Operation and Operation of Rain Sewage Separators, Replacement of Absorbent Pillows,... Tender

PORT OF GDYNIA AUTHORITY S.A. has floated a tender for Operation and Operation of Rain Sewage Separators, Replacement of Absorbent Pillows, Cleaning and Monitoring of Sewage Sewage Systems and Linear Drainages in the Port of Gdynia. The project location is Poland and the tender is closing on 18 Apr 2024. The tender notice number is 153611-2024, while the TOT Ref Number is 98712741. Bidders can have further information about the Tender and can request the complete Tender document by Registering on the site.

Expired Tender

Procurement Summary

Country : Poland

Summary : Operation and Operation of Rain Sewage Separators, Replacement of Absorbent Pillows, Cleaning and Monitoring of Sewage Sewage Systems and Linear Drainages in the Port of Gdynia

Deadline : 18 Apr 2024

Other Information

Notice Type : Tender

TOT Ref.No.: 98712741

Document Ref. No. : 153611-2024

Competition : ICB

Financier : Self Financed

Purchaser Ownership : Public

Tender Value : Refer Document

Purchaser's Detail

Purchaser : PORT OF GDYNIA AUTHORITY S.A.
Address: Procurement Department
Town: Gdynia
NUTS-Code: PL633
Postal Code: 81-337
Attn: Procurement Department
Phone: 48586274676
Poland
Email :j.policht@port.gdynia.pl
URL :https://www.port.gdynia.pl/

Tender Details

1. the subject of the order is a service consisting in the service and operation of separators in the storm sewage system, replacement of sorbent pads, cleaning and monitoring of sewerage channels and linear drainages in the Port of Gdynia.

2. Service and operation of settling tanks and separators (including wastelysis of extracted waste) in the storm sewage system and replacement of sorbent pads.

3. Monitoring and cleaning of rainwater and sanitary sewage channels along with connections to rainwater inlets and disposal of waste from inlets and inspection wells.

4. Cleaning of rope drains and open troughsart and waste disposal.

5. Ongoing repairs of possible damage in settling tanks and separators.

6. General characteristics of the subject of the order:

Length of rainwater sewage system - approx. 64 km in diameters from DN 150 to DN600

Length of sanitary sewage system - approx. 33 km in averageices from DN 150 to DN400

Number of pre-treatment devices - 80 pieces

Length of linear drainage - approx. 11 km, hydraulic width: 100 to 300 mm

7. The contractor is obliged to have the right to generate waste in the Port of Gdynia by having a registration number orafrom the appropriate entry in Section XII of the BDO. The contractor should provide PGA S.A. with information about the fulfillment of this condition. within 7 (seven) days before the start of work. In the case of waste management on its own, the Contractor will be obliged to provide a copy of the authorizing decisions...
Document Type: Contract Notice
Reference Number: ZU/227/SWZ-58/JP/2023
Contract Type: services
Authority Type: body-pl
Doc Title: OPERATION AND OPERATION OF STORM SEWAGE SEPARATORS, REPLACEMENT OF ABSORBENT PILLOWS, CLEANING AND MONITORING OF SEWAGE CANALS AND LINEAR DRAINAGES IN THE AREANIE PORTU GDYNIA
Dispatch Date: 2024-03-12
Publish Date: 2024-03-13
Submission Date: 2024-04-18

Documents

 Tender Notice