Preparation of Project Documentation (Basic Design Tender - 17637208
Tender notice from Serbia, published on 26 Oct 2017.
Executive Summary
The NAFTNA INDUSTRIJA SRBIJE has issued a Tender notice for the procurement of a Preparation of Project Documentation (Basic Design Package & Local Authority Documentation in the Serbia. This Tender notice was published on 26 Oct 2017 and is scheduled to close on 28 Oct 2017, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 17637208, while the tender notice number is and Register on the platform.
Key facts
Summary
Preparation of Project Documentation (Basic Design Package & Local Authority Documentation
Tenders are invited for Preparation of Project Documentation (Basic Design Package & Local Authority Documentation. NIS - Pančevo Oil Refinery (RNP) was put on stream in 1968. RNP, with the installed primary capacity of 4.8 million tons/year, is the most important facility of this kind in Serbia. RNP is the main producer of oil derivatives at the domestic market. About Project The aim of the project is to provide reliable operation of the CDU S-2100 unit by reconstruction of three subsystems:
- Reconstruction of top section of Atmospheric Tower DA-2101,
- Reconstruction of Desalter Section and installation of additional desalting stage,
- Automatic Corrosion Monitoring & Control System implementation. Final goal is to achieve desalting efficiency of min.98% and provide continuous corrosion monitoring and controlling system. 1.2 DEFINITIONS Client Means NIS a.d. Novi Sad, Refining Block
Project Reconstruction of corrosion prevention system on S-2100
Bidder Company that participates in the process of submitting bids for subject project
Contractor Means successful Bidder
Sub-contractor A domestic or foreign legal entity with which the present tender BIDDER joint appearances and has signed a contract for mutual business cooperation
Effective date Shall mean the date of signing Letter of intent or Contract
Kick of Meeting Introductory meeting
Plant All systems defined in Paragraph 2.1
Vendor Equipment supplier. 1.3 ABBREVIATIONS AG Aboveground
AOC Accidentally Oil Contaminated
CDU Crude Distillation Unit
BDP Basic Design Package
BEDD Basic Engineering Design Data
B.L. Battery Limit
BFD Block Flow Diagram
DCS Distributed Control System
DDP Detail Design Package
EIA Environmental Impact Assessment
FAT Factory Acceptance Test
FDS Fire Detection System
FFS Fire Fighting System
GDS Gas Detection System
HAZID Hazard Identification Study
HAZOP Hazard and Operability Study
HSE Health, Safety and Environmental
ITB Invitation to Bid
KOM Kick-off Meeting
LAD Local Authority Documentation
LS Light slop
LLI Long lead item
MCC Motor Control Center
MOM Minutes of Meeting
MPR Monthly Progress Report
MSP Microsoft Project
NIS Serbian Oil industry
P&ID Piping and Instrument Diagram
PA Plant Air
PCC Power Control Cubicle
PFD Process Flow Diagram
PGA Piping General Arrangement
PK Pump house
PLC Programmable Logistic Controller
PTD Project-technical documentation
PMC Project Management Consultancy
RNP Pancevo Oil Refinery
RS Republic of Serbia
SAT Site Acceptance Test
SL Low Pressure Steam
SS Stainless Steel
STU Slop Treatment Unit
SWS Sour Water Stripper
SOW Scope of Work
TIC Total Investment Cost
TCF Temporary Construction Facilities
TP Tie-in point
TS Transformer substation
HS Heavy slop
TP Tie-in point
UDD Utility Distribution Diagram
UFD Utility Flow Diagram 2. SCOPE OF WORK SCOPE OF PLANT defined in paragraph 2.1 and SCOPE OF SERVICES defined in paragraph 2.2 defined togheter Contractor-s SCOPE OF WORK. 2.1 SCOPE OF PLANT The Contractor SCOPE OF PLANT includes following process systems:
- Reconstruction of top section of Atmospheric Tower DA-2101,
- Reconstruction of Desalter Section and installation of additional desalting stage,
- Automatic Corrosion Monitoring & Control System implementation. The Contractor SCOPE OF PLANT also includes following systems necessary for start-up, operation and maintenance of defined process systems:
- Crude Oil Supply System (from storage tanks to DA-2101),
- Water System,
- Electrical Supply System,
- DCS/ESD extension,
- All utility systems (steam, water, instrument and process air, nitrogen etc.)
- Closed drained systems,
- AOC & Atmospheric Sewage System,
- Flare system (additional PSV),
- FDS, GDS, FFS extensions
- All other systems necessary for start-up, operation and maintenance. 2.2 SCOPE OF SERVICES Contractor shall carry out following SCOPE OF SERVICES for SCOPE OF PLANT defined in paragraph 2.1: The scope of work related to this ITB is following:
- Project management (Point 2.2.1.)
- Site Survey and Data Collection (Point 2.2.2.)
- Engineering services (Point 2.2.3.)
- Final documentation issue (Point 2.2.4.). Contractor shall follow technical requirements defined in this ITB. 2.2.1 Project management 2.2.1.1 Communication & coordination The Contractor will be responsible for comunication and coordination with Client, Sub-contractor for LAD, potential LLI and critical equipment vendors. All documents will be clearly labeled with a descriptive title, and the date of issue. All letter, fax, e-mail correspondence will have a single subject and pertain only to that subject. Title of correspondence:
All outgoing correspondence from Client shall be identified for reference purposes as follows:
Subject: RNP Reconstruction of corrosion prevention system on S-2100 Communications codes:
Contact addresses, phone/fax №, etc. will be defined on the KOM. 2.2.1.2 Project Numbering Practice Client will provide Project Numbering Practice which will be used for marking of technical documentation, fluids, equipment, pipelines & infrastructure. Project Numbering Practice will be handover to Contractor at KOM. In case that some marking of documentation, fluids, equipment, pipelines & infrastructure for this project is missing in Project Numbering Practice new marking will be determined by Client on Contractor request. In case of deviation from the above rules, Client has the right to demand corrections in documentation in accordance with Project Numbering Practice. During the execution of SCOPE OF WORK the Contractor shall follow the Client list of applicable standards. List shall be handover to Contractor on KOM. 2.2.1.3 Project Execution & Quality Plans It is absolutely required that the Contractor is certified to a quality system according to ISO 9001. The valid quality system certificate has to be given in English language. One week after Contract signing Contractor shall forward a detailed questionnaire to RNP to be used at the KOM. Contractor will develop Project Execution/Quality Plans for RNP-s comments and approval. After these documents are approved it is Contractor-s obligation to follow them during Project execution. Contractor will, among others, specify in the plans various technical reviews to be attended by RNP before proceeding with the construction works. The minimum reviews shall be as follows:
- Plot Plan review,
- Battery Limits Conditions review,
- P&ID review - HAZID review - HAZOP review - Final BDP review, - Detailed Inquiry Requisitions review, - Detailed ITB documentation review. Contractor will enclose in the bid Project Time Schedule for project realization which will be the basis for Project monitoring and reporting once the project is initiated and Contract is signed. Project Time Schedule must include necessary time for obtaining permits for construction works which are the Client obligation. During designing period coordination meetings will be organized on weekly basis. Internal technical control:
Complete project documentation that will be made pursuant to this ITB must be submitted to the Client on internal technical control.
· Internal technical control of the project documentation will be based on the quality and level of readiness (deadlines) and compliance with applicable regulations, standards and laws. It is carried out during the preparation of technical documentation and on completion. An internal technical control will be performed by the Project team memebers from Process department and Project manager / coordinators of the project, supervision and appropriate professional services in Oil Refinery Pancevo.
· Contractor is obliged to act according to technicaly justified remarks of internal technical control.
· Contractor is obliged to organize a presentation when submitting technical documentation if the same is requested by the Client. 2.2.1.4 Project Reporting Contractor shall report the Project status (progress, quality, areas of concern, etc.) on monthly basis to RNP during the project realization. The MPR will include the following information as minimum:
- Executive Summary,
- Detail written reports of Engineering (per disciplines
The bid deadline for Preparation of Project Documentation (Basic Design Package & Local Authority Documentation was 28 Oct 2017. Bidding is closed.
This tender has been issued by NAFTNA INDUSTRIJA SRBIJE in Serbia.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 71320000 - Engineering design services.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 17637208. The purchaser document reference is not provided in the notice.