Surface Preparation and Protective Coating Tender in UAE - 49376974
Tender notice from UAE, published on 20 Jan 2021.
Executive Summary
The DUBAI ELECTRICITY & WATER AUTHORITY (DEWA) has issued a Tender notice for the procurement of a Surface Preparation and Protective Coating in the UAE. This Tender notice was published on 20 Jan 2021 and is scheduled to close on 24 Jan 2021, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 49376974, while the tender notice number is 2412100081 and Register on the platform.
Quotation are invited for Surface Preparation and Protective Coating. TECHNICAL AND GENERAL SPECIFICATION OF OUTSOURCING WORK M STATION, JEBEL ALI POWER STATION TITLE: SURFACE PREPARATION AND PROTECTIVE COATING OF NATURAL GAS PIPING (SPOT) AT `M` STATION, JEBEL ALI. 1.#SCOPE OF WORK 1.1.#THE SCOPE INCLUDES PROVISION FOR CARRYING OUT SPOT PAINTING WORK, SITE PREPARATION, SPOT SURFACE PREPARATION BY HYDRO WASHING, MANUAL/POWER TOOL CLEANING USING PNEUMATIC & SPARK PROOF TOOLS, SUPPLY & APPLICATION OF MOST SUITABLE PROTECTIVE COATINGS AS PER EXISTING COATING SYSTEM, ON EXTERNAL SURFACES OF NG P IPING 1.2.#SUPPLY OF WATER WASHING MACHINE AND ITS ACCESSORIES, ANY TEMPORARY WATER STORAGE EQUIPMENT, CLEANING AGENTS, ALL APPLICAB LE COATING MATERIALS, APPLICATION / INSPECTION TOOLS & EQUIPMENT AND ALL REQUIRED CONSUMABLES INCLUDING TARPAULIN/PLASTIC SHEETS TO PROTECT SENSITIVE EQUIPMENT FROM SPILL/SPLASH OF JETTING AND PAINTING MATERIALS TO BE PROVIDED BY CONTRACTOR. 1.3.#THE CONTRACTOR SH ALL VISIT THE SITE AND MAKE HIMSELF FULLY FAMILIAR WITH THE WORK SCOPE, PLANT ACCESS, FACILITIES, COMPLEXITIES, ETC., BEFORE HE SUBM IT HIS QUOTATION. DEWA WILL NOT ACCEPT ANY CLAIM FOR EXTRAS BEYOND THE ORDER RATES / PRICES DURING AND AFTER THE EXECUTION OF WORK O RDERED. 1.4.#COVERING OF NEARBY PIPING BY TARPAULIN OR ANY OTHER PROTECTIVE COVERS TO AVOID DAMAGE DURING HYDRO WASHING. 1.5.#COVERI NG OF FLANGE-TO-FLANGE JOINTS WITH CERAMIC TAPE TO AVOID WATER INGRESS IN THE GASKET SEATING AREA. 1.6.#DEGREASE THE SURFACE IF REQU IRED AS PER SSPC -SP01 STANDARDS. 1.7.#MANUAL CLEANING AS PER ST 2 AND POWER CLEANING AS PER ST 3 (ONLY BY PNEUMATIC AND NON-SPARK T OOLS). 1.8.#JOINT INSPECTION OF COMPLETE WORK AREA FOLLOWING THE CLEANING & BEFORE APPLYING THE PAINT/COATINGS TO ENSURE NO CORROSIO N DAMAGES, WHICH NEED TO REPAIR / REPLACE BY DEWA. 1.9.#THE CLEANED SURFACE SHALL BE COATED WITH ONE COMPLETE APPLICATION OF PRIMER AS SOON AS PRACTICABLE OR BEFORE ANY DISCOLORATION OCCURS ON THE SURFACE.# 1.10.#ANY CREVICES, MINOR SCRATCHES SHALL BE FILLED WITH COATING MANUFACTURER RECOMMENDED FILLERS PRIOR TO APPLYING THE COATINGS. 1.11.#COATING APPLICATION SHALL BE BY AIRLESS SPRAY ONLY AN D BY BRUSH/ROLLER ON NON-ACCESSIBLE AREAS.# 1.12.#APPLIED COAT SHALL HAVE MINIMUM DRY FILM THICKNESS ON EACH COAT. DURING COATING AP PLICATION-WET FILM THICKNESS, IF APPLICABLE, SHALL BE MEASURED TO CONFIRM DESIRED DFT WILL BE ACHIEVED. # 1.13.#WHERE COATING IS TO BE APPLIED BY BRUSH OR ROLLER CONTRACTOR TO ENSURE SMOOTH FINAL APPEARANCE WITH NEGLIGIBLE BRUSH MARKS LEFT IN THE APPLIED COATING.# 1.14.#ANY SPOTS OR REPAIRS IN APPLICATION SHALL BE COMPLETELY COATED BEFORE THE NEXT COAT IS APPLIED, WITHIN RE-COAT INTERVAL TIME. # 1.15.#TOPCOAT COLOR SHOULD BE IN COMPLIANCE WITH EXISTING COATING FOR ALL COMPONENTS 1.16.#REPAIRING AND REMEDIAL WORKS ON IDENTIF IED DEFECTS SHALL BE ACCORDING TO THE TOUCH UP AND REPAIR RECOMMENDATIONS OF COATING MANUFACTURER ONLY. # 1.17.#ANY CREVICES, MINOR SCRATCHES SHALL BE FILLED WITH COATING MANUFACTURER RECOMMENDED FILLERS PRIOR TO APPLYING THE COATINGS. 1.18.#PARTY HAS TO REPAINT / REMARK THE DIRECTION AND THICKNESS MEASUREMENT POINTS ON THE PIPELINE AS EXISTING. 1.19.#STAGE WISE COATING INSPECTIONS AND QUALITY ASSURANCE AT COMPLETION OF EACH ACTIVITY. 1.20.#PREPARATION OF CHECK LISTS AND REPORTS AT THE BEGINNING, DURING AND END OF EACH ACT IVITY. 1.21.#REMOVAL OF THE TARPAULIN OR ANY OTHER PROTECTIVE COVERS AFTER COMPLETION OF WORK. 1.22.#HANDING OVER FINAL REPORT WITH ALL CHECKLISTS TO CONCERNED DEWA ENGINEER. 2.#EXECUTION OF WORK 2.1.#THE WORK WILL BE CARRIED OUT IN BETWEEN MONTH OF DEC, 2020 TO OCT 2021 AS PER DEWA SCHEDULE. 2.2.#CONTRACTOR HAVE TO START THE WORK WITHIN 03 DAYS OF INTIMATION FROM DEWA AND SHALL COMPLETE ALL THE RELATED FORMALITIES LIKE MOBILIZATION OF STAFF, TOOL & PLANT MACHINERIES, GATE PASS ETC., WITH IN THE ABOVE MENTIONED PERIOD. 2. 3.#WORK ON EACH TRAIN TO BE COMPLETED IN 4 TO 5 DAYS. (THERE ARE TOTAL 06) 2.4.#THE WORK SHALL BE EXECUTED IN STAGES OF COATING PROC ESS WITH PROPERLY DOCUMENTED CHECKS AND CONTROLS AS PER APPROVED ITP, BY DEWA AND CONTRACTOR AT EACH STAGE. ALL INSPECTION REPORTS S HALL BE VERIFIED & APPROVED BY CONCERNED DEWA ENGINEERS BEFORE PROCEEDING TO THE NEXT STEP. # 2.5.#ANY DEFECTS DETECTED BY CONTRACTO R ON SURFACES DURING THE WORK PROCESS SHALL BE IMMEDIATELY REPORTED TO THE CONCERNED DEWA ENGINEER. 2.6.#ENVIRONMENT CONDITION SHALL BE CHECKED AND RECORDED BEFORE STARTING OF WORK AND EVERY TWO HOURLY ON SAME DAY UNTIL THE COMPLETION OF WORK. GENERAL CONDITIONS F OR ENVIRONMENT CONDITION SHALL BE AS BELOW:-#SURFACE TEMPERATURE SHALL BE BETWEEN 10 °C AND 40 °C 2.6.1.#RELATIVE HUMIDITY SHALL BE LESS THAN 85%. 2.6.2.#SURFACE TEMPERATURE SHALL BE MORE THAN 3OC OF MEASURED DEW POINT TEMPERATURE. 2.6.3.#THERE SHALL NOT BE RAIN O R STRONG WIND THAT CAN AFFECT CLEANLINESS OF THE SURFACES. 2.7.#IN CASE OF DIFFERENCE BETWEEN ABOVE ENVIRONMENT, REQUIREMENTS AND TH E COATING MANUFACTURER#S RECOMMENDATIONS THE COATING, MANUFACTURE#S RECOMMENDATIONS SHALL BE ADHERED TO. # 3.#WARRANTY 3.1.#THE JO B CARRIED OUT BY THE CONTRACTOR SHALL HAVE UNCONDITIONAL WARRANTY FOR A PERIOD OF 02 YEARS AGAINST ANY DEFECTS ATTRIBUTABLE TO POOR WORKMANSHIP, INCORRECT TESTING OR EXECUTION OF THE JOB OR IMPROPER SELECTION OF ANY MATERIAL OR MATERIAL. DURING WARRANTY PERIOD, AL L COATINGS SHALL BE FREE FROM ALL DEFECTS, BUT NOT LIMITED TO PINHOLES, BLISTERS, LOSS OF ADHESION, PEELING, CRACKS, ETC. PAINT COLOR SHALL NOT FADE WITHIN 02 YEARS. 3.2.#THE WARRANTEE PERIOD WILL COMMENCE FROM THE DEWA TAKEOVER DATE. SHOULD ANY DEFECT ARISE AFTER THE TAKEOVER DATE UP TO A PERIOD OF 02 YEARS, CONTRACTOR SHALL PROMPTLY RESPONSE AND RECTIFY THE DEFECTS AT HIS OWN COST INCLUDING INCIDENTAL EXPENSES TO ATTEND AND RECTIFY ANY SUCH DEFECTS AND PROVISION OF ANY ACCESS AND FALL PROTECTION FOR CARRYING OUT THE PAIN TING WORK.# 3.3.#CONTRACTOR, UPON COMPLETION OF WORK, SHALL PROVIDE VALID WORK COMPLETION AND WARRANTY CERTIFICATES TO DEWA.# 3.4.#W ARRANTY DEFECTS, IF ANY, SHALL BE ATTENDED FREE OF COST WITHIN SHORT NOTICE AT AN APPROPRIATE TIME DECIDED BY DEWA.# 3.5.#PRODUCT WA RRANTY CERTIFICATE FROM THE PAINT MANUFACTURER SHALL BE OBTAINED AND SUBMITTED. 4.#QUALIFICATION OF BIDDER 4.1.#AS A PRIMARY REQUIS ITE, BIDDER#S PRIMARY BUSINESS SHALL BE SPECIALIZED IN SURFACE PREPARATION AND COATING APPLICATION SERVICES, INSPECTION AND TESTING IN PROTECTIVE AND MARINE AND HEAVY COMMERCIAL INDUSTRIES WITH CONSOLIDATED PROVEN EXPERIENCE IN OR OUTSIDE UAE IN SIMILAR ENVIRONMEN T.# 4.2.#THE BIDDER SHALL HAVE SPECIALISTS TO DEPUTE A QUALIFIED COATING INSPECTOR (NACE COATING INSPECTOR LEVEL-2 CERTIFIED OR EQUI VALENT) WHO SHALL CONDUCT INSPECTIONS AND TESTING AT EVERY STAGE OF THE PROCESS AT DEWA PREMISES AND RELEASE/ISSUE REQUIRED CLEARANC E CERTIFICATES OF ACCEPTANCE/CLEARANCE TO DEWA.# 4.3.#BIDDER SHALL PROVIDE LIST OF CURRENT AND COMPLETED (SITE BASED) JOBS FROM LATE ST TO OLDEST WITHIN THE TIME FRAME OF AT LEAST PAST 2 YEARS. 4.4.#BIDDER SHALL AT ALL TIMES COMPLY WITH THE LAWS. Qty: 30 Surface Preparation and Protective Coating. STANDARD TERMS & CONDITIONS
1) Prices should be `DDP` delivery duty paid at DEWA stores.
2) Quotation to be submitted only in local currency U.A.E Dirhams
3) DEWA Standard payment terms is `30 days credit` from the date of acceptance of material
4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest.
The bid deadline for Surface Preparation and Protective Coating was 24 Jan 2021. Bidding is closed.
This tender has been issued by DUBAI ELECTRICITY & WATER AUTHORITY (DEWA) in UAE.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 49376974. The purchaser document reference is 2412100081.
Browse other tenders from UAE or search by relevant keywords and CPV classification.