Procurement Summary
Country: Philippines
Summary: Tactical Emergency Operations Center Upgrading and Installation
Deadline: 23 Dec 2019
Posting Date: 30 Nov 2019
Other Information
Notice Type: Tender
TOT Ref.No.: 38470492
Document Ref. No.: 11-012-937-19
Competition: ICB
Financier: Self Financed
Purchaser Ownership: -
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Tactical Emergency Operations Center Upgrading and Installation
Republic of the Philippines
Province of Aklan
Municipality of Kalibo
INVITATION TO BID
FOR THE
TACTICAL EMERGENCY OPERATIONS CENTER UPGRADING AND INSTALLATION
The Municipality of Kalibo, through the General Fund 2019, intends to apply the sum of Five Hundred Thousand Pesos (Php500, 000.00) being the Approved Budget for the Contract (ABC) to payments under the contract for the Tactical Emergency Operations Center Upgrading and Installation. Bids received in excess of the ABC shall be automatically rejected at bid opening.
The Municipality of Kalibo now invites bids for:
Item No. Description Qty. Unit
1 Tactical Emergency Operations Center 1 lot
Upgrade
- Two (2) 1-touch 1-second employee
recognition
Capacity to store 2200 template and
50000 transactions
No need to enter PINs
Access control: supports 50 time zones,
5 groups and 10 unlock combinations
Tamper-proofs switch and alarm outputs
Request-to-exit and alarm contacts
Operates stand-alone without a computer
TCP/IP, serial and Wiegand interfaces
Real-time 1-touch data export to 3rd party
hosted & non-hosted application
Audio-Visual indications for acceptance
& rejection of valid and invalid fingerprints
SDK available for OEM customers and
software developers
Keyboard and Display: LCD 80 character
and figures keypad
power:12V
UID Changeable Proximity Smart Card Specification:
Frequency: 13.56MHz
Capacity: 1024 bytes EEPROM memory
Rewrite times: 100, 000 times
Read distance:0-10Cm (depend on the R/W device)
Material: PVC
Size:84*54*0.8mm, Drop Bolt Lock for Fully
Frame Less Glass Door, power supply, battery,
ZL Brackat, L Brackat, RfiD control and remote,
k24 door exit with housing.
- One (1) 8CH Interior CCTV set with 2TB
Hard drive, 8ch Power Supply, 200m siamese cable
wire
- One (1) 3.0 HP AC Inverter split type
- One (2) 1.5 HP AC Inverter split type
- One (1) Glass Swing Door ED type sing slash
90x219cm, fix side light A1/4 clear glass 48/96 8 units
- Four (4) Interior CCTV camera
One (1) unit 6TB Storage Drive for CCTV Interface
SATA 6Gb/s Form Factor 3.5 Inch Disk Speed 5400
rpm, 7200 rpm;
- Two (2) Tactical Emergency Operations Body Camera
- One (1) lot Installation and labor
Terms of Reference:
1. CCTV Cameras installed on designated areas,
equipment configured, tested and comissioned to
work efficiently;
2. Labor and professional services
(with Organizational Structure) should be included
for the Layout and Installation of Fiber Optic
cables, Splicing, Termination, Optical Network
Devices installation and Configuration, Testing and
Commissioning to Operate 24/7;
3. Call in immediate assistance to the Company-s
Service Center for maintenance and/or repair within
one (1) to two (2) hours of call from TEOC due to
time sensitivity including software assistance and
hardware repair;
4. Must be compatible to the current system at
the Tactical Emergency Operations Center-s
Command, Control, Communications, Coordination
and Intelligence Room based on the current
backbone system;
5. License Plate Recognition Cameras must have
at least 98% vehicle Plate Number capture rate
and 95% ANPR rate.
6. Conduct of hands-on training on the installation,
configuration, management and maintenance of the
Video Wall System, CCTV Management and Recording
System, and IT equipment, with at least 8 hrs per
system (Video Wall = 8hrs, Security Gateway
Appliances = 8hrs, Enterprise Fiber switch = 8hrs
and). Venue, Facilitators, Lunch, Snacks and
Certificates shall be provided free of charge to at
least ten (10) LGU Participants, conducted by a
Smart City System Certified Instructor from the
Company.
Delivery and Installation must be within Fifteen (15) days from the date of the issuance of the Notice to Proceed. Bidders should have completed, within two (2) years from the date of submission and receipt of bids, a contract similar to the Project. The description of an eligible bidder is conta...
Closing Date : 2019-12-23
Documents
Tender Notice