The DUBAI ELECTRICITY & WATER AUTHORITY (DEWA) has issued a Tender notice for the procurement of a Removal, Fabrication, Supply, Installation of Extractor Fins Assembly in the UAE. This Tender notice was published on 25 Jan 2021 and is scheduled to close on 28 Jan 2021, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 49530026, while the tender notice number is 2332100194 and Register on the platform.

Key facts

Summary
Removal, Fabrication, Supply, Installation of Extractor Fins Assembly
TOT Ref. No.
49530026
Document Ref. No.
2332100194
Country
UAE
Notice type
Tender
Competition
ICB
Publication date
25 Jan 2021
Bid deadline
28 Jan 2021
EMD
Refer Document
Tender value
Refer Document
Purchaser ownership
-
Financier
Self Financed

Purchaser details

Purchaser contact is for registered users

Login to see details

Tender details

Quotation are invited for Removal, Fabrication, Supply, Installation of Extractor Fins Assembly.
Job1032100134 Gt12 Vent.Rfx Description.
Removal, fabrication, supply, installation of extractor fins assembly for GT enclosure ventilation system.scope of supply and technical details attached in procurement documentsfor the

vendors.
1.#INTRODUCTION & TECHNICAL SPECIFICATION:

THIS ENQUIRY IS RAISED TO REPLACE THE

DAMAGED AND CORRODED GT ENCLOSURE

VENTILATION SYSTE

M DUST EXTRACT FINS ASSEMBLIES AT

D-REPOWERING STATION UNITS, JEBELALI,

PLANT-1. SL. NO#ENCLOSURE NAME &

LOCATION#TECHNICAL SPECIFIC

ATION (SIZE OF PANELS) LENGTH X WIDTH X

DEPTH/THICKNESS IN MM#SUMMARIZED SCOPE OF

SUPPLY WORK WITH REFERENCE TO FIGURES OF

ANNEXURE1#QTY#REMARKS# 1# D12 GT ENCLOSURE

DELIVERY FAN SYSTEM DUST EXTRACT FAN FINS

ASSEMBLY# GT12 HAS TOTAL TWO SET OF

EXTRACT FINS ASSEMB

LY (APPROXIMATE SIZE OF ONE SET OF FINS

ASSEMBLY IS L X W X D 4500X1500X1500

MM)#REMOVAL OF EXISTING CORRODED DUST

EXTRACTS FINS AS

SEMBLY AND, SUPPLY AND INSTALLATION OF NEW

FABRICATED FINS ASSEMBLY INCLUDING ALL

OTHER ARRANGEMENTS SAME ASEXISTING.#2SETS#REFER T

HE ATTACHED DRAWINGS. # 1#SCOPE OF WORK

AND TECHNICAL SPECIFICATIONS: 1.1#THE

BIDDERS SHALL VISIT SITE AND COLLECT

INFORMATION REGA

RDING SIZES OF THE EXTRACT FINS ASSEMBLIES.

THE EXISTING DUST EXTRACT FIN ASSEMBLIES#

APPROXIMATE SIZES 4500MM X 1500MM X 1500MM

(L

ENGTH X WIDTH X DEPTH/THICKNESS IN MM) OF

EACH PANEL ENCLOSURE ARE MENTIONED IN

CLAUSE 2.11. IT IS THE CONTRACTOR#S

RESPONSIBILITY T

O TAKE CORRECT MEASUREMENT FOR

FABRICATION OF THE NEW EXTRACT FIN

ASSEMBLIES SO THAT REPLACEMENT OF EXISTING

FIN ASSEMBLIES IS DONE

WITHOUT ANY DIFFICULTY OR FURTHER SITE

MODIFICATION. 1.2#THE SUPPLIED FIN

ASSEMBLIES SHALL COMPLY WITH INTEGRATED IP

55 HOUSING OR U

L LISTED AND THICKNESS OF THE FIN ASSEMBLIES

AS SAME AS THE EXISTING. THE FIN ASSEMBLIES#DAMPER SHOULD BE CORROSION PROOF AND

COMPL

ETED WITH POWDER COATING OR PAINTING.

1.3#THE DUST EXTRACT FIN ASSEMBLIES IS TO BE

MADE BY RIGID GALVANIZED SHEETS.

1.4#MOUNTING HAR

DWARE WHICH PENETRATES THE ENCLOSURE

AND VIOLATES THE ENVIRONMENTAL RATING OF

THE PANELS SHALL NOT BE ALLOWED. ALL

HARDWARE SHALL BE

CORROSION RESISTANT. 1.5#FINISH: ALL DUST

EXTRACT FIN ASSEMBLIES SHALL HAVE A

BAKED-ON FINISH; COLOR SHALL BE AS PER

EXISTING COLOR

S. 1.6#DRAWING AND MATERIAL DETAILS SHALL BE

SUBMITTED ALONG WITH OFFER. 1.7#THE

CONTRACTOR SHALL OBTAIN APPROVAL OF THE

DRAWINGS AN

D DOCUMENTS BEFORE MANUFACTURING/

FABRICATION. 1.8#THE CONTRACTOR SHALL

REMOVE THE EXISTING DAMAGED/CORRODED

DUST EXTRACT FIN ASSEMB

LIES. 1.9#THE MEASUREMENTS / SIZES OF INSTALLED PANELS / SUPPORT ARRANGEMENTS &

LOCATIONS ARE GIVEN BELOW: 1.10#THE BIDDERS

SHALL SU

BMIT BREAKUP OF PRICE FOR THE ABOVE DUST

EXTRACT FIN ASSEMBLIES. 1.11#THE

CONTRACTOR SHALL FOLLOW ALL DEWA SAFETY,

SECURITY & ENVIRO

NMENTAL POLICIES & PRACTICES DURING THE

ENTIRE EXECUTION PERIOD OF THE SUPPLY

WORK. 2#GENERAL REQUIREMENTS: 2.1#THE

SUPPLIER S

HALL SUBMIT COMPLETE SPECIFICATION OF THE

OFFERED VENTILATION SYSTEM DUST EXTRACT

FINS ASSEMBLY ALONG WITH THEIR OFFER.

2.2#THE SITE

ENVIRONMENTAL CONDITIONS (SEASHORE) ARE

PARTICULARLY AGGRESSIVE. HENCE THE

SPECIFICATION OF EQUIPMENT SHALL BE

APPROPRIATELY DESIGN

ED & SUITABLY TREATED FOR CORROSION

PROTECTION. 2.3#THE CONTRACTOR SHALL

CARRY OUT ALL NECESSARY MECHANICAL WORK

SUCH AS CUTTING, WELDING, BRAZING, FABRICATION/CONNECTION,

DRAINPIPES AND THERMAL INSULATION,

MODIFICATION OF FOUNDATION & PLATFORM FOR

NEW SPLIT / PAC

KAGE UNIT TO COMPLETE THE REPLACEMENT JOB.

2.4#ANY OTHER WORK NOT EXPLICITLY INDICATED

HERE BUT REQUIRED TO COMPLETE THE

INSTALLATIO

N SAFELY OF THE AIR CONDITIONERS UNITS SHALL

BE INCLUDED IN THE SCOPE OF CONTRACTOR.

2.5#THE CONTRACTOR SHALL VISIT THE SITE AND

MAK

E HIM FULLY FAMILIAR WITH THE SCOPE OF WORK,

PLANT ACCESS, FACILITIES, COMPLEXITIES, ETC.

BEFORE HE SUBMITS HIS BID. SITE VISIT IS A

MUST FOR ALL CONTRACTORS AND IT WILL BE

ARRANGED ON 15TH DAY OF THE TENDER

FLOATING DATE BETWEEN 09 ~ 12 NOON WITH

PRIOR APPOINTMEN

T. CONTACT DETAILS: D-STATION MR. TARIQ

MOHAMMED ALHASHMI.

[email protected]

050-2021721/04-8044114 D-STATION MR. G.RA DHAKRISHNAN.

[email protected], 050-5447961

/ 04-8044260 PROJECT IN CHARGE: D-STATION

MR. MIRZA SALMAN, MIRZA.SALMAN

@DEWA.GOV.AE, 050745-4159/04-8044351 2.6#NO

OTHER DATE WILL BE ENTERTAINED FOR SITE

VISIT. QUOTATIONS SUBMITTED WITHOUT

SITE-VISIT W

ILL BE DIS-QUALIFIED. 2.7#THE CONTRACTOR

SHALL FOLLOW ALL DEWA SAFETY, SECURITY &

ENVIRONMENTAL POLICIES & PRACTICES DURING

THE ENTI

RE EXECUTION PERIOD OF THE WORK.

3#GENERAL CONDITION & MOBILIZATION AT SITE

OF THE CONTRACT: 3.1#CONTRACTOR SHALL TAKE

CARE OF ALL

THE RELATED FORMALITIES LIKE MOBILIZATION

OF STAFF, TESTING & MEASURING INSTRUMENTS,

TOOL, PLANT MACHINERIES AND GATE PASS ETC.,

WE

LL IN ADVANCE FOR THE WORK. 3.2#THE

CONTRACTOR SHALL ARRANGE ALL SPECIALIZED

LABOR, SPARE PARTS, CONSUMABLES, TOOLS & TACKLES NECESS

ARY FOR THE JOB. THE CONTRACTOR

TECHNICIANS SHALL BRING THEIR PERSONAL

TOOLBOXES WITH THEM. DETAILS OF THE

CONSUMABLES & THEIR MATE

RIAL SAFETY DATA SHEET (MSDS) SHALL BE

SUBMITTED FOR APPROVAL. 3.3#NO

ENVIRONMENTALLY HAZARDOUS MATERIAL OR

PRACTICE WILL BE USED DU

RING THE ENTIRE PROJECT. 3.4#ON A WRITTEN

APPLICATION WITH RELEVANT PARTICULARS OF

THE STAFF AND VEHICLES OF THE CONTRACTOR,

DEWA WI

LL ISSUE TEMPORARY ENTRY PASSES FOR THEM

VALID UP TO THE PERIOD OF CONTRACT WORK.

THE CONTRACTOR SHALL APPLY FOR THE

TEMPORARY ENTR

Y PASSES 3 DAYS IN ADVANCE WITH A

PHOTOCOPY OF PASSPORT, 2 PASSPORT SIZE

PHOTOGRAPHS FOR EACH STAFF # PHOTOS IN CD,

ADDITIONALLY WIT

H A COPY OF DRIVING LICENSE FOR THE DRIVERS

AND A COPY OF VALID REGISTRATION CERTIFICATE FOR THE VEHICLES.

3.5#SCAFFOLDING MATERIALS

INCLUDING ERECTION, SAFETY BELTS AND

PERSONAL PROTECTIVE GEARS, TARPAULINS,

PLYWOOD PARTITION MATERIALS, ACCESS

LADDERS, HAND AND W

ORKING LAMPS, TEMPORARY SUPPORTS,

CLEANING AGENTS, CONSUMABLES, ETC., ARE TO

BE PROVIDED BY CONTRACTOR.

3.6#CONTRACTOR#S SUPERVISOR

SHALL ALWAYS BE AVAILABLE AT WORK SITE,

WHENEVER AND WHEREVER WORK IS IN

PROGRESS. HE WILL BE RESPONSIBLE FOR THE

SAFETY OF MEN / E

QUIPMENT AND TO ENSURE THAT WORK

EXECUTED IS OF NECESSARY QUALITY AND ON

SCHEDULE. 3.7#THE CONTRACTOR SHALL SUBMIT

THE TIME SCHEDULE

/ BAR CHART INDICATING EACH ACTIVITY.

3.8#WHENEVER WORK IS EXTENDED BEYOND THE

DAY HOURS, THE CONTRACTOR SHALL MOBILIZE

WORK FORCE

FOR NIGHT SHIFT ALSO TO COMPLETE THE JOB ON HAND AS DEMANDED AND THIS IS INCLUSIVE OF

WORK ON WEEKENDS / HOLIDAYS. NECESSARY

PRECAU

TIONS LIKE PERMIT FOR WORK, LIGHTING, FOOD

ARRANGEMENTS, TRANSPORTATION ETC. SHALL

BE TAKEN CARE BY THE CONTRACTOR.

CONTRACTOR WILL

TAKE NECESSARY PERMITS FOR WORKING IN

NIGHT / HOLIDAYS. HE WILL SUBMIT REQUEST FOR

SUCH WORKS AT LEAST 24 HOURS IN ADVANCE

FOR ARRAN

GING PERMIT TO WORK. 3.9#THE WORK SHALL BE

EXECUTED UNDER DEWA SUPERVISION AND WITH

SAFETY AND QUALITY REQUIREMENTS. 3.10#DEWA

SHALL

HAVE ACCESS TO CONTRACTOR#S SITE OF WORK

AT ALL TIMES. 3.11#DEWA WILL NOT ACCEPT ANY

CLAIM FOR EXTRAS BEYOND THE ORDER RATES /

PRIC

ES DURING AND AFTER THE EXECUTION OF WORK

ORDERED. 3.12#THE CONTRACTOR WILL BE

PROVIDED WITH THE EQUIPMENT SHUTDOWN

PROGRAM (WHENEVER IT IS REQUIRED) IN COORDINATION WITH

OPERATIONS DEPARTMENT. 3.13#CRANE OR

FORKLIFT WILL BE ARRANGED BY DEWA FOR

MATERIAL LIFTING D

URING LOADING OR UNLOADING OF THE JOB

MATERIALS, SUBJECT TO AVAILABILITY AND ON

PRIOR REQUEST. SUCH REQUIREMENTS SHALL BE

INTIMATED

TO DEWA AT LEAST 2 - WORKING DAYS AHEAD OF

THE WORK. 3.14#THE COMPLETION OF THE WORK

SHALL BE AS PER DEWA SCHEDULE & PROGRAM.

4#SA

FETY PRECAUTION & SITE CLEANLINESS: 4.1#THE

AREA OF WORK SHALL BE KEPT CLEAN AT ALL

TIMES BEFORE, DURING AND AFTER THE WORK.

SPILLAG

E AND SPLASHES SHALL BE AVOIDED; IT SHOULD

BE CLEANED IMMEDIATELY IN CASE OF IT

OCCURRED. 4.2#THE CONTRACTOR AT DEWA

WORK PREMISES S

HALL FOLLOW DEWA SAFETY & ENVIRONMENT

POLICY, RULES REGULATIONS DURING THE

CONTRACT PERIOD, SHALL PROVIDE HIS SAFETY

PLAN BEFORE COM

MENCEMENT OF WORK, AND SHALL OBTAIN

CLEARANCE FROM DEWA FOR THIS PROCEDURE.

4.3#THE CONTRACTOR SHALL CARRY OUT RISK

ASSESSMENT FOR A

LL HIS WORKS. THIS RISK ASSESSMENT SHALL BE

BASED ON OCCUPATIONAL HEALTH & SAFETY

REQUIREMENTS. (DEWA FORMAT TO BE USED).

4.4#TOOLBO

X TALKS SHOULD BE GIVEN
STANDARD TERMS & CONDITIONS

1) Prices should be `DDP` delivery duty paid at DEWA stores.

2) Quotation to be submitted only in local currency U.A.E Dirhams

3) DEWA Standard payment terms is `30 days credit` from the date of acceptance of material

4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest.

Documents

Tender Notice
Login to view

UAE Public Procurement Intelligence

Frequently asked questions

The bid deadline for Removal, Fabrication, Supply, Installation of Extractor Fins Assembly was 28 Jan 2021. Bidding is closed.

This tender has been issued by DUBAI ELECTRICITY & WATER AUTHORITY (DEWA) in UAE.

The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.

This tender is Self Financed

The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.

The TendersOnTime reference is 49530026. The purchaser document reference is 2332100194.

Browse other tenders from UAE or search by relevant keywords and CPV classification.