Technical and General Specification of Tank Tender in UAE - 50516622
Tender notice from UAE, published on 23 Feb 2021.
Executive Summary
The DUBAI ELECTRICITY & WATER AUTHORITY (DEWA) has issued a Tender notice for the procurement of a Technical and General Specification of Tank Integrity Analysis in the UAE. This Tender notice was published on 23 Feb 2021 and is scheduled to close on 28 Feb 2021, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 50516622, while the tender notice number is 2332100405 and Register on the platform.
Key facts
Summary
Technical and General Specification of Tank Integrity Analysis
Quotation are invited for Technical and General Specification of Tank Integrity Analysis. TECHNICAL AND GENERAL SPECIFICATION OF TANK INTEGRITY ANALYSIS AT M STATION, JEBEL ALI POWER STATION. 1.#INTRODUCTION : INTEGRIT Y ANALYSIS, FITNESS FOR SERVICE ASSESSMENT, RLA AND CALIBRATION OF DFO STORAGE TANKS & RECIRCULATION TANKS AT DEWA. CONDUCT INTERNAL /EXTERNAL INSPECTION AND RECOMMENDED NDT ANALYSIS IN COMPLIANCE TO API 653. ON THE BASIS OF FINDINGS IN NDE, FITNESS FOR SERVICE ASS ESSMENT SHALL BE CARRIED OUT AND RECOMMENDATIONS FOR REPAIR (IF ANY) SHALL BE PROVIDED. STORAGE TANKS NO. 2 & 6 TANK SIZE: 38500 MM ID X 19585 MM HIGH TYPE OF TANK: CONE ROOF CYLINDRICAL TANK CAPACITY (TOTAL): 22800 CU. M DESIGN CODE: API STD 650, 10TH EDITION DE SIGN PRESSURE: ATM QTY 2 NOS RECIRCULATION TANKS NO. 1 & 2 TANK SIZE: 8100MM ID X 7635 MM HIGH TYPE OF TANK: CONE ROOF CYLINDRICAL TANK CAPACITY (TOTAL): 402 CU. M DESIGN CODE:API STD 650, 10TH EDITION DESIGN PRESSURE: ATM QTY 2 NOS 2.#PERIOD OF WORK: 4 DAYS/S TORAGE TANK & 2 DAYS/RECIRCULATION TANK 3.#SCOPE OF WORK: 3.1.#SCOPE OF WORK INCLUDE, BUT NOT LIMITED TO THE FOLLOWING 3.1.1.#THE CONTRACTOR SHALL VISIT THE SITE AND MAKE HIMSELF FULLY FAMILIAR WITH THE WORK SCOPE, PLANT ACCESS, FACILITIES, COMPLEXITIES, SAFETY MEASURES ETC., BEFORE HE SUBMIT HIS BID. 3.1.2.#CHECK CONDITION SUITABLE TO CARRY OUT WORK. CONDUCT SITE SURVEY AND SAFETY INSPECTIO N TO ASSESS THE WORKING ENVIRONMENT. 3.1.3.#IF WORKING ENVIRONMENT IS SAFE, PROCEED THE FOLLOWING STEPS. 3.1.4.#MOBILIZE THE API AUT HORIZED INSPECTOR WITH SUITABLE INSPECTION TOOLS, PPES AND CONSUMABLES, ETC. ON 3 DAYS# NOTICE PERIOD. 3.1.5.#TO PROVIDE SERVICES OF EXPERIENCED AND CERTIFIED INSPECTORS. 3.1.6.#ALL EQUIPMENT NECESSARY TO EXECUTE INSPECTION AND MEASUREMENT SHALL BE THE SCOPE OF CO NTRACTOR. 3.1.7.#CONTRACTOR SHALL CARRY OUT INTEGRITY ASSESSMENT, RLA & FFS 3.1.8.#TO COLLECT DATA ON ORIGINAL DESIGN AND FABRICATIO N PRACTICES, THE MATERIAL OF CONSTRUCTION, AND THE SERVICE HISTORY. 3.1.9.#DEVELOP INTEGRITY MANAGEMENT PLAN (IMP) 3.1.10.#PREPARE I NSPECTION TEST PROTOCOL (ITP) TO IMPLEMENT IMP AND TO COLLECT NDE DATA ON PRESENT CONDITION OF THE ASSET UNDER SCOPE. 3.1.11.#ITP SH ALL HAVE NECESSARY INSPECTION-RELATED INFORMATION DETAILING ALL THE COMPONENTS/STRUCTURES WITHOUT ANY EXCEPTION, TO PLAN THE ACTIVIT IES DURING SHUTDOWN INSPECTION. 3.1.12.#A MARKUP DRAWING SHALL BE PREPARED SHOWING ALL THE CML LOCATIONS. A UNIQUE IDENTIFICATION HA S TO BE DEVELOPED FOR CMLS. COPY OF EXISTING DRAWINGS SHALL BE USED TO MARK CML POINTS. 3.1.13.#ALL NDE SHALL BE IN THE SCOPE OF CON TRACTOR ALONG WITH THEIR TEST EQUIPMENT, TOOLS, TACKLES, CONSUMABLES AND CERTIFIED PERSONNEL. COMPARISON AGAINST REQUIREMENTS PROVID ED IN THE DRAWINGS TO BE MADE BY THE CONTRACTOR. 3.1.14.#CALIBRATION OF TANK BY EODR (ELECTRO OPTICAL DISTANCE RANGING) METHOD BY AU THORIZED PARTY. 3.2.#TANK EXTERNAL OUT OF SERVICE INSPECTION: 3.2.1.#THE EXTERNAL INSPECTION MUST BE CONDUCTED BY AN AUTHORIZED INS PECTOR. 3.2.2.#A COMPLETE VISUAL INSPECTION SHALL BE PERFORMED TO IDENTIFY ANY SURFACE DEFECT. 3.2.3.#CHECK THE FOUNDATION, SHELL, A CCESSORIES AND ROOF. 3.2.4.#THE OBSERVATIONS SHALL CONCENTRATE ON LEAKAGE FROM UNDER THE BOTTOM, SHELL SETTLEMENT, VERTICALITY, SHELL DEFORMATIONS (FLAT SPOTS, BUCKLES OR BULGES), CORROSION SPOTS ETC. 3.2.5.#THE OBSERVATIONS SHOULD INCLUDE THE CONDITION OF PAINT W ORK, SAFETY OF STAIRS, PLATFORMS AND HANDRAILS AND PROPER FUNCTIONING OF SERVICE EQUIPMENT. 3.2.6.#INSPECTION AND MONITORING ALL LEA K DETECTION SYSTEMS, CATHODIC PROTECTION MONITORING EQUIPMENT OR OTHER MONITORING OR WARNING SYSTEMS WHICH MAY BE IN PLACE AT THE FA CILITY. 3.2.7.#WALL THICKNESS MEASUREMENT TO BE DONE FOR SHELL AND ROOF. A SUITABLE ULTRASONIC THICKNESS MEASUREMENT TECHNIQUE SHALL BE APPLIED. 3.2.8.#WHEN THERE IS CONCERN THAT THERE MAY BE CRACKING IN WELDS OR IN OTHER PARTS OF THE TANK THEN THE DEFECTS SHALL B E VERIFIED BY APPLYING AN APPROPRIATE NON-DESTRUCTIVE TESTING TECHNIQUE, E.G. RADIOGRAPHY OR ULTRASONIC TEST, DYE PENETRANT OR MAGNE TIC PARTICLE EXAMINATION. 3.2.9.#SURFACE CORROSION, WELD DEFECTS OR COATING TO AN EXTENT, WHICH COULD AFFECT THE INTEGRITY OF THE TA NK SHALL BE INSPECTED BY APPROPRIATE METHODS. 3.2.10.#THE TANK SHELL SHALL BE INSPECTED FOR SIGNS OF DEFORMATION (FLAT SPOT, BUCKLE OR BULGE), LEAKAGE OR CORROSION OF BOTTOM EDGE AND SHELL PLATES. 3.2.11.#STIFFENING RINGS TO PREVENT BUCKLING DUE TO WIND LOADS AND HIGH THERMAL STRESSES AT LOW AMBIENT (WINTER) TEMPERATURES SHALL ALSO BE CHECKED. 3.2.12.#IF THERE ARE INDICATIONS THAT CORROSION HA S PENETRATED THE ROOF, ACCESS TO THE ROOF SHALL BE PROHIBITED. 3.2.13.#THE FOLLOWING ELEMENTS SHALL BE INSPECTED BUT NOT LIMITED TO BY AN APPROPRIATE METHOD TO ENSURE THAT THEY ARE IN GOOD CONDITION: ·#STRUCTURES SUPPORTING AND REINFORCING THE TANK ·#MEANS OF ATTA CHMENT TO TANK SYSTEM ·#ANY SERVICE EQUIPMENT LIKE LEVEL GAUGES, EARTH LUG, BREATHERS, HEAT DETECTORS, STAIRS ETC. ·#DRAINS, TRENCHE S, DRAIN COLLECTION PIT AND INTERCEPTOR ETC. ·#FIREFIGHTING ACCESSORIES AND SYSTEM 3.2.14.#IT SHALL ALSO INCLUDE THE CONNECTED PIPEL INES AND BELLOWS FOR PUNCTURE OR CRACKS. 3.2.15.#THE PROPER FUNCTIONING OF EXTERNAL EQUIPMENT SUCH AS VENTS, PRESSURE/VACUUM VALVES, GAUGING DEVICES AND WATER-DRAINING EQUIPMENT SHALL BE ESTABLISHED. 3.2.16.#FLEXIBLE JOINTS AND FIXED HOSES AS PART OF THE FILLING A ND/OR DISCHARGING SYSTEM SHALL BE VISUALLY INSPECTED. 3.2.17.#BOLTED FLANGES, CAPS TO VALVES AT BOTTOM OUTLETS SHALL BE CHECKED FOR WORN THREADS AND DAMAGED GASKETS 3.2.18.#ALL SERVICE EQUIPMENT INCLUDING ANY PERMANENTLY ATTACHED HOSES SHALL BE INSPECTED IN THE M OUNTED POSITION FOR CORRECT FUNCTIONING. 3.2.19.#IN ADDITION TO A GENERAL INSPECTION OF THE STEELWORK PARTICULAR ATTENTION SHALL BE PAID TO: SUPPORTS TO TANK SHELL, INTERMEDIATE PLATFORMS AND HAND RAILING, CONCRETE PEDESTAL SUPPORTS FOR STAIRWAYS, THE CRACKS IN TH E TANK CONCRETE FOUNDATION 3.2.20.#THE PART OF THE FOUNDATION WHICH PROJECTS BEYOND THE BASE OF THE TANK (THE SHOULDER) SHALL BE INS PECTED TO VERIFY THAT THE TANK BOTTOM SEALING IS IN GOOD CONDITION AS IT IS POSSIBLE THAT MINOR, EVEN SETTLEMENT OF A TANK WILL FORM A CHANNEL AROUND THE PERIPHERY OF THE TANK BOTTOM IN WHICH RAINWATER WILL COLLECT AND CAUSE SERIOUS CORROSION OF THE BOTTOM-TO-SHELL CONNECTION. 3.2.21.#THE SLOPE OF THE SHOULDER OF THE TANK CONCRETE FOUNDATION SHOULD ENSURE GOOD DRAINAGE OF RAIN WATER. 3.2.22.#S HELL SETTLEMENT, VERTICALITY, SHELL DEFORMATIONS TO BE MEASURED 3.2.23.#OUT OF SERVICE INSPECTION REPORT TO BE FILLED ADDITION AS PE R API STANDARD. 3.3.#TANK INTERNAL OUT OF SERVICE INSPECTION: 3.3.1.#DETERMINING THE CONDITION AND INTEGRITY OF THE TANK BOTTOM. 3. 3.2.#THE AUTHORIZED INSPECTOR WHO IS RESPONSIBLE FOR EVALUATION OF A TANK MUST CONDUCT A VISUAL INSPECTION AND ASSURE THE QUALITY. 3 .3.3.#A COMPLETE VISUAL INSPECTION SHALL BE PERFORMED TO IDENTIFY ANY SURFACE DEFECT AND SHALL TAKE ACCOUNT OF THE ORIGINAL SPECIFIC ATION. 3.3.4.#THE INSPECTION METHODS SHALL BE CAPABLE OF ASSESSING THE THICKNESS OF THE TANK BOTTOM, IN COMBINATION WITH METHODS CAP ABLE OF ASSESSING TANK BOTTOM INTEGRITY. 3.3.5.#THE AUTHORIZE INSPECTOR SHALL ENSURE THE COMPETENCE OF NONDESTRUCTIVE EXAMINATION (N DE) RESULTS BY SUITABLE METHODS. 3.3.6.#ANY LINING OR COATING SHALL BE VISUALLY INSPECTED FOR INTEGRITY. IN PARTICULAR BONDING DEFEC TS OR DELAMINATION SHALL BE IDENTIFIED AND RECORDED IN THE REPORT. 3.3.7.#THE BOTTOM PLATE THICKNESS SHALL BE ASCERTAINED BY NON-DES TRUCTIVE TESTING LIKE ULTRASONIC TESTING, MAGNETIC FLUX LEAKAGE (MFL) TEST OR ANY OTHER SUITABLE APPROVED TECHNICS. 3.3.8.#GATHER TH E DATA NECESSARY FOR THE MINIMUM BOTTOM AND SHELL THICKNESS ASSESSMENTS DETAIL. 3.3.9.#THE DATA AND INFORMATION COLLECTED SHOULD BE SUFFICIENT TO EVALUATE THE THICKNESS, CORROSION RATE, AND INTEGRITY OF THE TANK BOTTOM AND ESTABLISH THE INTERNAL INSPECTION INTERVA L, BASED ON TANK BOTTOM THICKNESS, CORROSION RATE, AND INTEGRITY, UTILIZING THE STANDARD METHODS. 3.3.10.#THE AUTHORIZED INSPECT Qty: 2 STANDARD TERMS & CONDITIONS
1) Prices should be `DDP` delivery duty paid at DEWA stores.
2) Quotation to be submitted only in local currency U.A.E Dirhams
3) DEWA Standard payment terms is `30 days credit` from the date of acceptance of material
4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest.
The bid deadline for Technical and General Specification of Tank Integrity Analysis was 28 Feb 2021. Bidding is closed.
This tender has been issued by DUBAI ELECTRICITY & WATER AUTHORITY (DEWA) in UAE.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 50516622. The purchaser document reference is 2332100405.
Browse other tenders from UAE or search by relevant keywords and CPV classification.