Quotation are invited for Removal, Fabrication, Supply, Installation of Extractor Fins Assembly.
Job1032100134 Gt12 Vent.Rfx Description.
Removal, fabrication, supply, installation of extractor fins assembly for GT enclosure ventilation system.scope of supply and technical details attached in procurement documentsfor the
vendors.
1.#INTRODUCTION & TECHNICAL SPECIFICATION:
THIS ENQUIRY IS RAISED TO REPLACE THE
DAMAGED AND CORRODED GT ENCLOSURE
VENTILATION SYSTE
M DUST EXTRACT FINS ASSEMBLIES AT
D-REPOWERING STATION UNITS, JEBELALI,
PLANT-1. SL. NO#ENCLOSURE NAME &
LOCATION#TECHNICAL SPECIFIC
ATION (SIZE OF PANELS) LENGTH X WIDTH X
DEPTH/THICKNESS IN MM#SUMMARIZED SCOPE OF
SUPPLY WORK WITH REFERENCE TO FIGURES OF
ANNEXURE1#QTY#REMARKS# 1# D12 GT ENCLOSURE
DELIVERY FAN SYSTEM DUST EXTRACT FAN FINS
ASSEMBLY# GT12 HAS TOTAL TWO SET OF
EXTRACT FINS ASSEMB
LY (APPROXIMATE SIZE OF ONE SET OF FINS
ASSEMBLY IS L X W X D 4500X1500X1500
MM)#REMOVAL OF EXISTING CORRODED DUST
EXTRACTS FINS AS
SEMBLY AND, SUPPLY AND INSTALLATION OF NEW
FABRICATED FINS ASSEMBLY INCLUDING ALL
OTHER ARRANGEMENTS SAME ASEXISTING.#2SETS#REFER T
HE ATTACHED DRAWINGS. # 1#SCOPE OF WORK
AND TECHNICAL SPECIFICATIONS: 1.1#THE
BIDDERS SHALL VISIT SITE AND COLLECT
INFORMATION REGA
RDING SIZES OF THE EXTRACT FINS ASSEMBLIES.
THE EXISTING DUST EXTRACT FIN ASSEMBLIES#
APPROXIMATE SIZES 4500MM X 1500MM X 1500MM
(L
ENGTH X WIDTH X DEPTH/THICKNESS IN MM) OF
EACH PANEL ENCLOSURE ARE MENTIONED IN
CLAUSE 2.11. IT IS THE CONTRACTOR#S
RESPONSIBILITY T
O TAKE CORRECT MEASUREMENT FOR
FABRICATION OF THE NEW EXTRACT FIN
ASSEMBLIES SO THAT REPLACEMENT OF EXISTING
FIN ASSEMBLIES IS DONE
WITHOUT ANY DIFFICULTY OR FURTHER SITE
MODIFICATION. 1.2#THE SUPPLIED FIN
ASSEMBLIES SHALL COMPLY WITH INTEGRATED IP
55 HOUSING OR U
L LISTED AND THICKNESS OF THE FIN ASSEMBLIES
AS SAME AS THE EXISTING. THE FIN ASSEMBLIES#DAMPER SHOULD BE CORROSION PROOF AND
COMPL
ETED WITH POWDER COATING OR PAINTING.
1.3#THE DUST EXTRACT FIN ASSEMBLIES IS TO BE
MADE BY RIGID GALVANIZED SHEETS.
1.4#MOUNTING HAR
DWARE WHICH PENETRATES THE ENCLOSURE
AND VIOLATES THE ENVIRONMENTAL RATING OF
THE PANELS SHALL NOT BE ALLOWED. ALL
HARDWARE SHALL BE
CORROSION RESISTANT. 1.5#FINISH: ALL DUST
EXTRACT FIN ASSEMBLIES SHALL HAVE A
BAKED-ON FINISH; COLOR SHALL BE AS PER
EXISTING COLOR
S. 1.6#DRAWING AND MATERIAL DETAILS SHALL BE
SUBMITTED ALONG WITH OFFER. 1.7#THE
CONTRACTOR SHALL OBTAIN APPROVAL OF THE
DRAWINGS AN
D DOCUMENTS BEFORE MANUFACTURING/
FABRICATION. 1.8#THE CONTRACTOR SHALL
REMOVE THE EXISTING DAMAGED/CORRODED
DUST EXTRACT FIN ASSEMB
LIES. 1.9#THE MEASUREMENTS / SIZES OF INSTALLED PANELS / SUPPORT ARRANGEMENTS &
LOCATIONS ARE GIVEN BELOW: 1.10#THE BIDDERS
SHALL SU
BMIT BREAKUP OF PRICE FOR THE ABOVE DUST
EXTRACT FIN ASSEMBLIES. 1.11#THE
CONTRACTOR SHALL FOLLOW ALL DEWA SAFETY,
SECURITY & ENVIRO
NMENTAL POLICIES & PRACTICES DURING THE
ENTIRE EXECUTION PERIOD OF THE SUPPLY
WORK. 2#GENERAL REQUIREMENTS: 2.1#THE
SUPPLIER S
HALL SUBMIT COMPLETE SPECIFICATION OF THE
OFFERED VENTILATION SYSTEM DUST EXTRACT
FINS ASSEMBLY ALONG WITH THEIR OFFER.
2.2#THE SITE
ENVIRONMENTAL CONDITIONS (SEASHORE) ARE
PARTICULARLY AGGRESSIVE. HENCE THE
SPECIFICATION OF EQUIPMENT SHALL BE
APPROPRIATELY DESIGN
ED & SUITABLY TREATED FOR CORROSION
PROTECTION. 2.3#THE CONTRACTOR SHALL
CARRY OUT ALL NECESSARY MECHANICAL WORK
SUCH AS CUTTING, WELDING, BRAZING, FABRICATION/CONNECTION,
DRAINPIPES AND THERMAL INSULATION,
MODIFICATION OF FOUNDATION & PLATFORM FOR
NEW SPLIT / PAC
KAGE UNIT TO COMPLETE THE REPLACEMENT JOB.
2.4#ANY OTHER WORK NOT EXPLICITLY INDICATED
HERE BUT REQUIRED TO COMPLETE THE
INSTALLATIO
N SAFELY OF THE AIR CONDITIONERS UNITS SHALL
BE INCLUDED IN THE SCOPE OF CONTRACTOR.
2.5#THE CONTRACTOR SHALL VISIT THE SITE AND
MAK
E HIM FULLY FAMILIAR WITH THE SCOPE OF WORK,
PLANT ACCESS, FACILITIES, COMPLEXITIES, ETC.
BEFORE HE SUBMITS HIS BID. SITE VISIT IS A
MUST FOR ALL CONTRACTORS AND IT WILL BE
ARRANGED ON 15TH DAY OF THE TENDER
FLOATING DATE BETWEEN 09 ~ 12 NOON WITH
PRIOR APPOINTMEN
T. CONTACT DETAILS: D-STATION MR. TARIQ
MOHAMMED ALHASHMI.
[email protected]050-2021721/04-8044114 D-STATION MR. G.RA DHAKRISHNAN.
[email protected], 050-5447961
/ 04-8044260 PROJECT IN CHARGE: D-STATION
MR. MIRZA SALMAN, MIRZA.SALMAN
@DEWA.GOV.AE, 050745-4159/04-8044351 2.6#NO
OTHER DATE WILL BE ENTERTAINED FOR SITE
VISIT. QUOTATIONS SUBMITTED WITHOUT
SITE-VISIT W
ILL BE DIS-QUALIFIED. 2.7#THE CONTRACTOR
SHALL FOLLOW ALL DEWA SAFETY, SECURITY &
ENVIRONMENTAL POLICIES & PRACTICES DURING
THE ENTI
RE EXECUTION PERIOD OF THE WORK.
3#GENERAL CONDITION & MOBILIZATION AT SITE
OF THE CONTRACT: 3.1#CONTRACTOR SHALL TAKE
CARE OF ALL
THE RELATED FORMALITIES LIKE MOBILIZATION
OF STAFF, TESTING & MEASURING INSTRUMENTS,
TOOL, PLANT MACHINERIES AND GATE PASS ETC.,
WE
LL IN ADVANCE FOR THE WORK. 3.2#THE
CONTRACTOR SHALL ARRANGE ALL SPECIALIZED
LABOR, SPARE PARTS, CONSUMABLES, TOOLS & TACKLES NECESS
ARY FOR THE JOB. THE CONTRACTOR
TECHNICIANS SHALL BRING THEIR PERSONAL
TOOLBOXES WITH THEM. DETAILS OF THE
CONSUMABLES & THEIR MATE
RIAL SAFETY DATA SHEET (MSDS) SHALL BE
SUBMITTED FOR APPROVAL. 3.3#NO
ENVIRONMENTALLY HAZARDOUS MATERIAL OR
PRACTICE WILL BE USED DU
RING THE ENTIRE PROJECT. 3.4#ON A WRITTEN
APPLICATION WITH RELEVANT PARTICULARS OF
THE STAFF AND VEHICLES OF THE CONTRACTOR,
DEWA WI
LL ISSUE TEMPORARY ENTRY PASSES FOR THEM
VALID UP TO THE PERIOD OF CONTRACT WORK.
THE CONTRACTOR SHALL APPLY FOR THE
TEMPORARY ENTR
Y PASSES 3 DAYS IN ADVANCE WITH A
PHOTOCOPY OF PASSPORT, 2 PASSPORT SIZE
PHOTOGRAPHS FOR EACH STAFF # PHOTOS IN CD,
ADDITIONALLY WIT
H A COPY OF DRIVING LICENSE FOR THE DRIVERS
AND A COPY OF VALID REGISTRATION CERTIFICATE FOR THE VEHICLES.
3.5#SCAFFOLDING MATERIALS
INCLUDING ERECTION, SAFETY BELTS AND
PERSONAL PROTECTIVE GEARS, TARPAULINS,
PLYWOOD PARTITION MATERIALS, ACCESS
LADDERS, HAND AND W
ORKING LAMPS, TEMPORARY SUPPORTS,
CLEANING AGENTS, CONSUMABLES, ETC., ARE TO
BE PROVIDED BY CONTRACTOR.
3.6#CONTRACTOR#S SUPERVISOR
SHALL ALWAYS BE AVAILABLE AT WORK SITE,
WHENEVER AND WHEREVER WORK IS IN
PROGRESS. HE WILL BE RESPONSIBLE FOR THE
SAFETY OF MEN / E
QUIPMENT AND TO ENSURE THAT WORK
EXECUTED IS OF NECESSARY QUALITY AND ON
SCHEDULE. 3.7#THE CONTRACTOR SHALL SUBMIT
THE TIME SCHEDULE
/ BAR CHART INDICATING EACH ACTIVITY.
3.8#WHENEVER WORK IS EXTENDED BEYOND THE
DAY HOURS, THE CONTRACTOR SHALL MOBILIZE
WORK FORCE
FOR NIGHT SHIFT ALSO TO COMPLETE THE JOB ON HAND AS DEMANDED AND THIS IS INCLUSIVE OF
WORK ON WEEKENDS / HOLIDAYS. NECESSARY
PRECAU
TIONS LIKE PERMIT FOR WORK, LIGHTING, FOOD
ARRANGEMENTS, TRANSPORTATION ETC. SHALL
BE TAKEN CARE BY THE CONTRACTOR.
CONTRACTOR WILL
TAKE NECESSARY PERMITS FOR WORKING IN
NIGHT / HOLIDAYS. HE WILL SUBMIT REQUEST FOR
SUCH WORKS AT LEAST 24 HOURS IN ADVANCE
FOR ARRAN
GING PERMIT TO WORK. 3.9#THE WORK SHALL BE
EXECUTED UNDER DEWA SUPERVISION AND WITH
SAFETY AND QUALITY REQUIREMENTS. 3.10#DEWA
SHALL
HAVE ACCESS TO CONTRACTOR#S SITE OF WORK
AT ALL TIMES. 3.11#DEWA WILL NOT ACCEPT ANY
CLAIM FOR EXTRAS BEYOND THE ORDER RATES /
PRIC
ES DURING AND AFTER THE EXECUTION OF WORK
ORDERED. 3.12#THE CONTRACTOR WILL BE
PROVIDED WITH THE EQUIPMENT SHUTDOWN
PROGRAM (WHENEVER IT IS REQUIRED) IN COORDINATION WITH
OPERATIONS DEPARTMENT. 3.13#CRANE OR
FORKLIFT WILL BE ARRANGED BY DEWA FOR
MATERIAL LIFTING D
URING LOADING OR UNLOADING OF THE JOB
MATERIALS, SUBJECT TO AVAILABILITY AND ON
PRIOR REQUEST. SUCH REQUIREMENTS SHALL BE
INTIMATED
TO DEWA AT LEAST 2 - WORKING DAYS AHEAD OF
THE WORK. 3.14#THE COMPLETION OF THE WORK
SHALL BE AS PER DEWA SCHEDULE & PROGRAM.
4#SA
FETY PRECAUTION & SITE CLEANLINESS: 4.1#THE
AREA OF WORK SHALL BE KEPT CLEAN AT ALL
TIMES BEFORE, DURING AND AFTER THE WORK.
SPILLAG
E AND SPLASHES SHALL BE AVOIDED; IT SHOULD
BE CLEANED IMMEDIATELY IN CASE OF IT
OCCURRED. 4.2#THE CONTRACTOR AT DEWA
WORK PREMISES S
HALL FOLLOW DEWA SAFETY & ENVIRONMENT
POLICY, RULES REGULATIONS DURING THE
CONTRACT PERIOD, SHALL PROVIDE HIS SAFETY
PLAN BEFORE COM
MENCEMENT OF WORK, AND SHALL OBTAIN
CLEARANCE FROM DEWA FOR THIS PROCEDURE.
4.3#THE CONTRACTOR SHALL CARRY OUT RISK
ASSESSMENT FOR A
LL HIS WORKS. THIS RISK ASSESSMENT SHALL BE
BASED ON OCCUPATIONAL HEALTH & SAFETY
REQUIREMENTS. (DEWA FORMAT TO BE USED).
4.4#TOOLBO
X TALKS SHOULD BE GIVEN
STANDARD TERMS & CONDITIONS
1) Prices should be `DDP` delivery duty paid at DEWA stores.
2) Quotation to be submitted only in local currency U.A.E Dirhams
3) DEWA Standard payment terms is `30 days credit` from the date of acceptance of material
4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest.