Expired Tender Denmark ICB TOT Ref. 22800586

Qualification system without call for competition Tender - 22800586

Tender notice from Denmark, published on 26 Apr 2018.

Exeutive Summary

The ØRSTED BIOENERGY & THERMAL POWER A/S has issued a Tender notice for the procurement of a Qualification system without call for competition: This Supplier qualification system can be used to supply modules to projects with the purpose of establishing Bioenergy plant. A module represents a... in the Denmark. This Tender notice was published on 26 Apr 2018 and is scheduled to close on 26 Apr 2019, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 22800586, while the tender notice number is 182350-2018 and Register on the platform.

Key facts

Summary
Qualification system without call for competition: This Supplier qualification system can be used to supply modules to projects with the purpose of establishing Bioenergy plant. A module represents a...
TOT Ref. No.
22800586
Document Ref. No.
182350-2018
Country
Denmark
Notice type
Tender
Competition
ICB
Publication date
26 Apr 2018
Bid deadline
26 Apr 2019
EMD
Refer Document
Tender value
Refer Document
Purchaser ownership
-
Financier
Self Financed

CPV classification

Purchaser details

Purchaser contact is for registered users

Login to see details

Tender details

Object of the contract
This Supplier qualification system can be used to supply modules to projects with the purpose of establishing Bioenergy plant. A module represents a category.The categories are:1 - EA - Waste preparation is a module for preparation of the waste before sorting2 - ES - 2D/3D Sorting is a module for sorting3 - EP - Solid/Liquid is where the enzymatically treated waste is split into 3 different value streams: 2D materials, 3D materials, Bioliquid4 - EH - Bioliquid Cleaning is where the bioliquid recovered from the different parts of the process is cleaned and prepared to be sent to the biogas (AD) plant.5 - EB - 2D/3D Washing is where the wet 2D and 3D material passed from the Module EP is washed to remove the residual bioliquid and dewater as necessary before passing to Module ES Sorting.The process in the Module EB works in accordance with the water loop concept. The wash water used in the 2D washing must be circulated over a separation step to reduce the inerts content in the washing water to ensure an efficient washing process.6 - RH - Biogas Cleaning is where the biogas is cleaned to remove impurities to acceptable levels depending on the downstream operation- CHP (Module MR) or Biogas upgrade (Module RK).The cleaned biogas from Module RH, could have two destinations either Module MR or Module RK7- MR - Biogas CHP is where the biogas is utilized for gas Engines (CHPs) to produce green electricity and excess heat as process heat for the plant or for external purposes.8 - RK - Biogas Upgrade is where the biogas is upgraded to green natural gas ready to be injectedTo the natural gas grid. Depending on the Technical solution chosen, CO2 can also be produced as a by-product.9 - GD - Digestate System is a module that separates the digestate from the AD plant into solid fraction and reject water fraction. The solid digestate fraction will be shipped to recipient while the reject water is transported to Reject water storage.10 - GT - Water Cleaning is a module that dissolved and suspended inerts and salts are removed from a fraction of the Reject water to prevent accumulation of salts and nutrients in the process loop.11 - GR - Water System is a module that comprises the central water system of the plant, with tanks, pumps, heating and cooling, for all water qualities in the process.12 - RA - AD plant is where the biomass undergoes Anaerobic Digestion process. The Anaerobic Digestion (AD) process is a bacteriological process that breaks down organic material under oxygen-free conditions to produce a mixture of methane and carbon dioxide gas called biogas. The produced biogas (60 % CH4 + 40 % CO2) is subsequently passed for cleaning. The digestate is passed to for further treatment.13 - EE - Reactors is where the MSW is mixed with warm water, enzymes and pH adjusting components and enzymatically hydrolyzed. The function has several purposes:• Homogenous mix of MSW with heated water and enzymes.• Enzymatically treating the mixture to sufficient retention time under optimum conditions.• Treated waste buffer where bioliquid is drained off and the enzymatically treated waste is transferred to Module EP, in an even and continuous flow.14 - All categories - EA - Waste preparation, ES - 2D/3D Sorting, EP - Solid/Liquid, EH - Bioliquid Cleaning, EB - 2D/3D Washing, RH - Biogas Cleaning, MR - Biogas CHP, RK - Biogas Upgrade, GD - Digestate System, GT - Water Cleaning, GR - Water System, RA - AD plant, EE - Reactors A full system including all modules.Candidates applying admission for the Supplier Qualification System must be capable of providing all or some of the modules described above. See also section 3.1, Guideline to Supplier Qualification System (supplying these systems does not set out requirements to the level of own-production and sub-contracting).The candidates must be able to supply the Modules in Europe. Candidates are encouraged to provide details on which market candidates are operating on.
Description: Qualification system without call for competition: This Supplier qualification system can be used to supply modules to projects with the purpose of establishing Bioenergy plant. A module represents a category.The categories are:1 - EA Waste preparation is a module for preparation of the waste before sorting2 - ES 2D/3D Sorting is a module for sorting3 - EP Solid/Liquid is where the enzymatically treated waste is split into 3 different value streams: 2D materials, 3D materials, Bioliquid4 - EH Bioliquid Cleaning is where the bioliquid recovered from the different parts of the process is cleaned and prepared to be sent to the biogas (AD) plant.5 - EB 2D/3D Washing is where the wet 2D and 3D material passed from the Module EP is washed to remove the residual bioliquid and dewater as necessary before passing to Module ES Sorting.The process in the Module EB works in accordance with the water loop concept. The wash water used in the 2D washing must be circulated over a separation step to reduce the inerts content in the washing water to ensure an efficient washing process.6 - RH Biogas Cleaning is where the biogas is cleaned to remove impurities to acceptable levels depending on the downstream operation- CHP (Module MR) or Biogas upgrade (Module RK).The cleaned biogas from Module RH, could have two destinations either Module MR or Module RK7- MR Biogas CHP is where the biogas is utilized for gas Engines (CHPs) to produce green electricity and excess heat as process heat for the plant or for external purposes.8 - RK Biogas Upgrade is where the biogas is upgraded to green natural gas ready to be injectedTo the natural gas grid. Depending on the Technical solution chosen, CO2 can also be produced as a by-product.9 - GD Digestate System is a module that separates the digestate from the AD plant into solid fraction and reject water fraction. The solid digestate fraction will be shipped to recipient while the reject water is transported to Reject water storage.10 - GT Water Cleaning is a module that dissolved and suspended inerts and salts are removed from a fraction of the Reject water to prevent accumulation of salts and nutrients in the process loop.11 - GR Water System is a module that comprises the central water system of the plant, with tanks, pumps, heating and cooling, for all water qualities in the process.12 - RA - AD plant is where the biomass undergoes Anaerobic Digestion process. The Anaerobic Digestion (AD) process is a bacteriological process that breaks down organic material under oxygen-free conditions to produce a mixture of methane and carbon dioxide gas called biogas. The produced biogas (60 % CH4 + 40 % CO2) is subsequently passed for cleaning. The digestate is passed to for further treatment.13 - EE Reactors is where the MSW is mixed with warm water, enzymes and pH adjusting components and enzymatically hydrolyzed. The function has several purposes:• Homogenous mix of MSW with heated water and enzymes.• Enzymatically treating the mixture to sufficient retention time under optimum conditions.• Treated waste buffer where bioliquid is drained off and the enzymatically treated waste is transferred to Module EP, in an even and continuous flow.14 - All categories - EA Waste preparation, ES 2D/3D Sorting, EP Solid/Liquid, EH Bioliquid Cleaning, EB 2D/3D Washing, RH Biogas Cleaning, MR Biogas CHP, RK Biogas Upgrade, GD Digestate System, GT Water Cleaning, GR Water System, RA - AD plant, EE Reactors A full system including all modules.Candidates applying admission for the Supplier Qualification System must be capable of providing all or some of the modules described above. See also section 3.1, Guideline to Supplier Qualification System (supplying these systems does not set out requirements to the level of own-production and sub-contracting).The candidates must be able to supply the Modules in Europe. Candidates are encouraged to provide details on which market candidates are operating on.
Authority Type: Utilities entity
Contact Nature: Works
Procedure: Not applicable
Document: Qualification system without call for competition
Regulation: European Union
Award criteria: Not specified
CPV code: 45222100
CPV Description: Waste-treatment plant construction work.
Industrial machinery.
Lifting and handling equipment and parts.
Shredders.
Generators.
Generating sets.
Generating sets with compression-ignition engines.
Power converters.
Electric rotary converters.
Generator units.
Steam-turbine generator and related apparatus.
Turbine generator sets.
Turbine generator control apparatus.
Gas cooling systems.
Generator rotors.
Parts of gas generators.
Transformers.
Liquid dielectric transformers.
Voltage transformers.
Instrument transformer.
Power supply transformers.
Measuring instruments.
Electric instantaneous or storage water heaters and immersion heaters.
Turbines and motors.
Motors.
Turbine installations.
Parts of turbines.
Pumps and compressors.
Water pumps.
Pressure-reducing, control, check or safety valves.
Lifting and handling equipment.
Cranes, mobile lifting frames and works trucks fitted with a crane.
Cranes.
Conveyors.
Conveyor equipment.
Lifting, handling, loading or unloading machinery.
Mechanical handling equipment.
Loading or handling machinery.
Buckets, shovels, grabs and grips for cranes or excavators.
Heat-exchange units, air-conditioning and refrigerating equipment, and filtering machinery.
Heat-exchange units and machinery for liquefying air or other gases.
Heat-exchange units.
Heat pumps.
Machinery for liquefying air or other gases.
Air-conditioning installations.
Window air-conditioning machines.
Wall air-conditioning machines.
Machinery and apparatus for filtering or purifying gases.
Gas filters.
Non-domestic fans.
Parts of fans.
Washing installation.
Washing equipment.
Miscellaneous general and special-purpose machinery.
Machinery and apparatus for filtering liquids.
Filtration plant equipment.
Weighing machinery and scales.
Dosing plant.
Machinery for working rubber or plastics.
Scrapers.
Irrigation equipment.
Sorting and screening machines.
Pipeline, piping, pipes, casing, tubing and related items.
Steam and water pipes.
Tanks, reservoirs, containers and pressure vessels.
Storage tanks.
Water tanks.
Gas tanks.
Silos.
Water containers.
Refuse skips.
Containers for waste material.
Weighbridge construction work.
Waste disposal site construction work.
Structural steelworks.
Irrigation works.
Construction works for power plants and heating plants.
Compressed-air generating plant construction work.
District-heating plant construction work.
Sewage digesters.
Screening installations.
Plant upgrade work.
Building installation work.
Electrical installation work.
Electrical wiring and fitting work.
Turbine works.
Fire-prevention installation works.
Mechanical installations.
Repair and maintenance services for pumps, valves, taps and metal containers and machinery.
Repair and maintenance services of pumps, valves, taps and metal containers.
Repair and maintenance services of gas pumps.
Gas storage services.
Refuse and waste related services.
Non-hazardous refuse and waste treatment and disposal services.
Internet address (URL): https://orsted.com/
Directive: Classical Directive (2014/25/EU)

Documents

Tender Notice
Login to view

Similar tenders

Denmark Public Procurement Intelligence

Frequently asked questions

The bid deadline for Qualification system without call for competition: This Supplier qualification system can be used to supply modules to projects with the purpose of establishing Bioenergy plant. A module represents a... was 26 Apr 2019. Bidding is closed.

This tender has been issued by ØRSTED BIOENERGY & THERMAL POWER A/S in Denmark.

The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.

This tender is Self Financed

The tender is classified under the following CPV code(s): 45222100 - Waste-treatment plant construction work.

The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.

The TendersOnTime reference is 22800586. The purchaser document reference is 182350-2018.

See the Similar Tenders section on this page or browse other tenders from Denmark.

This tender falls under Construction and Real Estate in Denmark. Suppliers in these sectors can track similar Denmark tenders using CPV-based alerts.