Expired Tender Croatia ICB TOT Ref. 10050994

Sewer cleaning services Tender in Croatia - 10050994

Tender notice from Croatia, published on 24 Dec 2016.

Executive Summary

The Grad Zagreb has issued a Tender notice for the procurement of a Sewer cleaning services in the Croatia. This Tender notice was published on 24 Dec 2016 and is scheduled to close on 07 Feb 2017, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 10050994, while the tender notice number is 459817-2016 and Register on the platform.

Key facts

Summary
Sewer cleaning services
TOT Ref. No.
10050994
Document Ref. No.
459817-2016
Country
Croatia
Notice type
Tender
Competition
ICB
Publication date
24 Dec 2016
Bid deadline
07 Feb 2017
EMD
Refer Document
Tender value
Refer Document
Purchaser ownership
-
Financier
Self Financed

CPV classification

Purchaser details

Purchaser contact is for registered users

Login to see details

Tender details

Object of the contract

The subject of procurement is: Cleaning the channel and drain the city Zagreba.Grupa 1: Cleaning of canals and drains the eastern part of Zagreb: cleaning of canals and drains the eastern part of Zagreb includes the area east of the Silver Coin Street, Street V. Heinze Street Duke Branimir, Paromlinska, Street Croatian fraternal Union Avenue V. Holjevca.Grupa 2: Root canal and basinauthority in the western part of the city: clean canals and drains the western part of Zagreb includes the area west of the Silver Coin Street, Street V. Heinze Street Duke Branimir, Paromlinska, Street Croatian Fraternal Union Avenue V. HoljevcaNa the city of Zagreb is currently built around 2 000 km of collector and drainage network. How to make the system functional ini?1/2state, among other things, there is a need for its regular cleaning and održavanjem.Sustav drainage of Zagreb was built primarily as a mixed system, which includes a common drainage of sanitary wastewater and storm water. In mixed systems increased urbanization, has a direct impact on the amount of runoff and stormwater drainage, which is due tosewers. Increased construction: results in increased fixed surface on which there is direct runoff. Increasing the inlet results in congestion, constrained and return during the wastewater collectors, uncontrolled flow-pressure, and leakage of waste water at the surface, uncontrolled pouring, and thus offers a greater intake zagađenja in recipijent.Otežavajuća circumstance which further deepened the problem of drainage in the City of Zagreb is the fact of involvement of the central stream of Medvednica in the system, as well as the rapid expansion and poorly planned urbanization Sljeme areas or speed confluence of large quantities of wastewater that area in the lowland part of the system. This topic jis especially pronounced when an extreme oborina.Sljedeći problem which occurs in maintaining the flow of drainage network is unauthorized opening of manholes and throwing the same various construction and other waste (debris, etc.), which inevitably leads to disturbances in the functioning. Often when such actions cause damage to themselves shafts and columnAlketa to enter the windows, which would require further intervention to ensure the smooth and safe entry into the channels. All the above shows the continuing need for control and implementation of regular cleaning and maintenance systems so that they guarantee the correct and functional odvodnju.Odvodnja roads through precipitation system is connected to the drainage system via watershedska, which in Zagreb has about 54, 000 pieces, whose maintenance and cleansing should be planned, primarily before and after the winter režima.Uz increasing system load mode maintenance has to be of better quality and fast. The canal system of the city of Zagreb are represented by the following cross sections (profiles) channels :: round profiles of O 30 O 180 cm, : oval profilesfrom O to O 30/45 120/180 cm, : capped profiles, : square profili.Način cleaning small profilaMali profiles are round profiles O 30: About 100 cm, egg-O 30/45: A 70/105 cm, are cleaned exclusively hardware. After opening the lid of manholes placed guides for passage nozzle under high pressure breaks through the blockage and pulling the nozzle hidraulwire winch pulls residue in the audit window and the vacuum pump sucks the sludge tank. The sludge is ocjeđuje in the tank through the recycling filter. When the tank is full, the sludge is transported to the already planned mjesto.Način calculation round and egg-shaped profileTroškovnici prepared for zapunjenost than 20% profile (Zn), and the prices that will be offered mustbased on zapunjenosti of 20%. Before the beginning of the work, shall be determined by the actual zapunjenost (Zs) the profile of the channel which is the minutes of zapunjenosti. Based on the relationship between the actual and nominal zapunjenosti zapunjenosti 0.5x (Zs / Zn) obtained coefficient which increases offered unit price. If the ratio of real and nominal zapunjenosti exceed K 2 benefitand the factor K = 2, which means that the same limited maximum 2.Čišćenje large profilaNakon opening covers channels must aerate and examine gas atmosphere. If gas atmosphere allows workers descend into the canal and manually assist in donning sludge according to the audit window. This method is possible only in the dry season and the water level is low asthe order not to endanger the safety of radnika.Način calculation for large profiles (collectors) Bill prepared for the amount of deposits of 30 cm and the prices that were offered to be based on the amount of deposits of 30 cm. If it is established that the amount of deposits greater than 30 cm, then the price is adjusted according to the increase in the height of the sludge collector. Height sediment nominal = 30 cm (Vn) stSafe height of sediment formed shortly before cleaning (Vs). Based on the relationship between the actual height of sludge and sediment nominal height (Vs / Vn) the coefficient which increases offered unit price. If the ratio of real and nominal zapunjenosti exceed K 3 uses the factor K = 3, which means that the same limited maximum 3.Pokretanje procurement process under the framework AgreemuPrilikom initiation of the procurement of a particular area is used estimated average coefficient zapunjenosti and calculated on the basis of the same K, and in the calculation for each street in order to record private or obračun.Provedba CCTV inspection channels (control of the) In accordance with the legal provisions of the system after cleaning must be taken or spend CCTV andnspekciju .: pipelines with free surface (gravity): CCTV inspection which is performed in compliance with standard conditions of drainage systems outside buildings: Part 2: Visual inspection coding system EN 13508-2 / AC, : CCTV inspection shall be controlled by the direction and vertical alignment, pipe joints, damage or deformation, compounds outlets, : after the control CCTV inspekcijom constitutes the final report in accordance with the standard "Terms of drainage systems outside buildings: Part 2: Visual inspection coding system, EN 13508-2 / AC" .Opis cleaning slivnikaNakon raising Drain covers high pressure water washes away the slurry, a vacuum pump sucks the fuel. Also, the nozzle with high-pressure pump cleaned and checked connection withlivnika and kanala.Sav material (sludge) that through the vacuum pump intake in the tank can also be transported and discharged for already provided mjesto.Slivnici cleaned day and night because of traffic conditions in the city of Zagreb. The streets where vehicles are parked across the drain hampered the cleanup because the vehicles raise special vehicle (spider) and upon completion of the cleaning exerciseAcaju. Services "spider" separately stated and are not subject to this, but only depending on the cleaning sections as indicated in the papers troškovniku.Opis bringing in full drain-drain funkcijuKod malfunctioning is usually necessary to repair: replacement of the damaged part of the connecting channel. To replace the digging and removing the damaged pipe connectioni?1/2channel to the required length, and replacing them with new HDPE pipes. Connection pipes are connected seal and set on a concrete base to be set up after regrets "lean" betonom.Sanacija line channel is mainly determined by reference to the same performed at the same place (the compound of the canal or the audit window), and exceptionally and on new point of connection (channel or Revision window), depending on the conditions of the rehabilitation terenu.Osim line channel drain is often necessary to carry out the replacement of damaged: podrobljenog or zabetoniranog cylinder precipitator drains. In this case, papers consist of removing the Drain covers the frame, and replacing one or more pipe profile 50 cm cylinder drains. The new pipes are installed on the cylinderi?1/2concrete base: the bottom of the cylinder, and at the junction of two or more tubes can also be made ensuring concrete. After creating the cylinder again concreting Drain covers mounted to the frame (or the same if necessary new), and the re-perforating hole sump and connected to the connecting channel. The connection port is with sedimentation trap also provides concrete, and the inner compound omazuje cement mortom.Zemljani material extracted for the remediation transported to the distance up to 10 km, and the trench is backfilled replacement stone material with the necessary compaction in slojevima.Nakon which the contractor carrying out reconstruction of drains at a certain location check prijekopa done through Sector Odvodnje.Po the works review: "nUlto cleaning "reconstructed drain is carried out" special vehicle suction "with high crijevom.Vraćanje in original condition asphalt surfaces: rehabilitation of roads is done through a branch of the Zagreb ceste.Grupa 3: Cleaning channels, culverts and drains that are connected to the public sewerage system on the city ZagrebaPredmet procurement ditch cleaning, PropusThis and drains that are connected to the public sewerage system in the city of Zagreb to system rainwater roads smooth functioning. As rain water coming into the channels and omissions from the surface, to carry sand and various small floating waste. Since the channel and failures bring water and numerous streams, it comes through them gravel, soil, leaves and drugo.Problem which occurs in maintaining the flow of drainage network, is due to the fact that some citizens non-preferential open the window and throw them in the rubble and various waste while it remains in the channels and creates a dam flow of water. Drainage of Transportation also is connected to a drainage system through drains. The drains are also deposited cleanliness made washing streetsa.U precipitation system of the city of Zagreb is the channels and culverts round profile About 30 About 100 cm, which are not connected to the public sewerage system in the City of ZagrebaNačin cleaning canals and propustaOkrugli profiles O 30: About 100 cm, pure hardware exclusively. After opening the cover manholes placed guides for passage nozzle under high pressureom penetrates clogged nozzles and pulling hydraulic winch hauls sludge (sludge) in the revision shaft and the vacuum pump sucks the sludge tank. The sludge is ocjeđuje in the tank through the recycling filter. When the tank is filled bidder di?1/2zen perform the same care of their trošku.Način charged cleaning canals and propustaObračun cleaning is done by m1 ochishorderly channels or propusta.Opis cleaning slivnikaNakon removal Drain covers high pressure water dissolved sludge (sludge) and the vacuum pump sucks the sludge tank. Also, the nozzle with high-pressure pump cleaned and checked compound drains and kanala.Sav material through the vacuum pump intake in the tank bidder di?1/2zen make the disposal of the same at its own expensešku.Slivnici cleaned day and night because of traffic conditions in the city of Zagreb. The streets where vehicles are parked across the drain hampered the cleanup because the vehicles raise special vehicle (spider) and upon completion of the cleaning return. Services "spider" provides naručitelj.Način charged cleaning slivnikaObračun cleaning is done by a piece of the cleaned drains in conjunction withlivnika na kanal.
Description: Sewer cleaning services
Authority Type: Regional or local authority

Contact Nature: Services

Procedure: Open procedure

Document: Contract notice

Regulation: European Union

Award criteria: Lowest price

CPV code: 90470000

CPV Description: Sewer cleaning services.  
Internet address (URL):

Directive: Classical Directive (2004/18/EC)

Documents

Tender Notice
Login to view

Similar tenders

Croatia Public Procurement Intelligence

Frequently asked questions

The bid deadline for Sewer cleaning services was 07 Feb 2017. Bidding is closed.

This tender has been issued by Grad Zagreb in Croatia.

The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.

This tender is Self Financed

The tender is classified under the following CPV code(s): 90470000 - Sewer cleaning services.

The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.

The TendersOnTime reference is 10050994. The purchaser document reference is 459817-2016.

See the Similar Tenders section on this page or browse other tenders from Croatia.

This tender falls under Construction and Real Estate in Croatia. Suppliers in these sectors can track similar Croatia tenders using CPV-based alerts.