Procurement Summary
Country: Ireland
Summary: Remediation Works at Ardara Bridge National Monument Cadamstown Co. Offaly
Deadline: 05 May 2026
Posting Date: 26 Mar 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 138503851
Document Ref. No.: 209851-2026
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: EUR 834300
CPV Classification
45221100 - Construction work for bridges
45000000 - Construction work
45262210 - Foundation work
45112300 - Infill and land-reclamation work
45112400 - Excavating work
45453000 - Overhaul and refurbishment work
92522000 - Preservation services of historical sites and buildings
92522100 - Preservation services of historical sites
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
In summary, the works involved in this project generally consist of the following: • Installation of self-drilling soil nails and mesh to stabilise the failed slope. • Excavation of failed slope and removal of the existing gabion baskets on site, including provision of temporary works propping to support steel arch frame which has one leg erected on the gabions. • Construction of a new foundation for the failed wing wall. • Extension of the soils and installation of mesh to re-build embankment to required height. This will be typical of a reinforced soil embankment with mesh finishing using a ‘bottom-up- construction sequence • Installation of horizontal drains to allow groundwater to drain from the slope. • Construction of new masonry wing wall. • Extending top of existing walls on site. • Surface finishing. • Reinstatement, pointing and general repair work as required. The works will be completed on the downstream side of the bridge only with no disturbance to the existing conditions on the northern side which is considered in good condition. The Contractor shall provide all labour and plant resources for construction of the Works unless otherwise stated. All temporary works and access are the responsibility of the contractor The Contractor shall note that due to the requirement to work on steep side slopes considerable temporary works may be required to ensure the works are done in a safe manner. The Contractor shall supply all materials required for the temporary and perm...
Document Type: Contract Notice
Contract Type: works
Estimated Value: 834300 - EUR
Authority Type: cga
Doc Title: Remediation Works at Ardara Bridge National Monument Cadamstown Co. Offaly
Dispatch Date: 2026-03-25
Publish Date: 2026-03-26
Submission Date: 2026-05-05
Documents
Tender Notice