Contract number: w91qvn-12-d-0077/78
project number: smyu 16-1044
description: repair roofs, multi-fac b355, b1358
ra poc: 51st ces (choe, hang sok 784-5706)
statement of work
dated: 10 sep 15
1. General: the work to be performed for completion of this project shall be in general as described below and executed by the contractor.
1.1 work by contractor: the contractor shall provide all labor, tools, equipment, supplies and any other resources necessary to accomplish the scope of work contained herein as listed below and in accordance with the drawings, sketches and specifications.
1.2 work by in-house forces: n/a
1.3 work by troop labor: n/a
2. Technical specifications: above project shall comply with specifications in awarded original contract package.
3. Scope of works (sow):
a. Architectural works:
bldg 355
1. Provide double pipe scaffolding around the buildings for temporary works incl. Fabricating and dismantling.
2. Remove existing asphalt shingle roofing system incl. Insulation, rotten roof sheathing, flashing, fascia, soffit boards.
3. Remove existing rain gutters and downspouts.
4. Install new protected metal sheet roof system incl. Protected metal sheet, roof sheathing, wooden purlins (@4 -0" o.c.) with thermal spacer blocks, batt insulations with vapor barriers, metal flashings, metal fascia/soffit panels, and drip edges.
5. Install new rain gutters and downspouts incl. Concrete splash blocks.
6. Remove all construction debris originated from this project and clean up the job site.
7. Repair all damages to existing areas caused by this project and to match condition to adjacent areas.
Bldg 1358
1. Provide double pipe scaffolding around the building for temporary works incl. Fabricating and dismantling
2. Remove existing entire metal roof system such as roof panels, insulation, flashings, drip edges, rain gutters and downspouts.
3. Install roof sheathing, wooden purlins with thermal spacer blocks and additional metal frames (if necessary) such as rafters/purlins using welding to attach on the existing roof structures.
4. Install new protected metal roof panels, roof liner (if necessary), purlins and batt insulations on the roof frame.
5. Install new flashings, drip edges, fascia, soffit, rain gutters and 9 sets of downspout with splash blocks.
6. Remove all construction debris originated from this project and clean up the job site.
7. Repair all damages to existing areas caused by this project and to match condition to adjacent areas.
4. Attached drawing or sketch or pictures: yes
5. Contract performance period: 120 calendar days aro
6. Others: n/a
7. Attached clin items incl. Cost (igce): yes
8. Remarks: this is the rok lcs funded project. So, all of the construction materials used in this project shall be local ones complying with specification in awarded original contract package since rok lcs funds shall not to be used to purchase off-shore end products.
Please consult the list of document viewers if you cannot open a file.
Solicitation- w90vn6-16-r-0004
type: other (draft rfps/rfis, responses to questions, etc..) label:
solicitation- w90vn6-16-r-0004
posted date: march 8, 2016 new_roof_top_repair_solicitation.docx (80.32 kb)
description: solicitation
411th contracting support bde, korea
rco osan, unit #2039
apo, ap 96278
osan ab, non-u.s. 96278
korea, south
primary point of contact.:
daymeion g. Brantley,
contract specialist
[email protected]phone: 7845893 all files
solicitation- w90vn6-16-r-0004
mar 08, 2016
new_roof_top_repair_...download/view new_roof_top_repair_solicitation.docxgeneral information
38 -- construction, mining, excavating & highway maintenance equipment
naics code:
238 -- specialty trade contractors/238160 -- roofing contractors
238 -- specialty trade contractors/238160 -- roofing contractors
for help: federal service deskaccessibility