Procurement Summary
Country: Ukraine
Summary: Pothole Repair of Asphalt Pavement in the City of Dnipro
Deadline: 09 Jul 2026
Posting Date: 04 Jul 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 144573382
Document Ref. No.: UA-2026-07-02-105914788
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
45233142 - Road-repair works
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Technical task for the performance of works on pothole repair of asphalt pavement: 1. General information Object: Building territory and shopping center parking lot. Object address: Terra shopping center, Dnipropetrovsk, st. Panikahi, building 15 Purpose of works: Elimination of potholes, pits and cracks for the safety of customers.2. Composition and scope of work Total area of repair: ~400 m² (site inspection is required for accurate calculation) Site inspection: Determining and marking the boundaries of the damaged pavement. Milling: Cutting out the damaged asphalt (mapping) deep from 4 to 10 cm. Cleaning: Removal of dust, dirt and remnants of old asphalt from the formed pits. Processing: Pouring the bottom and edges of the maps with liquid bitumen emulsion. Laying: Pouring hot fine-grained asphalt concrete mixture. it is necessary to arrange a road unevenness (recumbent policeman) to prevent water from entering the territory. Sealing: Rolling asphalt with a road roller or vibratory plate to the level with the existing surface. Sealing: Treatment of seams and joints with bitumen. 3. Technical requirements for materials and works Materials: Hot asphalt (type B or G, fine-grained), bitumen emulsion. Quality: All materials must have certificates of conformity. Evenness: The new coating must not have subsidence or protrusions (allowed deviation up to 5 mm).Drainage: The repair should not disturb the flow of rainwater to the storm grates.4. Requirements for the organization of work Schedule: Execution of work in the evening, night or morning (to avoid traffic jams in the parking lot) by a responsible person. Safety: Installation of fences, signal tapes and temporary signs. Cleanliness: Daily removal of construction debris and cleaning of the area after renovation. 5. Warranty obligations Warranty period: At least 12 months from the date of signing act of completed works. Elimination of defects: The executor is obliged to repair the destruction at his own expense wit...
Submission of proposals lasts until: 03-07-2026, 14:04 to 09-07-2026, 20:30
Documents
Tender Notice