Expired Tender China ICB TOT Ref. 101888779

Procurement of Ldpe/Eva Primary Compressor Tender - 101888779

Tender notice from China, published on 30 May 2024.

Executive Summary

The CHINA COAL SHAANXI ENERGY & CHEMICAL GROUP CO.,LTD. has issued a Tender notice for the procurement of a Procurement of Ldpe/Eva Primary Compressor and Hyper Compressor for China Coal Yulin Coal Deep Processing Base Project of China Coal Shaanxi Energy & Chemical Group Co., Ltd. in the China. This Tender notice was published on 30 May 2024 and is scheduled to close on 19 Jun 2024, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 101888779, while the tender notice number is 0756-244CCTC50030 and Register on the platform.

Key facts

Summary
Procurement of Ldpe/Eva Primary Compressor and Hyper Compressor for China Coal Yulin Coal Deep Processing Base Project of China Coal Shaanxi Energy & Chemical Group Co., Ltd.
TOT Ref. No.
101888779
Document Ref. No.
0756-244CCTC50030
Country
China
Notice type
Tender
Competition
ICB
Publication date
30 May 2024
Bid deadline
19 Jun 2024
EMD
Refer Document
Tender value
Refer Document
Purchaser ownership
Public
Financier
Self Financed

Purchaser details

Purchaser contact is for registered users

Login to see details

Tender details

Project Name: Procurement of LDPE/EVA Primary Compressor and Hyper Compressor for China Coal Yulin Coal Deep Processing Base Project of China Coal Shaanxi Energy & Chemical Group Co., Ltd.
Tenders are invited for Procurement of Ldpe/Eva Primary Compressor and Hyper Compressor for China Coal Yulin Coal Deep Processing Base Project of China Coal Shaanxi Energy & Chemical Group Co., Ltd. Including Compressors, Motors, Couplings, Inter-Section Heat Exchangers, Separators, Buffer Tanks, Leakage Tank Pumps and System Pipelines and Accessories, Piston Oil Systems, Cooling Flushing Oil Systems, Trolley and Hydraulic Lifting System, Condition Monitoring System, Related Electrical, Instrumentation, Start-Up Spare Parts, Special Tools, Related Technical Services and Training.
Products List:

1: 250kta Ldpe/Eva C-1201 Booster-Primary Compressor

2: 250kta Ldpe/Eva C-1202 Hyper Compressor

3: 250kta Ldpe/Eva C-1202m1 Main Motor

4: 250kta Ldpe/Eva C-1201m01main Motor

5: C-1201e1 First Stage Outlet Intermediate Cooler (Circulating Water)

6: C-1201e2a Second Stage Outlet Intermediate Cooler (Circulating Water)

7: C-1201e2b Second Stage Outlet Intermediate Cooler (Frozen Water)

8: C-1201e3a Third Stage Outlet Intermediate Cooler (Circulating Water)

9: C-1201e3b Third Stage Outlet Intermediate Cooler (Frozen Water)

10: C-1201e4 Forth Stage Outlet Intermediate Cooler

11: C-1201e5 Fifth Stage Outlet Intermediate Cooler

12: C-1201e7 Lube Oil Tank Heater

13: C-1201e6 Sixth Stage Rear Cooler

14: C-1201e10a-B Rack Oil Cooler

15: C-1201f1a-B Rack Oil Filter

16: C-1201g1 Turning Facilities

17: C-1201g2 Motor Lift Oil Unit

18: C-1201p1 Cylinder Lube System (Piping to be Prefabricated Self-Reinforcing Trial-Assembly after Delivery)

19: C-1201p2a/B Rack Oil Pump

20: C-1201p8-P9 Low Pressure Leak Gas Pump

21: C-1201d1 Second Stage Inlet Separator

22: C-1201d2 Third Stage Inlet Separator

23: C-1201d03 Forth Stage Inlet Separator

24: C-1201d4 Fifth Stage Inlet Separator

25: C-1201d5 Sixth Stage Inlet Separator

26: C-1201d6 Rack Lubricating Oil Tank and Rack Lubricating Oil Skid Assembly

27: C-1201d08 High Pressure Leak Gas Collector (First Stage Packing)

28: C-1201d09 Low Pressure Leak Gas Collector (Secondary Packing)

29: C-1201d10 Cylinder Lubrication Tank and Skid Assembly

30: C-1201d11 First Stage Inlet Pulse Buffer Tank

31: C-1201d12 First Stage Outlet Pulse Buffer Tank

32: C-1201d21 Second Stage Inlet Pulse Buffer Tank

33: C-1201d22 Second Stage Outlet Pulse Buffer Tank

34: C-1201d31 Third Stage Inlet Pulse Buffer Tank

35: C-1201d32 Third Stage Outlet Pulse Buffer Tank

36: C-1201d41 Fourth Stage Inlet Pulse Buffer Tank

37: C-120142 Fourth Stage Outlet Pulse Buffer Tank

38: C-1201d51 Fifth Stage Inlet Pulse Buffer Tank

39: C-1201d52 Fifth Stage Outlet Pulse Buffer Tank

40: C-1201d61 Sixth Stage Inlet Pulse Buffer Tank

41: C-1201d62 Sixth Stage Outlet Pulse Buffer Tank

42: Process Piping and Accessories from Inlet to Outlet (Bracket, Safety Valve, Bursting Disc Valve, Filter, Sight Glass, Etc.)

43: the Pipes between the Main Engine and each Unit (See the Bidding Documents for the Interface Division)

44: Instrument Control System, Control Disc/Operation Disc, Instrument Control Valve, Vibration Switch and Other Instrument Control and Status Monitoring, Interlocking Control System Equipment

45: Electrical Control System, Equipment System Supporting the Oil Pump Motor, Junction Box and Emergency Stop Button and Other Electrical Equipment

46: C-1202g1 Turning Facilities

47: C-1202g2 Motor Lift Oil Unit

48: C-1202p1 Cylinder Lube Unit (Piping to be Prefabricated after Completion of Self-Reinforcement, Try-And-Disassemble after Delivery)

49: C-1202d1 Cylinder Lube Tank Skid Mounted

50: C-1202e1 Running Mechanism Lubricating Oil Double Oil Cooler

51: C-1202f1a-B Running Mechanism Lubricating Oil Double Filter

52: C-1202p2a-B Operating Mechanism Lubricating Oil Pump and Pipeline

53: C-1202d2 Operating Mechanism Lubricating Oil Tank Skid Mounted

54: C-1202e2 Cooling Oil Dual Oil Cooler

55: C-1202f2a-B Cooling Oil Dual Filter

56: C-1202p3a-B Cooling Oil Pump and Pipeline (Connecting the Compressor Body Pipeline should be Prefabricated Good Trial-Assembly Disassembly after Delivery

57: C-1202d3 Cooling Oil Tanks and Skid Mounting

58: Instrument Control System: Control Disc/Operation Disc, Instrument Control Valve, Vibration Switch and Other Instrument Control and Status Monitoring, Interlocking Control System Equipment

59: Electrical Control System: Equipment System Supporting the Oil Pump Motor, Junction Box and Emergency Stop Button and Other Electrical Equipment
Place of Implementation: Yulin, Shaanxi, China
Beginning of Selling Bidding Documents: 2024-05-29
Ending of Selling Bidding Documents: 2024-06-07
Price of Bidding Documents: ¥200/$27.59
Deadline for Submitting Bids/Time of Bid Opening (Beijing Time): 2024-06-19 09:30

Documents

Tender Notice
Login to view

China Public Procurement Intelligence

Frequently asked questions

The bid deadline for Procurement of Ldpe/Eva Primary Compressor and Hyper Compressor for China Coal Yulin Coal Deep Processing Base Project of China Coal Shaanxi Energy & Chemical Group Co., Ltd. was 19 Jun 2024. Bidding is closed.

This tender has been issued by CHINA COAL SHAANXI ENERGY & CHEMICAL GROUP CO.,LTD. in China.

The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.

This tender is Self Financed

The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.

The TendersOnTime reference is 101888779. The purchaser document reference is 0756-244CCTC50030.

Browse other tenders from China or search by relevant keywords and CPV classification.