Expired Tender Spain ICB TOT Ref. 2786172

Slip road construction work Tender in Spain - 2786172

Tender notice from Spain, published on 16 Apr 2015.

Executive Summary

The Bizkaiko Foru Aldundia -" Diputacion Foral de Bizkaia -" Departamento de Obras Publicas y Transportes has issued a Tender notice for the procurement of a Slip road construction work in the Spain. This Tender notice was published on 16 Apr 2015 and is scheduled to close on 25 May 2015, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 2786172, while the tender notice number is 130073-2015 and Register on the platform.

Key facts

Summary
Slip road construction work
TOT Ref. No.
2786172
Document Ref. No.
130073-2015
Country
Spain
Notice type
Tender
Competition
ICB
Publication date
16 Apr 2015
Bid deadline
25 May 2015
EMD
Refer Document
Tender value
Refer Document
Purchaser ownership
-
Financier
Self Financed

CPV classification

Purchaser details

Purchaser contact is for registered users

Login to see details

Tender details

Object of the contract
The works for the present Project Construction of Conditioning the Connection N-637 and N-633 BI-737. Sense Rontegi: Mungia contemplate conditioning, according to the existing traffic, from junction 17 Txorierri Corridor, N-637, in direction Mungia and airport as well as the necessary adjustments to the BI-631, which is oneand the ramp below, and the output of this to the BI-737 in the same direction, Kukularra: Mungia (KM) .The project, as stated, develops Phase I of the Project Path precedent. Phase II is placed for future execution along with the works of the BI-631 in the Alto de Santo Domingo, however the designs have been set and sometimes are conditioned, therefore, in the following description references are made to Phase II, to show photo definitiva.Fase ISE starts acting in the Txorierri corridor, in your driveway sense Kukularra: Erletxes, with a redefinition of lanes on the ground, adjusted disponible.En road space currently present, the rider approaches the lane 3 andNlace Derio in the direction Erletxes, the third which becomes branch Kukularra: Mungia (KM). On your right lane of the ramp deceleration appears to Kukularra: Bilbao (KB). Thus, the broker goes from 3-4 lanes before binding and 2 of these are converted into outputs, however this configuration is very rigid and unbalanced in relacion to traffic volumes in a moving, indeed, the ADT in recent years is almost equally between those who spend long, to Erletxes and those heading in direction Mungia, especially to the airport or the Technology Park and polygons industrial, some 16 000 veh. / day in both cases. In any case, the design has been giveni?1/2special attention to the morning rush hour, which is the most problematic moment in which all the traffic that comes through the corridor, about 2400 veh. continue to Erletxes and other 2200 veh. Mungia.En take the ramp to the first spare capacity and the second to have only one lane, major queues that eventually affect the level of being producedvice the entire corridor. These queues affect one or two kilometers corridor for vehicles begin to be placed at this distance to ensure the salida.Asi therefore defined in this project, a bifurcation, going through the same road space of 3-2 2 lanes, step 2 and 2 output sense Mungia. At the fork, the middle lanei?1/2the 3 runner is ambivalent step movement for output, that allows the distribution of vehicles in the segment approximation to the link can be balanced, avoiding the queues mencionadas.En another level the movement is Kukularra: Bilbao towards the Alto de Santo Domingo, with about 3700 veh. / day. Even remaining space on the platform therente to adjust said branch to the right, thanks to have delayed the nose of the fork and the space left in remodeling the link above. It is now even more advantage to delay the nose of this branch and separate as much as possible the heart of the bifurcacion.Una have obtained the two exit lanes in direction Mungia, must be adaptedrest of the branch, which is already the N-633 (direction Mungia). To do the actual underpass is replaced with a new one of more anchura.En Alternatives Study the option of maintaining the current matiere will appreciate, lowering the grade until his laying of foundations to exhaust all possibilities of horizontal and vertical outline marker, but by reason s road safetyand I opt for their replacement. In fact, since it is part of a small radius curve, the next step is provided with a widening on the inside of the turn, 3.90 m, sufficient to ensure visibility stop at a speed of 60 km project /h.De anyway tracing is limited to existing matiere for structural reasons, to allow executionon the new underpass wrapping the existing, without sacrificing service before disposal. To do this a turning radius similar to actual.En elevation if that improved parameters is achieved is maintained. Lifting the ground in accordance concave underpass, a slope of more smooth entry of 7, 5% instead of 9% above is obtained. It is la unique occasion in which the elevation is varied, since the rest of the project relies wide driveways or existentes.A exit the underpass, the current trench should be extended, but the limited space between the piers and abutments link structures of two separate side walls to each branch are defined, one anchored in concrete wall escalones 2.5 meters to the right and one on concrete bracket for the left.The KM branch ends at the confluence of the N-633 with BI-631. The way in which this occurs and the next leg to the exit at the junction with the BI-737 is the main objective of the Study of Alternatives proyecto.Aunque each of the proposals contained in this study repasen on Schedule N 1 Background, suffice here to expose the conditions of your choice, even if it means advancing the design of the Phase II.The shuffled alternatives are based on the complete picture of the project, ie, with Phase I and Phase II. Its aim is the union of two lanes for movement Kuklarra: Mungia, plus 2 lanes from the BI-631 more for the fifth branch Erletxes: Mungia, runner Txorierri.De these 5 was due to reduce the section to the 3 existing lanes on the stretch of the N-633 / BI-631 which runs along the industrial area of the polygon Ugaldeguren, in the San Antolin, before Euskotren vias. The point is that the construction of the third lane on board hace few years I arranging a wall 6 meters in this area, panned road of the polygon. A new extension, although feasible would disproportionately complex. Thus there is a section from which the 3-lane roadway must remain esta.La 2.4 Alternative elected, proposed the creation of the second track down the BI-631 mamanner independent of the actual trunk, ripping traffic Bilbao and Mungia Bilbao: Derio before Txorierri link. The distribution of the IMD between loso 2 lanes is about 65/35 percentage of conjunto.Pasado the link, double lane Kukularra: Mungia is inserted between them, this achieves simplify further braided to the confluencecia, since vehicles from Bilbao will continue in his sea lane regardless of their destination or, if this channel is lost at the confluence, will have to make a single movimiento.Poco later, to reach the exit of Derio and Zamudio ( the BI-737) the distribution of IMD is currently approximately 20, 000 veh. step and 10 000 at exit. But whentip the deal is reversed and is favorable to branch out, which takes 55%, so some deductions also occur, although less than in the Txorierri. But in addition, it is anticipated that, clear the jam in the Txorierri, appears here a lawsuit now hidden by the previous or latent, aggravating the problem of colas.Para fix is disena one bifurcation of 3 lanes to 2 2. The bifurcation has a length less than it would be desirable but it has become possible, fitting into the widening available on the bridge over the BI-737, maintaining a 1.5 meter arcen .This modification also allow the vehicles to choose from Kukularra lane before the confluence and nothave need for subsequent braiding. For this redefinition of the widening of lanes arcen this is exploited in the last extension of the bridge crossing the N-633 on the BI-737.Volviendo the additional lane Bilbao: Derio, although it is left for Phase II, worth explain its design because it affects the posterior section of the confluence. According foresees theplanned route, rail breaks away from the descending road BI-631 before crossing the Txorierri with Strings Kukularra and Erletxes, below, is introduced by the vain 5 viaducts corridor and linked primarily with the branch Erletxes: Mungia.El traffic lanes planned for Bilbao: Derio, both IMD and IHP, is Mayr, so, is the branch which joins the channel from Bilbao. This union is almost finished when his driveway meets the trunk of the N-633 / BI-631 at approximately the same point now, just before the underpass Ugaldeguren vial and the river Asua.Por Away the trunk, the current lane BI-631, in phase II quedaria liited flow Bilbao: Mungia and N-633 anticipate their engagement. To do the layout of the branch KM (N633) deviates slightly left once out of the underpass of the same name, to join the BI-631 before moving together to the left of the battery 1 Viaduct branch Erletxes: Bilbao, existente.De Thus the length of confluence ishe listens to you, before section fixed 3 lanes in San Antolin, is 500 meters and the nose of this confluence, BI-631-N633, and the second rail Bilbao: Derio and branch Erletxes on the trunk distance themselves as much as possible, to wean largely turbulence both at the confluence trafico.Esta requires two actions described inadjacent structures. These changes are designed to be compatible with different approaches of Alternatives Study, both alternative 2.4, chosen, like the 2.1, which would consist of duplication Rail lowering of the BI-631 in parallel with the existing . So do not restrict future options for development of PhaseII if available new data.Therefore one hand, the displacement of the stack n 1 Viaduct Erletxes: Bilbao, passing over the first connections (BI-631, meaning Mungia, with N-633) .Although needed little additional space, it is not possible to obtain the reduction of lanes, or shoulders, or medium displacement, since the adjacent roadway tamWhile suffering narrowness other batteries. Chosen this solution and since it is feasible, the displacement of pile is leaving more space than absolutely necessary on this occasion, to prevent futuras.Por needs Furthermore, it is necessary to expand across the board step on the road of the polygon Ugaldeguren and the river Asua. To optimizeactions, this extension is prepared, as has been said, to welcome with Phase II the lane Bilbao: Derio. Will also validates whether the choice of alternative 2.4 remains if new considerations do opt for some other option Study alternativas.Junto this fitness a platform extension is performed in the 50 metersnteriores and the 350 meters after that structure without leaving publico.Queda land domain to describe in what way the reduction occurs at 3 lanes of the confluence. In the final photo, with Phase II, the two lanes Kukularra are preserved, right lane remains Bilbao: Derio, which has been incorporated Erletxes branch.Mungia BI-631: And the left, a gradual loss of rail Bilbao occurs. It features 500 meters to make the move to the lane Kukularra: Mungia and fading is done with a final widening and cebreado of arcen as in cases of loss of fast lane. This situation is reinforced by signaling horizontal.Asi because in the sess 3 lanes before the exit to the BI-737, would be: the left lane with the flow preferably from Bilbao and Mungia Kukularra bound; the center lane with the flow Kukularra: Derio and possibly part of Kukularra: Mungia; and the right lane with the flow from Bilbao and Erletxes to Derio / Zamudio. The vehicles with direccMungia Erletxes ion would have to move from right wing to center on the stretch of trenzado.A the conclusion of Phase I, however, since all traffic from Bilbao by Santo Domingo arrives in the left lane, this continuity is maintained to Mungia. Kukularra flow keeps the other two lanes, center and right. Thus, the branchof Erletxes will suffer incorporation into the right lane before. The platform space planned for Phase II, allows the acceleration lane is 60 meters further characteristic length of the prescription of the standard (30% more) .The bifurcation of 3-2 2 in the output to the BI 737, moreover, allows the ambivalence of the middle lane and a more comfortable sharingand flexible vehicles according to your needs. Thus, the 2 configurations confluence for Phase I and Phase II are perfectly compatibles.Esta bifurcation is shorter than usual, since it is taking advantage of the widening of arcen in the structure of the BI-737 and Euskotren, and in the anterior region was ruled extensions road that will haveian to be performed by the existing wall overhangs of 6 meters high and along the road of the polygon industrial district second exit lane available for the outside of the loop current branch, while retaining its layout. The extension platform is only 80 meters to the accumulation area roundabout connection in the BI-737, alsoi?1/2two lanes, plus a directional sense Derio.Esta extension requires a slight lateral displacement of the branch Derio: Mungia makes trunk to the previous loop. In the expansion of rockfill wall shelf is used to not invade the access road to the Garbigune of Derio. It affects only execution during construction to bidegorri, which then debe be repuesto.Siguiendo with outbound traffic to the BI-737, once at the roundabout, most of the traffic, which will arrive in 2 lanes, goes to the Parque Tecnologico Zamudio and polygons as well as by continuity conditions, it is necessary to have two exit lanes of the roundabout in this direction and keep them walkwayi?1/2BI-737 to access Rotonda Parque Tecnologico (BI-3784). At that point has been proven that in rush hour traffic is still half the BI-737 and the other half goes to the BI-3784.La endowment of two lanes in direction Zamudio in the section between roundabouts is possible without expanding roadway, cebreados leveraging sections of the old intersection entryindustrial estate. In regard Derio one lane remains, somewhat narrowed the area of accumulation before the roundabout but a direct channel opens onto the ramp to Mungia the N-633. This channel does not reduce much the entrances to the roundabout, but prevents it from interfering vehicles of this flow, as now, at the entrances to the roundabout from the bond of N-633, improving the overall functioning of the misma.En all exposed layout, has prioritized the improvement of the branch Kukularra: Mungia, considering the main black point of the current operation. Improvements have been other places too, but using where possible existing infrastructure and traffic models by checking the validity of this dibreast. There is no doubt that could deepen the scope of the proceedings but that does not diminish the scalability of the overall solution in the future, so if you have tried to ensure is that the materialization of this project does not mortgage the future actions.
Description: Slip road construction work
Authority Type: Regional or local authority
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union, with participation by GPA countries
Award criteria: The most economic tender
CPV code: 45233227
CPV Description: Slip road construction work.  
Internet address (URL): www.bizkaia.eus
Directive: Classical Directive (2004/18/EC)

Documents

Tender Notice
Login to view

Similar tenders

Spain Public Procurement Intelligence

Frequently asked questions

The bid deadline for Slip road construction work was 25 May 2015. Bidding is closed.

This tender has been issued by Bizkaiko Foru Aldundia -" Diputacion Foral de Bizkaia -" Departamento de Obras Publicas y Transportes in Spain.

The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.

This tender is Self Financed

The tender is classified under the following CPV code(s): 45233227 - Slip road construction work.

The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.

The TendersOnTime reference is 2786172. The purchaser document reference is 130073-2015.

See the Similar Tenders section on this page or browse other tenders from Spain.

This tender falls under Construction and Real Estate in Spain. Suppliers in these sectors can track similar Spain tenders using CPV-based alerts.