The DUBAI ELECTRICITY & WATER AUTHORITY (DEWA) has issued a Tender notice for the procurement of a Pump out and Disposal in the UAE. This Tender notice was published on 18 Jan 2021 and is scheduled to close on 20 Jan 2021, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 49315959, while the tender notice number is 2412100063 and Register on the platform.
Quotation are invited for Job Pump out and Disposal 1032003280rfx Description. TECHNICAL AND GENERAL SPECIFICATION FOR
OUTSOURCING WORK M STATION, JEBEL ALI
POWER STATION DESCRIPTION: PUMPING OUT
AND DISPOSAL O
F HAZARDOUS WASTE WATER FROM PROPANE
GAS TANK AFTER HYDROTEST. QUANTITY: 06 NO`S
OF TANK EACH 5 M3 DURATION: 01 DAY FOR EACH
TANK.
CONTACT PERSON: ARVIND 0553905432 / HASSAN
0557769025 PRE BID CONDITION: 1.#THE
CONTRACTOR SHALL BE APPROVED BY DUBAI
MUNICIPALIT
Y IN HANDLING AND DISPOSAL OF HAZARDOUS
WASTE WATER AND SHALL HAVE PREVIOUS
EXPERIENCE. 2.#THE CONTRACTOR SHALL VISIT
THE SITE AND B
E FULLY FAMILIAR WITH THE WORK SCOPE, PLANT
ACCESS, FACILITIES, COMPLEXITIES, SAFETY
MEASURES ETC., BEFORE SUBMITTING THE BID.
SCOPE
OF WORK: 1.#MOBILIZE MEN/EQUIPMENT
(PNEUMATIC PUMP, HOSES, FITTINGS, SAFETY
TOOLS, ROAD TANKER AND REQUIRED CONSUMABLES ETC.) WITHI
N 02 DAY OF ADVANCE NOTICE. 2.#GET PTW
(PERMIT TO WORK) AND LC (LINE CLEARANCE)
DOCUMENT FROM DEWA. 3.#THE FOLLOWING
DOCUMENTS TO BE
SUBMITTED TO GET PTW: A.#METHOD STATEMENT
B.#RISK ASSESSMENT OF THE WORK C.#DYNAMIC
RISK ASSESSMENT AS PER SITE CONDITION.
D.#COSHH
E.#TOOL BOX TALK REPORT. 4.#ENSURE AREA IS
CORRECTLY SECURED AND SAFE TO WORK ON IN
ALL RESPECTS, PRIOR TO COMMENCING WORK,
THE CON
DITION OF WORK PLACE SHALL BE CHECKED BY
THE CONTRACTOR HSE OFFICER OR INSPECTOR
TO ENSURE IT IS SAFE TO WORK. 5.#CONDUCT
SITE SURVE
Y AND SAFETY INSPECTION TO ASSESS THE
WORKING ENVIRONMENT. 6.#IF THE WORKING
ENVIRONMENT IS SAFE, YOU CAN PROCEED WITH
THE FOLLOWING
STEPS. 7.#CONNECT THE PNEUMATIC PUMP
SUCTION HOSE TO TANK NOZZLE LOCATED AT THE TOP OF THE TANK. 8.#USE ONLY SPARK FREE
TESTED TOOL
S. 9.#ALL HOSES USED SHALL HAVE TEST
CERTIFICATES WITH TEST TAG. 10.#PUMP OUT THE
HAZARDOUS WATER USING PNEUMATIC PUMP TO
DUBAI MUNI
CIPALITY APPROVED TANKER FOR DISPOSAL.
11.#AVOID ANY LEAKAGE OF HAZARDOUS WATER
AND ENSURE SPILL KIT SHALL BE AVAILABLE AT
SITE FOR
ANY LEAK. 12.#TANK INTERNAL SURFACE SHALL BE
DRY AND FREE OF WATER & MOISTURE.
INSPECTION WILL BE DONE BY DEWA AUTHORIZED
PERSONNEL.
13.#DISPOSE THE ENTIRE HAZARDOUS WATER TO
DUBAI MUNICIPALITY APPROVED FACILITY.
14.#CARRYOUT HOUSEKEEPING OF THE WORK
AREA DURING A
ND AFTER COMPLETION OF THE JOB.
15.#DEMOBILIZE THE WORK FORCE, EQUIPMENT
AND TOOLS. 16.#SUBMIT THE FINAL REPORT
INCLUDING LABORATORY
REPORTS/DISPOSAL PROOF FROM DUBAI MUNICIPALITY APPROVED FACILITY. GENERAL
TERMS & CONDITION 1.#THE CONTRACTOR SHALL
HAVE THE EXPE
RIENCE OF THIS TYPE OF WORK. 2.#THE
CONTRACTOR SHALL SUBMIT THE SCHEDULE OF
WORK AND THE PERIOD FOR WORK INCLUDING
SCAFFOLDING SO AL
L OTHER WORKS SHALL BE COMPLETED WELL
WITHIN THE ALLOTTED PERIOD. THE SCHEDULE
SHALL BE APPROVED BY DEWA BEFORE
COMMENCEMENT OF WORK
. SCAFFOLDING UNDER DEWA SCOPE. 3.#THE
CONTRACTOR SHALL BE RESPONSIBLE FOR ANY
DELAY IN CARRYING OUT THE WORK. 4.#THE
CONTRACTOR SHA
LL ENSURE HOUSEKEEPING ON A DAILY BASIS AND
HE SHALL BE RESPONSIBLE FOR ALL WASTE
MATERIAL DISPOSALS TO DESIGNATED PLACES.
5.#ALL DE
WA SAFETY & ENVIRONMENT POLICY, RULES AND
REGULATION SHALL BE FOLLOWED AT WORK SITE
DURING THE EXECUTION OF THE WORK. THE
CONTRACTOR #S ENGINEER SHOULD BE FAMILIAR WITH SAFETY
REGULATIONS WHILE WORKING IN A HAZARDOUS
AREA. 6.#ALL POWER / RIGGING TOOLS# ETC.
SHOULD
BE DULY TESTED AND CERTIFIED BY THE 3RD
PARTY INSPECTION AGENCY AND THE
CERTIFICATES SHOULD BE PRODUCED ON
DEMAND. 7.#THE WORK SHALL
BE EXECUTED UNDER DEWA SUPERVISION AND
AS PER QUALITY / SCHEDULE REQUIREMENT.
CONTRACTOR#S SUPERVISOR SHALL BE
AVAILABLE AT SITE TH
ROUGHOUT THE PERIOD OF WORK. 8.#THE
CONTRACTOR SHALL APPLY FOR THE PERMIT TO
WORK WELL IN ADVANCE AND THIS REQUEST
SHALL BE FOLLOWED
WITH METHOD STATEMENT, RISK ASSESSMENT AS
ATTACHMENTS 9.#THE CONTRACTOR SHALL
START THE WORK AFTER GETTING HOT WORK
PERMIT / PERMIT
TO WORK FROM DEWA. 10.#ENTRY PERMITS FOR
THE WORKERS SHALL BE APPLIED WITH
PASSPORT COPIES HAVING VALID VISA. PERSONS, WHOSE NAMES
ARE NOT AVAILABLE IN THE LIST, WILL NOT BE
ALLOWED TO ENTER THE POWERHOUSE.
11.#ENTRY PERMITS FOR THE VEHICLE SHOULD BE
APPLIED WITH
COPIES OF VEHICLE REGISTRATION AND DRIVER
DRIVING LICENSE 12.#ENSURE THAT RUNNING
SYSTEM AND PERMANENT INSTALLATION ARE
PROTECTED F
ROM INTERRUPTION AND DAMAGES.
13.#CONTRACTOR IS RESPONSIBLE FOR ANY
DAMAGE TO THE EQUIPMENT DUE TO POOR
WORKMANSHIP; WRONG HANDLING
ETC. THE COST WILL BE RECOVERED FROM THE
CONTRACTOR. 14.#THE CONTRACTOR SHALL
ENSURE A SAFE WORKING CONDITION WHILE
WORK IN PROGRESS
. CONDUCT SITE SURVEY AND SAFETY INSPECTION
TO ASSESS THE WORKING ENVIRONMENT 15.#ALL
THE PERSONS SHALL WEAR THE UNIFORM,
SAFETY SHO
ES AND HELMET WHILE AT WORK AND NECESSARY
PPE WHILE WORK. 16.#SAFETY SIGNS SHALL BE PROVIDED AND WHEREVER REQUIRED THE AREA
IS TO BE
BARRICADED FOR SAFETY AND TO PREVENT
UNAUTHORIZED ENTRY OF PERSONNEL. 17.#ALL
MATERIAL AND TOOLS BROUGHT IN SHALL BE
DECLARED AT PO
WER STATION SECURITY GATE AND THE LIST OF
THESE ITEMS SHALL BE SIGNED BY DEWA
SECURITY. THE COPIES OF THESE DOCUMENTS
SHALL BE LODGE
D WITH DEWA ENGINEER IN-CHARGE ON DAILY
BASIS. THIS DOCUMENT WILL BE THE BASIS FOR
THE CLEARANCE (GATE PASS) TO TAKE THEM OUT
ON COM
PLETION OF THE JOB. 18.#ANY ACCIDENT/NEAR
MISS/ ABNORMALITY SHALL BE IMMEDIATELY
REPORTED TO DEWA ENGINEER-IN-CHARGE
19.#CONTINUOUS
SUPERVISION FOR THE ACTIVITY SHALL BE DONE.
NAME AND CONTACT NO. OF CONTRACTOR
SUPERVISOR SHALL BE PROVIDED. 20.#TOOLBOX
TALKS SHOUL
D BE GIVEN TO THE WORKMEN BY THEIR SUPERVISOR BEFORE START OF WORK. 21.#DEWA
ENGINEER-IN-CHARGE SHALL BE UPDATED THE
WORK PROGRESS O
N A REGULAR BASIS. COVID-19 PRECAUTION
SAFETY 1.#IN CASE OF STAFF RETURNING FROM
ABROAD WITHIN LAST 14 DAYS, VALID COVID 19
NEGATI
VE TEST RESULT ( NOT EXCEEDING 72 HOURS)
FROM EMIRATES OF DUBAI HEALTH
ORGANIZATION TO BE SUBMITTED ALONG WITH
THE GATE PASS DOCUMEN
T PRIOR TO APPLYING THE GATE PASS. 2.#NO
QUARANTINE APPLICABLE UNLESS DECIDED BY
GOVERNMENT OR THE STAFF HAVE COVID 19
POSITIVE TEST
RESULT. 3.#ALL THE STAFF OF THE CONTRACTOR
HAS TO FILL THE ATTACHED TRAVEL
DECLARATION FORM AND UNDERTAKING LETTER
FOR ALL THEIR ST
AFFS AND TO BE SUBMITTED TO DEWA DURING
APPLYING OF THE GATE PASS. 4.# CONTRACTOR
SHALL ENSURE SUFFICIENT AVAILABILITY OF
MASKS, GLOVES AND SANITIZER FOR THE EMPLOYEE DURING
THE WORK. 5.# CONTACTOR SHALL CHECK THE
BODY TEMPERATURE OF THEIR STAFFS DAILY
BEFORE ENTE
RING TO DEWA PREMISES AND REPORT TO BE
SUBMITTED TO DEWA CONCERNED ENGINEER ON
DAILY BASIS. 6.# STAFFS HAVING SYMPTOMS OF
FLUE / COU
GH / FEVER, SHOULD NOT REPORT TO DUTY.
TECHNICAL SAFETY DURING THE WORK
1.#CONTRACTOR STAFF MUST HAVE VALID GATE
PASS BEFORE ENTE
RING THE PLANT PREMISES. 2.#CONTRACTOR
SHALL GIVE DAILY TOOLBOX TALK, RISK
ASSESSMENT AND DYNAMIC RISK ASSESSMENT
TO THEIR STAFFS. 3
.#CONTRACTOR STAFF INVOLVED IN ANY ACTIVITY
SHALL CONFIRM THE AVAILABILITY OF LINE
CLEARANCE (LC) AND PERMIT TO WORK (PTW)
BEFORE ST
ART OF ANY WORK. 4.#CONTRACTOR STAFF MUST
CHECK AND VERIFY OF THE ISOLATIONS BEFORE
STARTING OF ANY OVERHAULING WORK. 5.#THE CONTRAC
TOR SHALL CHECK THE CONDITION SUITABLE TO
CARRY OUT THE WORK. CONDUCT SITE SURVEY
AND SAFETY INSPECTION TO ASSESS THE
WORKING ENVIRO
NMENT. 6.#CONTRACTOR SITE SUPERVISOR SHALL
BE CONTINUOUSLY PRESENT AT THE WORK SITE
TO SUPERVISE THE JOB. 7.#THE CONTRACTOR
MUST ENG
AGE A QUALIFIED SAFETY OFFICER TO ENSURE
OBSERVANCE OF SAFETY AND SAFE WORKING
PRACTICES BY HIS MEN AT SITE AT ALL TIME. THE
SAFETY
SUPERVISOR SHALL KEEP ALL RECORDS (TBT,
RISK ASSESSMENT, HOT WORK PERMIT, PTW,
MSDS, ALL SAFETY RELATED DOCUMENTS#).
8.#CONTRACTOR S
TAFF INVOLVED IN ANY ACTIVITY SHALL USE
APPROPRIATE PPES INCLUDING GLOVES, HELMET,
GOGGLES, SAFETY SHOE, MASK ETC.
9.#CONTRACTOR STA
FF SHALL USE FULL BODY SAFETY HARNESS
WHEN WORKING AT HEIGHT. 10.#ONLY TESTED AND CERTIFIED RIGGING TOOLS SHALL BE USED
DURING THE W
ORK. ALL THE RIGGING TOOLS MUST HAVE VALID
TEST CERTIFICATES AND IT MUST BE PRODUCE TO
DEWA FOREMAN/ ENGINEER UPON REQUEST.
11.#CONT
RACTOR MUST BE READY WITH ALL REQUIRED
RESOURCES TO EXECUTE THE WORK AS PER
AGREED SCOPE WORK DURING THE OUTAGE
SCHEDULE TO AVOID STANDARD TERMS & CONDITIONS
1) Prices should be `DDP` delivery duty paid at DEWA stores.
2) Quotation to be submitted only in local currency U.A.E Dirhams
3) DEWA Standard payment terms is `30 days credit` from the date of acceptance of material
4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest.
The bid deadline for Pump out and Disposal was 20 Jan 2021. Bidding is closed.
This tender has been issued by DUBAI ELECTRICITY & WATER AUTHORITY (DEWA) in UAE.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 49315959. The purchaser document reference is 2412100063.
Browse other tenders from UAE or search by relevant keywords and CPV classification.