Cross Icon
Cross Icon

Preliminary Market Consultation for a 30 Mw Procurement Plan/GPN/PIN - 142910291

The LANDSVIRKJUN has issued a Procurement Plan/GPN/PIN notice for the procurement of a Preliminary Market Consultation for a 30 Mw Battery Energy Storage System (Bess) in Iceland in the Iceland. This Procurement Plan/GPN/PIN notice was published on 09 Jun 2026 and is scheduled to close on 24 Jul 2026, with an estimated Procurement Plan/GPN/PIN value of Refer Document. Interested bidders can access detailed Procurement Plan/GPN/PIN information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 142910291, while the tender notice number is 394547-2026 and Registering on the platform.

Expired Tender

Procurement Summary

Country: Iceland

Summary: Preliminary Market Consultation for a 30 Mw Battery Energy Storage System (Bess) in Iceland

Deadline: 24 Jul 2026

Posting Date: 09 Jun 2026

Other Information

Notice Type: Procurement Plan/GPN/PIN

TOT Ref.No.: 142910291

Document Ref. No.: 394547-2026

Competition: ICB

Financier: Self Financed

Purchaser Ownership: Public

Tender Value: Refer Document

CPV Classification

42131000 - Taps, cocks and valves
42112100 - Steam turbines
42113100 - Parts of steam turbines
42131140 - Pressure-reducing, control, check or safety valves
42131142 - Control valves
42131144 - Process-control valves
42131240 - Globe valves
42131250 - Needle valves
42131260 - Ball valves
42131270 - Plug valves
42131280 - Butterfly valves
42132100 - Valve actuators

Purchaser's Detail

Name: Login to see tender_details

Address: Login to see tender_details

Email: Login to see tender_details

Login to see details

Tender Details

Steam Control Valves - Preliminary Market Consultation
Landsvirkjun would like to invite you to take part in our Preliminary Market Consultation for steam control valves that will be located in the T/G Unit valve room and form the HP separator pressure control and bypass arrangement, as indicated on P&ID drawing THT-P-LBK-T0-0515. Their primary function is to reduce the pressure of high-pressure steam that is not routed through the T/G Unit, from 27 bara to 9.3 bara, before the steam enters the existing medium-pressure system. The HP steam separator is designed for a maximum steam flow of 176 kg/s, which represents the maximum steam flow expected to be handled through the steam control valves. The T/G Unit is designed for flexible operation and variable load conditions, where the steam flow through the turbine may change depending on available steam, operating mode, start-up, shutdown, load changes and maintenance requirements. The steam control valves shall therefore be suitable for operation across a wide flow range and shall be capable of supporting stable pressure reduction from the HP steam system to the MP steam system during both partial bypass and full bypass operation. Special attention shall be given to the risk of H₂S-induced embrittlement and sulphide stress cracking, as well as the potential for SiO₂ scaling in high-temperature geothermal service. Vendors shall seek to minimize wear of valve components and noise emissions and shall avoid the use of plates or ...
Document Type: Prior Information Notice

Contract Type: supplies

Authority Type: body-pl

Doc Title: Preliminary Market Consultation for a 30 MW battery energy storage system (BESS) in Iceland

Dispatch Date: 2026-06-05

Publish Date: 2026-06-09

Submission Date: 2026-07-24

Documents

 Tender Notice


Similar Tenders

Request Demo
GiZ Tenders India

Procurement Documents for Iceland

Access a comprehensive library of standard procurement documents specific to Iceland. Here, you'll find all the essential forms, guidelines, and templates required for tender applications and submissions in Iceland

Explore Procurement Documents for Iceland


Want To Bid in This Tender?

Get Local Agent Support in Iceland and 60 More Countries.

View All The Services


View Tenders By


Publish Tenders


Have Any Dispute With The Purchaser?