Expired Tender Poland ICB TOT Ref. 6053857

Onshore and offshore services Tender in Poland - 6053857

Tender notice from Poland, published on 12 Apr 2016.

Executive Summary

The Dyrektor UrzAe has issued a Tender notice for the procurement of a Onshore and offshore services in the Poland. This Tender notice was published on 12 Apr 2016 and is scheduled to close on 19 May 2016, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 6053857, while the tender notice number is 124499-2016 and Register on the platform.

Key facts

Summary
Onshore and offshore services
TOT Ref. No.
6053857
Document Ref. No.
124499-2016
Country
Poland
Notice type
Tender
Competition
ICB
Publication date
12 Apr 2016
Bid deadline
19 May 2016
EMD
Refer Document
Tender value
Refer Document
Purchaser ownership
-
Financier
Self Financed

CPV classification

Purchaser details

Purchaser contact is for registered users

Login to see details

Tender details

Object of the contract

Execution of artificial recharge shore in Mrzeżyno: km: 351.60 / 352, 201. General information: 1.2. Scheduled to extract and set aside the amount of material: 60 000 mi?1/21.3. The length of the planned section of the beach to power: 600 m2. Scope of work: 2.1. Dredging works: Material sandy beach needed to power will come from the middle of pre-emptive No. I located at a distance ofk. 8 km from the place rozładunku.Obszar Mrzeżyno INajbardziej the right to collect sand in the area of accumulations of sand undersea power to the edge of the box pre-emptive and in the area of Mrzeżyno, located approximately 6.15 kilometers min to max 8.5 kilometers from the place of supply . Water depth in this area ranges from 9 to 12 m. As a result of the collection of deposits to 2-ch wcześniejszych artificial power supply coastal locally may be at greater głębokości.Tabela 1. coordinates of Mrzeżyno IObszar IPowierzchnia 3, 156, 115 m2nr XY Fi La1 711540 260177 541242.6724 '151914.6929' 2 710, 759 260, 056 541217.2436 '151910.2709' 3 710, 204 260, 332 541159.7827 "151927.0702" 4 710, 495 260, 756 541209.8946 "151949.5938 "5 710246 261350 541202.8489" 152023.0305 "6 710425 262981 541211.3546 "152152.3763" 7 711233 262748 541237.0648 "152137.2424" 8 711552 262080 541246.2534 "152059.5237" Piasek należy pobierać tylko w wyżej określonym obszarze eksploatacyjnym, czerpiąc ze złoża tylko do głębokości liczonej od dna morskiego: nie przekraczającej 2 m.Materiał piaszczysty z wyznaczonego obszaru powinien być pobierany pogłębiarką ssąco-refulującą. You should lead a rational sands mining for power and control of the coastline wydobycia.Gwarancją efficient mining of the deposit is dredging equipment in the appropriate satellite navigation system allows you to position dredger with high precision and control bathymetric measurements operated on the dredging area złoża.Pracesea require milder weather conditions than those conducted within the port. In his work schedule, the Contractor should take into account the short and long-term weather forecasts, the best of several źrodeł.Podstawowymi rules governing the movement of dredger in the area of Mrzeżyno and the place will spoil morskie.3 rules. The shape and location of the proposed letterypu3.1. Determined on the basis of the results parameter forms the coastal zone in terms of their quality / resistance factors hydrodynamic parameters of the artificial beach will be: the width of the beach 50 m, height of the beach at the foot of the dunes of 2.5 m above sea level slope 1:20. Such slope of the beach is similar to the natural creating less prone to sizeywanie.3.2. The underwater part of the slope 1:40 designs allow omitting coefficient spływu.3.3. Design coastline aligns existing index, you can not create sharp bends and should go gently into contact with the natural beach. Embankment should completely cover the elements of the lining blocks Kardzis and gwiazdoblokow to the elevation of 2.5 mi?1/2n.p.m.3.4. Basic lines define the shape and position of the embankment artificial recharge, ie. Izohipsę 0.0 m on the power and the lower and upper slopes odmorskiej beach shown on the map (Figure 1). The cross-sections of 50 m proposed embankment shown in fig. 2 to 14.3.5. At the ends of the powered section to the east of 351.60 km and 352.20 km West ofi?1/2adjust the slope of artificial beach to beach natural inclination. Provided about 30 m sections of the end nasypu.3.6. In the table 20 for the different cross-sections are the basic parameters of the embankment artificial recharge and given coordinates of points belonging to the basic lines defining the shape and position of the embankment (Fig. 1) .3.7. Table 21 podano of cross sectional areas of the embankment, the mutual distances of cross-sectional and the resulting volume of the individual sections, and the total volume of the proposed embankment artificial recharge on the section from km 351.60 to km 352, 20.3.8. Point coordinates are given in WGS84 UTM33, height and depth are given in the reference system: PL-KRON86-NH.3.9. Appendix 9i?1/2the ToR includes Site Plan and sections poprzeczne.4. Place spoil: 4.1. Applications of the technology can not cause damage and bridge the infrastructure located at the waist technicznym.4.2. Power supply should be an "open", ie. The dikes hindering refulatu flow into the sea should be a break, not to limit excessive outflow of sandi?1/2to przybrzeża.4.3. By joining the beach nourishments should take into account the current state of the shore, which until the start of the work can be zmianie.4.4. In the course of spoil excavated on the beach the contractor is obliged to arm :: area of work in the pipeline with fittings, : kept in the course of work appropriate team serving with the right equipment to ensure constant, :the efficiency of the technical operation of equipment, avoid infringement of the balance of the upstream slope dunes, : secure the area the beach, who are made robots from accessing people trzecich.5. Detailed elaboration pn. "Guidelines for artificial recharge shore Mrzezyno km: 351.60: 352.20 is held by the Employer (for inspection).
Description: Onshore and offshore services
Authority Type: Other

Contact Nature: Services

Procedure: Open procedure

Document: Contract notice

Regulation: European Union

Award criteria: The most economic tender

CPV code: 76500000

CPV Description: Onshore and offshore services.  
Internet address (URL): www.ums.gov.pl

Directive: Classical Directive (2004/18/EC)

Documents

Tender Notice
Login to view

Similar tenders

Poland Public Procurement Intelligence

Frequently asked questions

The bid deadline for Onshore and offshore services was 19 May 2016. Bidding is closed.

This tender has been issued by Dyrektor UrzAe in Poland.

The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.

This tender is Self Financed

The tender is classified under the following CPV code(s): 76500000 - Onshore and offshore services.

The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.

The TendersOnTime reference is 6053857. The purchaser document reference is 124499-2016.

See the Similar Tenders section on this page or browse other tenders from Poland.

This tender falls under Power and Energy in Poland. Suppliers in these sectors can track similar Poland tenders using CPV-based alerts.