Replacement of Defective Control Boards Tender in UAE - 51933203
Tender notice from UAE, published on 05 Apr 2021.
Executive Summary
The DUBAI ELECTRICITY & WATER AUTHORITY (DEWA) has issued a Tender notice for the procurement of a Replacement of Defective Control Boards for Carrier Water Cooled Chillers in the UAE. This Tender notice was published on 05 Apr 2021 and is scheduled to close on 07 Apr 2021, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 51933203, while the tender notice number is 2332100642 and Register on the platform.
Key facts
Summary
Replacement of Defective Control Boards for Carrier Water Cooled Chillers
Quotation are invited for Replacement of Defective Control Boards for Carrier Water Cooled Chillers. Replacement 1032100813rfx Description. 1 ITEM-00001 INTEGRATED STARTER MODULE FOR CONTROL BO 1 EA
·#CONTRACTOR HAS TO PROVIDE MATERIAL SUBMITTAL, METHOD STATEMENT, AND SCHEDULE
OF WORK TO THE ENG
INEER FOR APPROVAL BEFORE CARRYING OUT
THE INSTALLATION. ·#IN CASE OF
UN-SATISFACTORY PERFORMANCE, THE LPO WILL
BE CANCELLED GIVING
15 DAYS# NOTICE ·#COVID-19 PRECAUTION
MEASURES TO BE FOLLOWED AS PER DEWA
HEALTH & SAFETY DEPARTMENT
RECOMMENDATION UNTIL FURTHER NO
TICE. ·#CONTACT PERSON FOR SITE VISIT MR.
MOHAMED OBEID: 052 6973337, 04 3227879 AND MR.
MOHIDEEN: 055 3810513, 04 3227879. CHILLER
DETAILS: ·#CARRIER CHILLERS, MODEL #
19XR5757367KGH52 B. GENERAL CONDITION &
MOBILIZATION AT SITE OF THE CONTRACT: - ·#THE
CONTRACTO
R IS REQUIRED TO QUOTE LUMP SUM PRICE FOR
THE ABOVE MENTIONED SCOPE OF WORKS ·#THE
QUOTATION WILL BE SUBMITTED AS PER DEWA
SPECIFICA
TION AND SURVEY ONLY. ·#SPARE PARTS
REQUIRED TO CARRY OUT THE RECTIFICATION ACTIVITY SHOULD BE ARRANGED AT THE
EARLIEST IN ORDER TO
KEEP THE EQUIPMENT DOWN TIME TO MINIMUM
AND MUST BE GENUINE SPARES FROM OEM OR
OEM RECOMMENDED VENDORS. ·#ALL THE
MATERIALS IN GENER
AL WILL CONFORM AS PER LATEST STANDARDS
AND SHALL BE SUBMITTED TO DEWA FOR
ENGINEERS APPROVAL. ·#THE CONTRACTOR IS
REQUIRED TO TAKE
ALL PRECAUTION. SO AS NOT, DAMAGE ANY OF
THE EXISTING EQUIPMENT/ STRUCTURE ETE#
·#THE CONTRACTOR SHALL DEPLOY THE SKILLED
TECHNICIAN
S FOR CARRYING OUT THE WORKS. ·#SHOULD WE
EXPERIENCE A BREAKDOWN IN ANY OF
EQUIPMENT/SYSTEM AT ANY TIME OF THE DAY OR
NIGHT, YOU WIL
L RESPOND TO OUR REQUEST WITH YOUR 24
HOURS EMERGENCY CALL OUT SYSTEM
AVAILABLE 7 DAYS A WEEK. RESPONDING TIME TO
BREAKDOWN CALLS IS
WITHIN 1 HOUR AFTER RECEIPT OF NOTIFICATION #ALL ACTIVITIES SHALL BE PERFORMED IN
PRESENCE/ SUPERVISION OF COMPETENT
SUPERVISOR.
·#CONTRACTOR SHALL OBTAIN ALL NECESSARY
APPROVALS/ CLEARANCE FROM CONCERNED
DEWA ENGINEER/SUPERVISOR BEFORE
COMMENCING ANY MAINTENAN
CE ACTIVITIES. ·#SUPERVISOR SHALL BE
RESPONSIBLE FOR THE SAFETY OF MEN/
EQUIPMENT DURING THE ACTIVITIES AND ALSO
MUST ENSURE THAT WO
RK EXECUTED IS OF HIGHEST STANDARD.
·#CONTRACTOR SHALL TAKE CARE OF ALL
RELATED FORMALITIES LIKE MOBILIZATION OF
STAFF, ENSURING TOO
LS & TEST EQUIPMENT#S ARE AVAILABLE AT SITE
FOR CARRYING OUT THE CORRECTIVE
MAINTENANCE ACTIVITIES. ·#TRANSPORTATION OF
STAFF FROM T
O SITE SHALL BE ARRANGED BY THE
CONTRACTOR. ·#DEWA WILL NOT ACCEPT ANY
CLAIM FOR EXTRAS BEYOND THE ORDER PRICE
DURING AND AFTER THE EXECUTION OF WORK, UNLESS CLAIM WITH
PROPER JUSTIFICATION IS APPROVED BY DEWA
MANAGEMENT. ·#CONTRACTOR SHALL BE
RESPONSIBLE FOR ANY
DISCREPANCIES OR DAMAGES OF THE EXISTING
SYSTEM DURING EXECUTION OF THE WORK.
·#CONTRACTOR MUST EXECUTE ALL RELATED
WORKS REQUIRED,
FOR THE SAFE EXECUTION OF MAINTENANCE
ACTIVITY, EVEN THOUGH NOT MENTIONED
EXPLICITLY IN THE ORDER. ·#COVID-19
PRECAUTION MEASURES TO
BE FOLLOWED AS PER DEWA HEALTH & SAFETY
DEPARTMENT RECOMMENDATION UNTIL FURTHER
NOTICE. ·#CONTRACTOR STAFF IS REQUIRED TO
WEAR PROP
ER PERSONAL PROTECTIVE EQUIPMENT AT ALL
TIME ON THE SITE. C. SAFTEY PRECAUTION & SITE
CLEANLINESS: - ·#AREA OF WORK SHALL BE KEPT
C
LEAN & CLEAR AT ALL TIMES DURING AND AFTER
THE WORK. IF ANY WASTE GENERATED, THEN IT
SHOULD BE CLEANED AND DISPOSED IMMEDIATELY. ·#C
ONTRACTOR MUST ENSURE THAT ALL STAFF
INSIDE DEWA PREMISES SHALL FOLLOW DEWA#S
SAFETY & ENVIRONMENT RULES AND
REGULATIONS. ·#WELDING,
FLAME HEATING OR CUTTING, GRINDING,
PNEUMATIC CHIPPING ETC. SHALL BE CARRIED
OUT WITHOUT SPECIFIC CLEARANCE FROM DEWA.
ALL SUCH ACT
IVITIES WILL BE CARRIED OUT THROUGH #HOT
WORK PERMITS#. HOT WORK PERMIT IF
REQUIRED, SHALL BE OBTAINED ON DAILY BASIS.
·#CONTRACTOR
SHALL AT NO TIME KEEP INFLAMMABLE
SUBSTANCES IN THE PLANT/WORK AREAS. BUT
IN-CASE SUCH ITEMS ARE REQUIRED FOR THE
ACTIVITY, THEN ALL
REQUIRED PERMISSION MUST BE OBTAINED
FROM CONCERNED AUTHORITIES. ·#WORKMEN
SHALL WEAR ALL NECESSARY PPES LIKE
UNIFORM, SAFETY SHOES
AND HELMET AT WORK SITE. ·#ALL ADJOINING
PLANT INSTALLATION, INSTRUMENTS, ELECTRIC CABLES AND CUBICLES SHALL BE ADEQUATELY
PROTECTE
D DURING EXECUTION OF ANY MAINTENANCE
ACTIVITIES. ·#RIGGING TOOLS & TACKLES WITH
VALID TEST/ INSPECTION CERTIFICATES FROM 3RD
PARTY
SHALL ONLY BE USED BY THE CONTRACTOR. D.
TERMS OF PAYMENT: -# ·#PAYMENT WILL BE MADE
AFTER COMPLETION OF THE WORK. ·#INVOICE
SHALL B
E ADDRESSED TO OUR FINANCE DEPARTMENT
ALONG WITH COMPLETION OF REPORTS. E.
WARRANTY: - ·#WARRANTY OF 01 (ONE) YEAR
AGAINST THE SUPPL
IED MATERIAL & WORKMAN SHIP IS TO BE
PROVIDED. ·#THE WARRANTY WILL TAKE EFFECT
FROM THE DATE OF TAKEOVER BY DEWA ON THE
JOB CARRIED
OUT BY THE CONTRACTOR. F. PENALTY CLAUSE: -
·#IN CASE CONTRACTOR, DUE TO HIS FAULT FAILS
TO COMPLETE THE JOB IN TIME AS PER GIVEN A
ND AGREED SCHEDULE, THEN CONTRACTOR IS
LIABLE TO PAY 1.25% OF THE JOB VALUE AS PENALTY FOR EVERY WEEK OF DELAY WITH A
MAXIMUM CEILIN
G OF 10%. ·#IN CASE CONTRACTOR FAILS TO KEEP
THE ACTIVITY SCHEDULE IN PROGRESS, THEN
DEWA WILL TAKE OVER THE WORK AND EXECUTE
IT THE
WAY THAT MAY FEEL RIGHT TO MEET THE TIME
SCHEDULE. THE EXPENDITURE INCURRED WILL BE
BACK CHARGED TO THE CONTRACTOR. G.
DOCUMENTS: -
ON SATISFACTORY COMPLETION OF EACH
ACTIVITIES, A DETAILED FACT-FINDING REPORT (IN
ENGLISH) SHALL BE SUBMITTED WHICH WILL
COVER ROO
T CAUSE ANALYSIS, OBSERVATIONS,
RECOMMENDATIONS AND CONFIRMATION OF
EQUIPMENT FITNESS BASED ON THE TEST
RESULTS STANDARD TERMS & CONDITIONS
1) Prices should be `DDP` delivery duty paid at DEWA stores.
2) Quotation to be submitted only in local currency U.A.E Dirhams
3) DEWA Standard payment terms is `30 days credit` from the date of acceptance of material
4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest.
The bid deadline for Replacement of Defective Control Boards for Carrier Water Cooled Chillers was 07 Apr 2021. Bidding is closed.
This tender has been issued by DUBAI ELECTRICITY & WATER AUTHORITY (DEWA) in UAE.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 51933203. The purchaser document reference is 2332100642.
Browse other tenders from UAE or search by relevant keywords and CPV classification.