Procurement Summary
Country: Iceland
Summary: Preliminary Market Consultation for a 30 Mw Battery Energy Storage System (Bess) in Iceland
Deadline: 24 Jul 2026
Posting Date: 09 Jun 2026
Other Information
Notice Type: Procurement Plan/GPN/PIN
TOT Ref.No.: 142910291
Document Ref. No.: 394547-2026
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
42131000 - Taps, cocks and valves
42112100 - Steam turbines
42113100 - Parts of steam turbines
42131140 - Pressure-reducing, control, check or safety valves
42131142 - Control valves
42131144 - Process-control valves
42131240 - Globe valves
42131250 - Needle valves
42131260 - Ball valves
42131270 - Plug valves
42131280 - Butterfly valves
42132100 - Valve actuators
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Steam Control Valves - Preliminary Market Consultation
Landsvirkjun would like to invite you to take part in our Preliminary Market Consultation for steam control valves that will be located in the T/G Unit valve room and form the HP separator pressure control and bypass arrangement, as indicated on P&ID drawing THT-P-LBK-T0-0515. Their primary function is to reduce the pressure of high-pressure steam that is not routed through the T/G Unit, from 27 bara to 9.3 bara, before the steam enters the existing medium-pressure system. The HP steam separator is designed for a maximum steam flow of 176 kg/s, which represents the maximum steam flow expected to be handled through the steam control valves. The T/G Unit is designed for flexible operation and variable load conditions, where the steam flow through the turbine may change depending on available steam, operating mode, start-up, shutdown, load changes and maintenance requirements. The steam control valves shall therefore be suitable for operation across a wide flow range and shall be capable of supporting stable pressure reduction from the HP steam system to the MP steam system during both partial bypass and full bypass operation. Special attention shall be given to the risk of H₂S-induced embrittlement and sulphide stress cracking, as well as the potential for SiO₂ scaling in high-temperature geothermal service. Vendors shall seek to minimize wear of valve components and noise emissions and shall avoid the use of plates or ...
Document Type: Prior Information Notice
Contract Type: supplies
Authority Type: body-pl
Doc Title: Preliminary Market Consultation for a 30 MW battery energy storage system (BESS) in Iceland
Dispatch Date: 2026-06-05
Publish Date: 2026-06-09
Submission Date: 2026-07-24
Documents
Tender Notice