrichtsraeume lying on the facade, however ventilated naturally by controlled fensterlueftung. Were to achieve a sustainable concept among others the following additional measuretook met: high thermi-cal quality of the building envelope, large speicherfaehigkeit by massive construction, exterior efficient sun protection, good daylighting of the class room by large fensteroeffnungen and skylights, one above the other lying wet areas and optimized risers. On the roof of the kindergarten a photovoltaic system is sheet ifrsen.die facade of the school building and the kindergarten are made of artificial stone elements. These are added as a supplement with limestone and enriched with colored pigments. The cast stone elements are sandblasted, creating a natursteinaehnliche, busy surface. The windows are wood-metal windows with dreifachver-glazing, laminated pane safety glass and an external sun protection. The premises are minted by brightly varnished concrete, a bright color scheme and fittings made of solid wood in natural oak. As a flooring terrazzoartiger, polished concrete floor and parquet comes in the classrooms to anwendung.landschaftsarchitekturder new school goldbach is veran topographically in green quarterkert. Its outdoor area takes characteristic features of the garden landscapes of the neighborhood on, therefore fits into its context and presents it in a by-level zusammenhang.ueber a generous outdoor staircase you step on the level of the playground, which creates a link between kindergarten and school building. Slope side includes a strong green heckenkoerper from chopped laubgehoelzen the yard. In addition to its atmospheric quality and schalldaempfenden effect he is mediating part of gehoelzrands limiting the outdoor area and it is possible to appear as a unit. Blooming shrubs of different types and heights include the various gartenraeume for game and asubsistence both in the kindergarten and in the public part to zuerichstrasse out. Trees and shrubs of native trees and parkbaeumen in meadows and lawn rich terrain underline the park-like character of gesamtanlage.der outside the kindergarten has the configuration of the slots at gehoelzsaumes for sand play, rasenspielflaechs and seatings. A small geraetehaeuschen enriches the offer. The garden is directly accessible by the unterrichtsraeume, but can also be accessed via road or the schoolyard. Thus, at the same time the behindertenzugaenglichkeit kindergartengebaeudes is gewaehrleistet. Overall, the garden is but reserve for the smallest pupils and schuelerinnenen.der garden area of the school, however, is designed as a publicly accessible park, which is opened up by the zuerichstrasse. It also aims to weekends and holidays at all times be accessible during and be inviting to the nearby residents. Ground-level play with water, sand and natural materials has its place here. The existing fountain sculpture -

Documents

Tender Notice
Login to view

Switzerland Public Procurement Intelligence

Frequently asked questions

The bid deadline for Tender bkp 212 was 09 Nov 2016. Bidding is closed.

This tender has been issued by SCHULGEMEINDE KA in Switzerland.

The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.

This tender is Self Financed

The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.

The TendersOnTime reference is 8438454. The purchaser document reference is 933117.

Browse other tenders from Switzerland or search by relevant keywords and CPV classification.