This modification will add necessary alterations to ongoing construction to the Fire Traininer facility.
1. Demolition & Site Preparation: Demolish and dispose of the existing in-pond non-operational submersible pump; drain the retention pond and clear accumulated algae/debris.
2. Civil Foundation: Construct a new on-land reinforced concrete foundation pad for the relocated external pump system.
3. Mechanical & Engineering: Furnish and install a new external pump system, including signed/sealed Professional Engineer (PE) design drawings and Net Positive Suction Head (NPSH) calculations.
4. Electrical & Controls: Trench and install approximately 50 linear feet of new electrical conduit and wiring, integrating the pump system into the Fire Training Facility and the new CNOT (Control Tower).
The incumbent contractor, Guardian Construction, Inc., is currently mobilized on-site performing comprehensive mechanical, structural, and control construction to the Fire Trainer under Contract FA664825C0007. Awarding this modification on a sole source basis is the only viable method to prevent unacceptable operational delays, substantial duplication of costs, and ensure warranty and integration into existing system.
Contact InformationPrimary Point of ContactFaye RitterEmail
[email protected] Phone Number7864157472Alternative Point of ContactViviane FiliasEmail
[email protected] Phone Number(blank)Contracting Office AddressADMINISTRATIVE ONLY NO REQUISITIONS 29050 CORAL SEA BLVD HOMESTEAD AFB, FL 33039-1299 USA Attachments/LinksLinksNo links have been added to this opportunity.Attachments No attachments have been added to this opportunity. Disclaimer: In case of problem in downloading the attached file, please Click Here.