ADMINISTRATOR OF THE GREEK ELECTRIC ENERGY DISTRIBUTION NETWORK S.A. has floated a tender for "Study, Supply of Equipment and Turnkey Construction of the New Closed Gis Chania Ii Distribution Center and Mt Connection Building. The project location is Greece and the tender is closing on 02 Apr 2024. The tender notice number is 104278-2024, while the TOT Ref Number is 97231137. Bidders can have further information about the Tender and can request the complete Tender document by Registering on the site.

Expired Tender

Procurement Summary

Country : Greece

Summary : "Study, Supply of Equipment and Turnkey Construction of the New Closed Gis Chania Ii Distribution Center and Mt Connection Building

Deadline : 02 Apr 2024

Other Information

Notice Type : Tender

TOT Ref.No.: 97231137

Document Ref. No. : 104278-2024

Competition : ICB

Financier : Self Financed

Purchaser Ownership : Public

Tender Value : EUR 17750000

Purchaser's Detail

Purchaser : ADMINISTRATOR OF THE GREEK ELECTRIC ENERGY DISTRIBUTION NETWORK S.A.
Address: 20 PERRAIVOU
Greece
Email :s.maraka@deddie.gr
URL :https://deddie.gr/

Tender Details

The project will be carried out on the island of Crete, in the prefecture of Chania (NUTS: EL 434), Souda area, on an area of ​​3, 250 sq.m. which has been secured for this purpose within the Northern Sector of Nausthamos of Crete, as shown in Plan "S01-Topographical Diagram" of the "Plans" Issue, and concerns planning, study and construction of the entire K/D, "turnkey project" (CPV: 45232221, DA17-2, 45213250, 45315400, 45315500, 31174000). The term turnkey construction (Turn key project) includes the design, the preparation of all supporting studies and application studies, the supply of the materials, the installation of the equipment, the complete construction, the execution of all the prescribed tests, the readiness for commissioning of the Chania II Water Plant by the Contractor, in accordance with the specifications in the technical and commercial issues of the Tender.

"Study, Procurement Equipment and Construction withthe turnkey distribution center of the new Closed GIS Chania II Distribution Center and MT Connection Building"

The basic elements of the distribution center's equipment are as follows: • The main electrical equipment on the 150 kV side will consist of from internal type 150 kV switchboards, insulated with SF6 gas under pi(GIS), double busbars 2000 A, and will include two (2) line fields, three (3) M/S Power fields, one (1) busbar coupling field and one (1) measurement field. • Three M/S (3) Power 40/50 MVA and the corresponding MV equipment. which will consist of metalclad panels with air insulation...
Document Type: Contract Notice
Reference Number: DEED-47
Contract Type: works
Estimated Value: 17750000 - EUR
Doc Title: "Study, Supply of Equipment and Turnkey Construction" of the new Distribution Center (K/D ) Closed Type GIS Chania II and MT Link Building"
Dispatch Date: 2024-02-19
Publish Date: 2024-02-20
Submission Date: 2024-04-02