MINISTRY OF FINANCE has floated a tender for Substations, Overhead Lines, Cables and Network Control Centre in Paramaribo and Nickerie. The project location is Suriname and the tender is closing on 16 Jul 2019. The tender notice number is , while the TOT Ref Number is 34392454. Bidders can have further information about the Tender and can request the complete Tender document by Registering on the site.

Expired Tender

Procurement Summary

Country : Suriname

Summary : Substations, Overhead Lines, Cables and Network Control Centre in Paramaribo and Nickerie

Deadline : 16 Jul 2019

Other Information

Notice Type : Tender

TOT Ref.No.: 34392454

Document Ref. No. :

Competition : ICB

Financier : Other Funding Agencies

Purchaser Ownership : -

Tender Value : Refer Document

Purchaser's Detail

Purchaser : MINISTRY OF FINANCE
Attn: MR. JERRY ASEJA- Project Coordinator CDB Project N.V. Energie Bedrijven Suriname (EBS) Noorderkerkstraat 2-14 Paramaribo
Suriname
Email :jerry.aseja@ebs.sr

Tender Details

Tenders are invited for Substations, Overhead Lines, Cables and Network Control Centre in Paramaribo and Nickerie

PROJECT NAME

Power Projects Suriname - Electricity System Upgrade and Expansion Project


OVERVIEW

The Government of Suriname (GOS) has received financing from the Caribbean Development Bank (CDB) for the POWER PROJECTS SURINAME (the Project) and intends to apply a portion of the proceeds of this financing to eligible payments under this contract. Payment by CDB will be made only at the request of GOS and upon approval by CDB, and will be subject, in all respects, to the terms and conditions of the Financing Agreement. The Financing Agreement prohibits withdrawal from the financing account for the purpose of any payment to persons or entities, or for any import of goods, if such payment or import, to the knowledge of CDB, is prohibited by a decision of the United Nations Security Council taken under Chapter VII of the Charter of the United Nations. No party other than GOS shall derive any rights from the Financing Agreement or have any claim to the proceeds of the Financing.

The Project is being implemented by the Ministry of Finance through its NV Energiebedrijven Suriname (EBS) which is the Executing Agency. NV EBS has contracted FICHTNER to be the Consultant for this project. The Consultants has prepared design and contract documentation (FIDIC Silver Book) and will assist in tender administration, evaluation and supervise Project activities.

NV EBS now invites sealed bids from eligible and qualified bidders for Substations, Overhead Lines, Cables and Network Control Centre in Paramaribo and Nickerie. The works include, but are not limited to the following:

Paramaribo Substations consisting of:

· New 110/12.3 kV Substation Leiding, equipped with seven (7) 110 kV bays, one (1) 110/12.3 kV-25/31.25 MVA power transformer and eight (8) 12.3 kV bays

· New 110/12.3 kV Substation Ringweg, equipped with eight (8) 110 kV bays, two (2) 110/12.3 kV-25/31.25 MVA power transformers and thirteen (13) 12.3 kV bays

· New 33/6.15 kV Substation AZ, equipped with seven (7) 33 kV bays, two (2) 33/6.15 kV-25/31.25 MVA power transformer and thirteen (13) 6.15 kV bays

· New 110/33 kV Substation D2 (extension of existing Substation D) with ten (10) 110 kV bays and two (2) 110/33 kV-75 MVA power transformers

· Extension of existing Substation E with seven (7) 110 kV bays, two (2) 110/33 kV-50/62.5 MVA power transformers

· Extension of existing Substation J with eight (8) 110 kV bays and two (2) 110/33 kV-50/62.5 MVA power transformers

· All substation works include the necessary civil and erection works.

Nickerie Substations consisting of:

· New 33/12.3 kV Substation Clara, equipped with seven (7) 33 kV bays, three (3) 33/12.3 kV-25/31.25 MVA power transformers and seven (7) 12.3 kV bays

· New 33/12.3 kV Substation van Petten Polder, equipped with seven (7) 33 kV bays, one (1) 33/12.3 kV-20/25 MVA power transformer and seven (7) 12.3 kV bays.

Paramaribo Overhead Lines and Cables consisting of:

· 110 kV XLPE power cables with 3x2x800 mm² conductor with an approximate route length of five (5) km (J-RW)

· 110 kV double circuit OHL with an approximate route length of eight (8) km (D2-Leiding)

· 110 kV double circuit OHL with an approximate route length of six (6) km (Leiding-E)

· 110 kV double circuit OHL with an approximate route length of twelve (12) km (E-T-off)

· 33 kV XLPE power cables two (2) circuits each with 3x2x630 mm² copper conductor with an approximate route length of seven hundred meter (700 m) (D-D2)

· All OHL and cable works include the necessary civil and erection works.

Nickerie Overhead Lines consisting of:

· 33 kV double circuit OHL with an approximate route length of fifteen (15) km.

Network Control Center (NCC) for Nickerie

ELIGIBLITY

Consideration will be limited to firms or joint ventures of firms, which are legally incorporated or otherwise organised in, and have their principal place of business in an eligible country and are either:

(a) more than 50% beneficially owned by a citizen or citizens and/or a bona fide resident or residents of an eligible country, or by a body corporate or bodies corporate meeting these requirements; or

(b) owned or controlled by the Government of an eligible country provided that it is legally and financially autonomous and operated under the commercial law of an eligible country and otherwise meets the eligibility requirements of the CDB Guidelines for Procurement (2006).

Eligible countries are member countries of CDB.[1]

Eligible bidders will be required to submit full qualification information with their bids establishing their eligibility to bid and qualification to perform the contract if the bid is accepted. Tender and qualification information are to be submitted in the English Language on the prescribed forms inserted in the Bid Documents. Submissions that do not provide the information required, or do not demonstrate the prospective contractor-s ability to perform satisfactorily, will not qualify and will not be considered for further evaluation.

Qualification requirements include, inter alia:

(a) an average annual turnover (defined as certified payments received for works in progress or completed) within the last three (3) years of at least twenty-seven million United States dollars (USD 27 mn);

(b) a demonstrable cash flow (including access to credit) of four million five hundred thousand United States dollars (USD 4, 500, 000); and

(c) experience as prime contractor in the construction of at least two (2) assignments of a nature, scope and complexity comparable to the proposed project activity within the last seven (7) years with a value of at least twenty-five million United States dollars (USD 25, 000, 000)
(to comply with this requirement, works quoted shall be successfully and at least 80% completed).



All bids must be accompanied by a Bid Security of three hundred thousand United States dollars (USD 300, 000).

ADDRESS FOR BID SUBMISSION AND BID OPENING

MR. JERRY ASEJA

Project Coordinator CDB Project

N.V. Energie Bedrijven Suriname (EBS)
Noorderkerkstraat 2-14
Paramaribo
SURINAME

cdb.projects@ebs.sr

ADDRESS FOR CLARIFICATIONS

MR. EROL PAMIR

FICHTNER GmbH & Co. KG
Sarweystrasse 3
70191 Stuttgart
GERMANY

erol.pamir@fichtner.de

Documents

 Tender Notice