Tender Documents Provided Below Estimated Quantities: Earth Excavation Including Truck Hauling, 100% Maximum Density Required For Earth Embankments: 16 950 m3Earth Embankment Including Truck Hauling, 100% Maximum Density: 5 100 m3Install Culverts Group V, Ministry Supply: 144 m Random Riprap Type 2: 550 m3Granular Backfill In Place: 2 300 m3Completion Date: Phase I: November 7, 2026 Phase II: June 30, 2027 Deposit with each Tender - 5% of total bid.Deputy Minister of Highways Bidders may request a debriefing session from Ministry of SaskBuilds and Procurement by emailing
[email protected] within 30 days after the award notification date. The intention of the debriefing is to aid the Bidder by identifying areas of improvement that may be applied to subsequent procurement opportunities.
Agreement Type: NWPTA and CFTA and CETA and WTOGPA
Competition tpye: ITT
Public Opening: No
Publishing Date: Aug 11, 2026 9:45 AM CST
Closing Date: Aug 26, 2026 2:00 PM CST
Synopsis Purpose of this Advance Proposed Procurement Notice: This is an advance notice for the procurement of a Contractor to complete a culvert replacement on Highway 49 east of Arran, Saskatchewan. Please note that all quantities and project details are subject to change. This tender will have a shortened advertising period and will have an early completion date. The work is expected to take place as early as August 2026, with a specified completion date as early as October 31, 2026. The Ministry of Highways reserves the right to not proceed with advertising this work. Description of the Procurement: INSTALLATION OF THREE 3 000 mm DIAMETER POLYMER LAMINATED CORRUGATED STEEL PIPE CULVERTS by open excavation of the Roadway on Highway No. 49, 8.5 km west of its junction with Manitoba Highway No. 83; for a TOTAL LENGTH OF 141 m. Any questions regarding the above can be sent to
[email protected] with the subject line: “H26098- Advance Notice”. Tender documents will be added when available.
Additional Information : Tender Documents Provided Below Estimated Quantities: Earth Excavation Including Truck Hauling, 100% Maximum Density Required For Earth Embankments: 16 950 m3Earth Embankment Including Truck Hauling, 100% Maximum Density: 5 100 m3Install Culverts Group V, Ministry Supply: 144 m Random Riprap Type 2: 550 m3Granular Backfill In Place: 2 300 m3Completion Date: Phase I: November 7, 2026 Phase II: June 30, 2027 Deposit with each Tender - 5% of total bid.Deputy Minister of Highways Bidders may request a debriefing session from Ministry of SaskBuilds and Procurement by emailing