Healthcare Materials Management Services (HMMS), on behalf of St. Joseph's Health Care London (SJHCL), and in particular the Facilities Management Department, is looking to establish a partnership with a preferred Proponent, to act as a constructor, as outlined in the RFP documents, for HMMS04668 - SJHC London - PI - MB - DAYCARE FLOORING AND MILLWORK. The successful proponent will be responsible for the installation of flooring and millwork in the Daycare Center located within Parkwood Main Building. The scope of work will include, but is not limited to, the following: • Replacement of the majority of the existing flooring. • Removal and disposal of the existing VCT flooring. • Installation of luxury vinyl plank flooring, vinyl sheet good, and rubber base. Flooring materials (excluding adhesives) will be supplied by SJHC. In addition, existing millwork within the daycare centre will require replacement. The successful proponent will be responsible for the removal and disposal of existing millwork. The millwork replacement must be coordinated with the flooring installation to ensure proper sequencing and integration of the work. Some millwork units include sinks and plumbing fixtures. The successful proponent will be responsible for the supply and installation of all millwork and associated plumbing fixtures required for the project, and for coordinating the disconnection and reconnection of plumbing services as required to facilitate the millwork and flooring replacement. Th...
Solicitation Type : RFT - Request for Tender (Formal) Reference Number : 00005013618 Location : Ontario Purchase Type : Not Stated Dates Publication : 2026/04/24 11:24:00 AM EDT Closing Date : 2026/05/25 02:00:00 PM EDT Contact Information : Danielle Hebden :
[email protected] : Description : Healthcare Materials Management Services (HMMS), on behalf of St. Joseph's Health Care London (SJHCL), and in particular the Facilities Management Department, is looking to establish a partnership with a preferred Proponent, to act as a constructor, as outlined in the RFP documents, for HMMS04668 – SJHC London – PI – MB – DAYCARE FLOORING AND MILLWORK. The successful proponent will be responsible for the installation of flooring and millwork in the Daycare Center located within Parkwood Main Building. The scope of work will include, but is not limited to, the following: • Replacement of the majority of the existing flooring. • Removal and disposal of the existing VCT flooring. • Installation of luxury vinyl plank flooring, vinyl sheet good, and rubber base. Flooring materials (excluding adhesives) will be supplied by SJHC. In addition, existing millwork within the daycare centre will require replacement. The successful proponent will be responsible for the removal and disposal of existing millwork. The millwork replacement must be coordinated with the flooring installation to ensure proper sequencing and integration of the work. Some m...