Procurement Summary
Country: Syria
Summary: Provision of Reverse Osmosis (RO) System - Design and Construction for Safe Water Supply
Deadline: 02 Sep 2024
Posting Date: 20 Aug 2024
Other Information
Notice Type: Tender
TOT Ref.No.: 105995840
Document Ref. No.: SYRIA-TA-2024-030
Competition: ICB
Financier: Other Funding Agencies
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Tenders are invited for Provision of Reverse Osmosis (RO) System - Design and Construction for Safe Water Supply to Al Hol Camp in North-East Syria
The scope of this solicitation includes three main components:
1. Design, Supply, and Installation of the RO System and Its Components
including Operational and Maintenance (O&M) Support
o Testing the water source providing the water analysis table.
o Design the RO system based on the vendor assessed water quality parameters and
desired production capacity
o Supply and deliver all necessary components and equipment, including but not
limited to pre-treatment units, RO membranes, pumps, post-treatment systems,
and control systems and spare parts for a 90-day O&M period.
o Install the RO system at the designated site, ensuring proper integration with
existing infrastructure.
o Conduct testing and commissioning to verify that the system meets the specified
performance criteria.
o Provide comprehensive O&M support for the RO system for 90 days after
commissioning.
o Train local personnel on the operation and maintenance of the system.
o Conduct regular maintenance checks and provide technical support to ensure
optimal performance.
o Confirm to providing Certificate of Origin for all pumps generators and accessories
after contract signing
o Provide a detailed O&M manual and ensure spare parts availability during the
support period.
Civil Works to House the RO System
o Design and construct the necessary civil infrastructure to house the RO system,
including but not limited to:
A secure building or structure to protect the equipment from environmental
elements.
Foundation and flooring suitable for heavy equipment.
Proper ventilation, lighting, and access control.
Installation of utility connections, including electrical, water supply, and
drainage systems.
Full design and drawing of the raw water tank with the connections.
Final site layout considering all related facilities within (attached civil work
BoQs) and above points.
o Ensure the civil works comply with local building codes and regulations.
Documents
Tender Notice