Expired Tender Canada ICB TOT Ref. 146095735

PCS25020 - Buffalo Pound Provincial Park Watermain Tender - 146095735

Tender notice from Canada, published on 28 Jul 2026.

Executive Summary

The SASKBUILDS AND PROCUREMENT has issued a Tender notice for the procurement of a PCS25020 - Buffalo Pound Provincial Park Watermain Replacement in the Canada. This Tender notice was published on 28 Jul 2026 and is scheduled to close on 18 Aug 2026, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 146095735, while the tender notice number is 346-2026 and Register on the platform.

Key facts

Summary
PCS25020 - Buffalo Pound Provincial Park Watermain Replacement
TOT Ref. No.
146095735
Document Ref. No.
346-2026
Country
Canada
Notice type
Tender
Competition
ICB
Publication date
28 Jul 2026
Bid deadline
18 Aug 2026
EMD
Refer Document
Tender value
Refer Document
Purchaser ownership
Public
Financier
Self Financed

Purchaser details

Purchaser contact is for registered users

Login to see details

Tender details

PCS25020 - Buffalo Pound Provincial Park Watermain Replacement Project Scope: The Work consists of the supply and installation of approximately 7.5 km of 200 mm diameter DR11 HDPE potable water main by Horizontal Directional Drilling (HDD) to replace the existing asbestos cement (AC) water main. The Work includes all associated appurtenances, including isolation valves, air release and combination air valve (CAV) chambers, pressure reducing valve (PRV) chambers, drains, fittings, joint restraints, and water service connections. The Work also includes all required site preparation activities, including clearing, grubbing, stripping, and stockpiling of materials; drilling, excavation, shoring, backfilling, and restoration; control of surface water and groundwater, including dewatering and disposal of water encountered during excavation, HDD installation, and testing; utility locating and daylighting as required; and connection to the existing water distribution system at the Buffalo Pound Water Treatment Plant, including coordination of planned shutdowns and completion of all tie-in connections. In addition, the Work includes hydrostatic pressure and leakage testing, disinfection, flushing, commissioning of the new water main, and testing of all materials incorporated into the Work. The Contractor shall also complete all site cleanup and restoration upon completion of construction and correct any deficiencies identified during the warranty period. All work is to completed by Ma...
PCS25020 - Buffalo Pound Provincial Park Watermain Replacement Project Scope: The Work consists of the supply and installation of approximately 7.5 km of 200 mm diameter DR11 HDPE potable water main by Horizontal Directional Drilling (HDD) to replace the existing asbestos cement (AC) water main. The Work includes all associated appurtenances, including isolation valves, air release and combination air valve (CAV) chambers, pressure reducing valve (PRV) chambers, drains, fittings, joint restraints, and water service connections. The Work also includes all required site preparation activities, including clearing, grubbing, stripping, and stockpiling of materials; drilling, excavation, shoring, backfilling, and restoration; control of surface water and groundwater, including dewatering and disposal of water encountered during excavation, HDD installation, and testing; utility locating and daylighting as required; and connection to the existing water distribution system at the Buffalo Pound Water Treatment Plant, including coordination of planned shutdowns and completion of all tie-in connections. In addition, the Work includes hydrostatic pressure and leakage testing, disinfection, flushing, commissioning of the new water main, and testing of all materials incorporated into the Work. The Contractor shall also complete all site cleanup and restoration upon completion of construction and correct any deficiencies identified during the warranty period. All work is to completed by Ma...

Documents

Tender Notice
Login to view

Canada Public Procurement Intelligence

Frequently asked questions

The bid deadline for PCS25020 - Buffalo Pound Provincial Park Watermain Replacement was 18 Aug 2026. Bidding is closed.

This tender has been issued by SASKBUILDS AND PROCUREMENT in Canada.

The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.

This tender is Self Financed

The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.

The TendersOnTime reference is 146095735. The purchaser document reference is 346-2026.

Browse other tenders from Canada or search by relevant keywords and CPV classification.