Expired Tender Sri Lanka ICB TOT Ref. 66973673

Renovation of Roof Tender in Sri Lanka - 66973673

Tender notice from Sri Lanka, published on 27 May 2022.

Executive Summary

The LANKA ELECTRICITY COMPANY (PRIVATE) LIMITED has issued a Tender notice for the procurement of a Renovation of Roof in the Sri Lanka. This Tender notice was published on 27 May 2022 and is scheduled to close on 17 Jun 2022, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 66973673, while the tender notice number is LECO/22/SHL/WK4/195 and Register on the platform.

Key facts

Summary
Renovation of Roof
TOT Ref. No.
66973673
Document Ref. No.
LECO/22/SHL/WK4/195
Country
Sri Lanka
Notice type
Tender
Competition
ICB
Publication date
27 May 2022
Bid deadline
17 Jun 2022
EMD
Refer Document
Tender value
Refer Document
Purchaser ownership
Public
Financier
Self Financed

Purchaser details

Purchaser contact is for registered users

Login to see details

Tender details

Quotation are invited for Renovation of Roof at Customer Service Center Building Boralesgamuwa
The tenderer is advised to visit the site of the

proposed works, it is his responsibility to ascertain

the conditions governing the access to site, external

working space, storage areas etc. No additional

payments made to above unless other wise stated.

Preliminary items which are not specified below

cost of such items should be included to unit rates

of other items as per CIDA Publications.

specially, remuneration of contractors Site staff

temporary accommodations, sanitary facilities etc,

Water and Electricity required for works shall be

supplied by the LECO Note

Contractor shall not carry out any work in such a manner as to cause any

nuisance to adjacent owners or the public. Contractor is advised to cooperate with the Employer in maintaining an environment as free of

excessive noise and dust pollution as much as possible.

Note

The Contractor shall be responsible for protecting and safeguarding the

works, materials and plants against damage, trespass, etc..,

Note

1A/01 Allow Lump sum for providing Performance Bond. 1 Item

1A/02 Allow sum for Temporary shed for storage materials such as cement, steel

etc. 1 Item

1A/03 Allow for removal of all rubbish and completion of all works 1 Item

Total Carried to Grand Summary
2A/- DEMOLISHING

(a) All tenderers are advised to visit site and make careful study of all

existing conditions and the nature and extent of work to be done under this

contract, as no extras will be allowed on the plea of want of information

due to negligence of on their part in this regard.

Note

(b) All demolished materials, except those required to be stacked shall be

carted away during the demolition operation. Contractor shall be removed

damaged timber members only and contractor shall get an approval from

employer's authorized person before removal of damaged timber members.

Note

OWNERSHIP OF RECOVERED MATERIAL

(a) Usable materials arising from demolitions shall be the property of the

employer and shall be stacked within site as directed.

Note

(b) The Contractor shall carefully remove and stack within site all such

materials and goods and shall ensure the safety of such items, it is the

responsibility of the Contractor to hand over such items to an authorised

representative of the employer.

Note

2A/01 Carefully removing existing ridge covering. Rate to include for stacking on

site as per the Engineer-s instruction in purpose of hand over to employer

and clearing debris away from the site. 77 m

2A/0

2

Carefully removing existing tile roof covering. Rate to include for stacking

on site as per the Engineer-s instruction in purpose of hand over to employer

and clearing debris away from the site.

350 m

2

2A/0

3

Carefully removing existing gutters and down pipe. Rate to include for

stacking on site as per the Engineer-s instruction in purpose of hand over to

employer and clearing debris away from the site.(if required)

155 m

2A/0

4

Carefully removing existing valance board. Rate to include for stacking on

site as per the Engineer-s instruction in purpose of hand over to employer

and clearing debris away from the site.(if required)

2A/0

5

Carefully removing of damages ridge plate from existing timber roof frame

work as per the Engineers instruction. Rate to include stacking on site and

clearing debris away from the site.

1 m Rate Only

2A/0

6

Carefully removing of damages wall plate from existing timber roof frame

work as per the Engineers instruction. Rate to include stacking on site and

clearing debris away from the site.

1 m Rate Only

2A/0

7

Carefully removing of damages purlin from existing timber roof frame work

as per the Engineers instruction. Rate to include stacking on site and

clearing debris away from the site.

1 m Rate Only

2A/0

8

Carefully removing of damages rafters from existing timber roof frame

work as per the Engineers instruction. Rate to include stacking on site and

clearing debris away from the site.

1 m Rate Only

2A/0

9

Carefully removing of damages reepers from existing timber roof frame

work as per the Engineers instruction. Rate to include stacking on site and

clearing debris away from the site.

1 m Rate Only

2A/10 Carefully removing of damages hip rafters from existing timber roof frame

work as per the Engineers instruction. Rate to include stacking on site and

clearing debris away from the site.

1 m Rate Only

2A/11 Carefully removing of damages valley rafters from existing timber roof

frame work as per the Engineers instruction. Rate to include stacking on

site and clearing debris away from the site.

1 m Rate Only

2A/18 Carefully removing of existing Zn/Al roof covering as per the Engineer-s

instructions. Rate to include for clearing debris away from site.

50 m

2

Total Carried to Summary

2B/- ROOF COVERING AND ROOF PLUMBING

The Bidder is requested to refer the General Notes, Pricing Preambles,

Drawings, Specifications, Conditions of Contract and other relevant

documents of local statutory requirements prior to pricing of the following

items. Note

Bill No. 01 Renovation of Roof at CSC Building Boralesgamuwa 3

Item

No

Description of Work Qty Unit Rate Amount

The Contractor shall get conformation from the Engineer prior laying of

roof covering. Note

Roof Covering

2B/01 Supplying and fixing Zinc Aluminium colour bonded steel roofing sheets

(0.47 gauge) on existing frame work using nut & bolt or self tapping screws.

400 m

2

2B/02 Supplying and fixing Zinc Aluminium colour bonded standard steel ridge cap

to existing sheet roof using new self tapping screws.

77 m

2B/03 225mm x20mm Kempus, Valance boards fixed with " L " iron Brackets

to purlins, treating with one coat of primer and two coats of enamel paint.

(if required) 110 m

Roof Plumbing

2B/04 Supplying and fixing of 0.47mm thick (minimum thickness) zincalume

approved colour bonded straight gutter of 450mm (type "A" METROOF or

equivalent approved) fix to valance board (measured separately) with

necessary gutter brackets at 1000mm C/C with an including necessary

extras as per detail drawing.(if required) 110 m

2B/05 Supplying and fixing of 0.47 mm thk. (minimum thickness) zincalume hitensile straight, 150x100mm square type approved colour bonded rain water

down pipe, fix to columns with standard down pipe clips at 1000mm C/C

with an including necessary extras as per detail drawing.(if required)

85 m

2B/06 Supplying and fixing of 0.47mm thick (minimum thickness) 457mm width

Hitensile (Grade-550) Colour Zinc Aluminium sheet valley gutter, fixing to

roof with self trapping screws. Rate shall include for 25mm thick class I

timber boarding. (if required)

1 m Rate Only

Timber Members for Roof Structure

All Timber members shall be well seasoned, treated, approved and all

exposed surfaces well planned in imported Balaw or equivalent hard wood

timber. Note

Rate shall include for application of two coat wood preservative for all

surfaces by paint sprayer. Note

New Timber Members

2B/07 Repairing of roof structure with 50mm x 150mm (2”x6”) ridge plate instead

of removed damaged timber ridge plate. 1 m Rate Only

Bill No. 01 Renovation of Roof at CSC Building Boralesgamuwa 4

Item

No

Description of Work Qty Unit Rate Amount

2B/08 Repairing of roof structure with 75mm x 100mm (3”x4”) wall plate/ struts

instead of removed damaged timber wall plate/ struts.

1 m Rate Only

2B/09 Repairing of roof structure with 50mm x 150mm (2”x6”) valley/ hip rafter

instead of removed damaged timber valley/ hip rafter.

1 m Rate Only

2B/10 Repairing of roof structure with 125mm x 50mm (5”x2”) or 125mm x 75mm

(5"x3") purling instead of removed damaged timber purling.

1 m Rate Only

2B/11 Repairing of roof structure with 150mm x 100mm (6"x4") timber beams

instead of removed damaged timber beams. 1 m Rate Only

2B/12 Repairing of roof structure with 200mm x 100mm (8"x4") timber beams

instead of removed damaged timber beams. 1 m Rate Only

2B/13 Repairing of roof structure with 50mm x 100mm (2”x4”) rafters instead of

removed damaged timber rafters. 1 m Rate Only

2B/14 Repairing of roof structure with 50mm x 25mm (2”x4”) reepers instead of

removed damaged timber reepers. 1 m Rate Only

Re-Fixing of Removed Timber Members

2B/15 Fixing of existing removed re-usable 50mm x 150mm (2”x6”) ridge plate.

1 m Rate Only

2B/16 Fixing of existing removed re-usable 75mm x 100mm (3”x4”) wall plate/

struts. 1 m Rate Only

2B/17 Fixing of existing removed re-usable 50mm x 150mm (2”x6”) valley/ hip

rafter. 1 m Rate Only

2B/18 Fixing of existing removed re-usable 125mm x 50mm (5”x2”) or 125mm x

75mm (5"x3") purling. 1 m Rate Only

2B/19 Fixing of existing removed re-usable 150mm x 100mm (6"x4") timber

beams. 1 m Rate Only

2B/20 Fixing of existing removed re-usable 200mm x 100mm (8"x4") timber

beams. 1 m Rate Only

2B/21 Fixing of existing removed re-usable 50mm x 100mm (2”x4”) rafters.

1 m Rate Only

2B/22 Fixing of existing removed re-usable 50mm x 25mm (2”x4”) reepers.

1 m Rate Only

Amount carried to summary Rs

Bill No. 01 Renovation of Roof at CSC Building Boralesgamuwa 5

Item

No

2C/- METAL WORK

Rate shall include for machine drilled, bolt holes, bolts, nuts and

washers, cleats, shoe and gusset plates and all other connections and all

structural steel should be of Grade 43 to BS 4360. All welding consumable

should comply to BS 5135. All bolts and nuts should comply with BS 4190 or

BS 3693 and washers should comply to BS 4320. All shoe plates and base

plates should be 10mm TK MS plates unless otherwise specified. All welds

should be 6mm TK fillet weld unless otherwise specified.

Note

2C/01 Repairing of steel roofing structure by removing damaged steel members

and re-fixing new steel members instead of removed members.

1 Item

2C/02 Repainting of existing steel roof structure with two coat

Documents

Tender Notice
Login to view

Sri Lanka Public Procurement Intelligence

Frequently asked questions

The bid deadline for Renovation of Roof was 17 Jun 2022. Bidding is closed.

This tender has been issued by LANKA ELECTRICITY COMPANY (PRIVATE) LIMITED in Sri Lanka.

The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.

This tender is Self Financed

The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.

The TendersOnTime reference is 66973673. The purchaser document reference is LECO/22/SHL/WK4/195.

Browse other tenders from Sri Lanka or search by relevant keywords and CPV classification.