PROJECT TITLE AND DESCRIPTION OF WORKRUE POITRAS WATERMAIN EXTENSIONOption A - The work consists of attaching a tee to the existing 200 mm water pipingleaving the St. Malo Water Treatment Plant, and running a new 200 mm pipeapproximately 360 m to the SE. A 150 mm watermain will be run from the new 200 mmpipe SW down Rue Chouinard to service the Arena expansion project.Option B - This is a revised option to only service the Arena depending on cost. Thiswould involve the same work as described above but with the 200 mm pipe terminatingwith a stub and cap after the T at 2+55 and 150 mm line to the Arena.SUBMISSION DEADLINE2.1 The Submission Deadline is 11:00 am Central Standard Time, May 29, 2026 at:R.M. of De Salaberry466 Sabourin St.St. Pierre-Jolys, MBOr via e-mail to:
[email protected] with hard copy to follow within 3 days.2.2 Tender Submissions determined by the Owner to have been received later than theSubmission Deadline will not be accepted and will be returned unopened.2.3 The Contract Administrator or the Owner may extend the Submission Deadline by issuingan addendum at any time prior to the time and date specified in BP:2.1.
Reference Number : 0000322981 Location : Canada, Manitoba, Southeast Job Location : St Malo, MB Description : PROJECT TITLE AND DESCRIPTION OF WORKRUE POITRAS WATERMAIN EXTENSIONOption A - The work consists of attaching a tee to the existing 200 mm water pipingleaving the St. Malo Water Treatment Plant, and running a new 200 mm pipeapproximately 360 m to the SE. A 150 mm watermain will be run from the new 200 mmpipe SW down Rue Chouinard to service the Arena expansion project.Option B – This is a revised option to only service the Arena depending on cost. Thiswould involve the same work as described above but with the 200 mm pipe terminatingwith a stub and cap after the T at 2+55 and 150 mm line to the Arena.SUBMISSION DEADLINE2.1 The Submission Deadline is 11:00 am Central Standard Time, May 29, 2026 at:R.M. of De Salaberry466 Sabourin St.St. Pierre-Jolys, MBOr via e-mail to:
[email protected] with hard copy to follow within 3 days.2.2 Tender Submissions determined by the Owner to have been received later than theSubmission Deadline will not be accepted and will be returned unopened.2.3 The Contract Administrator or the Owner may extend the Submission Deadline by issuingan addendum at any time prior to the time and date specified in BP:2.1.