Quotation are invited for Supply, Installation, Commissioning and Maintenance of Peristaltic Pumps.
MAKE: MASTERFLEX / COLE-PARMER, USA.# TECHNICAL SPECIFICATION:# MASTERFLEX I/P® DIGITAL DRIVE WITH ETHERNET/IP NETWORK-COMPATIBLE CO MMUNICATION AND OPEN HEAD SENSOR, POWDER-COAT STEEL HOUSING, 0.1 TO 650 RPM, 115/230 VAC# PRODUCT NUMBER = EW-77420-40# PUMP SERIES = I/P# CLOUD CONNECTED = YES# CONTROL TYPE = DIGITAL VARIABLE SPEED# MIN RPM = 0.1 RPM# MAX RPM = 650 RPM# SPEED = VARIABLE, SPEED C ONTROL = ±0.1%# MAX FLOW RATE = 26000 ML/MIN# MIN FLOW RATE = 0.6 ML/MIN# REVERSIBLE MOTOR = YES# DIGITAL DISPENSING = YES# NO. OF P UMP HEADS ACCEPTED = 2# MOTOR = 280 WATTS# DRIVE IP RATING = IP 66# WASHDOWN CAPABLE = YES# DRIVE LENGTH = 424 MM, DRIVE WIDTH = 282 MM, DRIVE HEIGHT = 328 MM# OPEN-HEAD SENSOR = YES# HOUSING MATERIAL = POWDER-COAT STEEL# MOTOR HP = 3/8# REMOTE I/O = 0 TO 20 MA, 4 TO 20 MA, 0 TO 10 V, START/STOP, DIRECTION AND PRIME VIA CONTACT CLOSURE DESCRIPTION = DIGITAL PROCESS DRIVE, POWDER-COAT STEEL, W ITH OPEN-HEAD SENSOR; 650 RPM DELIVERY SHALL BE AS SPECIFIED IN THE ORDER HOWEVER, SHALL BE ON OR AFTER JANUARY 2021. DELIVERY DAT E ACKNOWLEDGMENT SHALL BE PROVIDED BY THE VENDOR THROUGH WRITING UPON RECEIPT OF THE PURCHASE ORDER. DOCUMENTATION AND STANDARD OPER ATING PROCEDURE TO BE INCLUDED. SERVICE CONTRACT/MAINTENANCE FOR MINIMUM OF 1 YEAR (PREVENTIVE & BREAKDOWN MAINTENANCE SHOULD BE SCH EDULE BY THE SUPPLIER TO ENSURE HEALTHY OPERATION OF THE EQUIPMENT AND SUPPLY ANY NECESSARY SPARE PART WITHOUT ADDITIONAL COST FOR D EWA) TO BE INCLUDED. #DEWA R&D LABORATORY CONTRACTORS/SUPPLIERS REQUIREMENTS CHECKLIST# TO BE FILLED AND PROVIDED. THE CONTRACTOR/SU PPLIER MUST COMPLY WITH MINIMUM BUT NOT LIMITED TO ALL REQUIREMENTS INCLUDED UNDER THE DOCUMENT (DEWA R&D LABORATORY CONTRACTORS/SUP PLIERS REQUIREMENTS CHECKLIST) FOR EACH EQUIPMENT IN THE OFFER. THE DOCUMENT (DEWA R&D LABORATORY CONTRACTORS/SUPPLIERS REQUIREMENTS CHECKLIST) DOCUMENT SHALL BE A BINDING PART OF THE CONTRACT WITH THE CONTRACTOR/SUPPLIER. THE USER MANUALS, MAINTENANCE PROCEDURES, OPERATING PROCEDURES (NORMAL AND EMERGENCY OPERATING PROCEDURES IF APPLICABLE), TRAINING MATERIAL, DATASHEETS, CERTIFICATES OR ANY OTHER DOCUMENT RELATED TO THE EQUIPMENT SHOULD BE PROVIDED DURING THE COMMISSIONING IN HARD AND SOFT COPIES. DELIVERY TO DEWA R&D CE NTRE TO BE INCLUDED. FREIGHT AND CUSTOM DUTY TO BE INCLUDED. INSTALLATION, CALIBRATIONS AND COMMISSIONING TO BE INCLUDED. WARRANTY ( MINIMUM OF 1 YEAR) TO BE INCLUDED. SUBMISSION OF TECHNICAL PROPOSAL IS MANDATORY. IN THE CASE OF ALTERNATIVE TECHNICAL SPECIFICATION IS PROPOSED, THE ALTERNATIVE TECHNICAL SPECIFICATION SHOULD HAVE MUCH BETTER QUALITY THAN THE SPECS LISTED ABOVE.#NOTE: FOR ANY FUR THER CLARIFICATION PLEASE CONTACT:AISHAH BASHIR MUHAMMAD
[email protected] qty: 2
masterflex leak detector sensor# manufacturer= masterflex / cole-parmer# product number = ew-77097-10 qty: 2
masterflex i/p® precision pump tubing, c-flex® ultra, i/p 82; 25 ft# ew-06434-82 qty: 1
supply, installation, commissioning and maintenance of peristaltic pumps (turnkey)
standard terms & conditions
1) prices should be `ddp` delivery duty paid at dewa stores.
2) quotation to be submitted only in local currency u.a.e dirhams
3) dewa standard payment terms is `30 days credit` from the date of acceptance of material
4) no dewa staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in dewa tenders / rfqs should not constitute a conflict or perceived conflict of interest.