Expired Tender Poland ICB TOT Ref. 5756338

Office block construction work Tender in Poland - 5756338

Tender notice from Poland, published on 17 Mar 2016.

Executive Summary

The Transportowy Dozor Techniczny has issued a Tender notice for the procurement of a Office block construction work in the Poland. This Tender notice was published on 17 Mar 2016 and is scheduled to close on 15 Apr 2016, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 5756338, while the tender notice number is 090000-2016 and Register on the platform.

Key facts

Summary
Office block construction work
TOT Ref. No.
5756338
Document Ref. No.
090000-2016
Country
Poland
Notice type
Tender
Competition
ICB
Publication date
17 Mar 2016
Bid deadline
15 Apr 2016
EMD
Refer Document
Tender value
Refer Document
Purchaser ownership
-
Financier
Self Financed

CPV classification

Purchaser details

Purchaser contact is for registered users

Login to see details

Tender details

Object of the contract

The contract is for the execution of works within the task pn.:"Budowa of the building which established the Transport Technical Inspection along with land development and driveways and technical infrastructure ".Kategoria object XVI and XVII.Opis of the investment: The investment will be made on the basis of a final decision authorization for the budohoses No. 375 / Mok / 2013 of 13/12/2013 issued by the Mayor of the City of Warszawy.Projektowany building intended to accommodate the Transport Technical Supervision in Warsaw will be located in the area between the streets of the southern railway station: Puławska and Bukowińska cadastral plot No. 19/2 and 68/3 from within 1-02-26 owned Zamawiającego.Budynek willserved as office space, it will be equipped with meeting rooms, restaurant, accommodation facilities and two-level parking garage podziemny.Parametry technical and BudynkuPowierzchnia Land plot: approx. 4598 m2 Building area: approx. 1, 814 m2, Total area: approx. 23, 674.00 m2 area parking, sidewalks, driveways: approx. 1095 m22, surface biologically activei?1/2: Approx. 922 m2 floor area of approx. 15, 240.20 m2, including ground part: approx. 10, 166.90 m2 and the underground part: approx. 5, 073.37 m2, building volume: approx. 90, 885 mi?1/2.Ilość stories: 21 including 2 underground and 19 above-ground out of which 3 kond. techniczne.Wysokość building: approx. 54.62 m, length of the building: approx. 87.19 m, width of the building: approx. 18.21 m in the lower part and 22.67 mi?1/2wyższej.1 parts. General technical data and branżoweA. ArchitekturaBudynek constituting the seat of Transportation Technical Supervision focuses on three main functional parts. They can operate independently or complement other .: Part of the Conference, located on level 01, as a complement to office function, designed to conduct: meetings of the Confeerence, training, exams, and to organize external meeting rooms .: The office, located on floors 02-06, suitable for employees of Transportation Technical Supervision. The arrangement of this section, the amount of office rooms, offices and auxiliary rooms has been adapted to the organizational structure Investor .: Part of residencei?1/2collective, located on floors 07-15, it is designed to accommodate workers of Transportation Technical Supervision or guests who are participants of the above mentioned courses, meeting rooms and other imprez.Poza three main functional parts of the building are also complementary functions like catering and usługowa.Połącommunication connection in the building were designed in a way that allows collision-free use of each part. In addition, due to the functional connections between parts has been designed access control system. The whole communication is based on three main trzonach.W building is designed two-storey underground garage. Exit to the garageu done by two-way ramp access ramp through the entrance from the street Bukowińska. At both levels, the garage was designed 121 seats postojowych.Na 00 storeys (ground floor) is designed restaurację.Na level -1 in the north-eastern part of the building was designed kitchen, which supports: the restaurant room on level 00 (ground floor), halli?1/2club on level -1 and a banquet hall on level 01 in the conference part of the building. Access to the garbage bin is provided by crane and cargo-passenger accessible from the garage through the vestibule pożarowy.Przestrzeń conference is on floor 01. From the extracted the following areas: Foyer conference rooms Conference, banquet hall, teams sanitarne.Do operation and management of systems of fire protection and building security is provided security room BMS.Na ground storeys int he molars have been designed following technical areas and economic: The room electrical switchboard storey, room teletechniHand with a local distribution point, room cleaning service sprzątającego.Na provided for the purposes of operating the telecommunication building has been designed room serwerowni.Na level -1 and -2 were designed following technical areas: ventilation, gasoline separator, LV switchgear, UPS central water pumping station to the sprinkler systemu sprinkler fog, separator fats, Water tank hydrant with pumping station, reservoir water retention, room for storage trolley cleaning, Comoros Transformer, Switchboard SN, water connection, substation, room power generator connector, telecommunication, Engine hydraulic crane ZW-05, roomi?1/2designed to hold the stroller sprzątającego.Na floors 16-18 are designed open space dedicated to the installation of ventilation and closed chilled water pumping station. The open space enclosed in accordance with the continuation of the module elevation, and in places where floors there glazing, fitted panels with blindselewacyjnych.W building is designed two garbage cans. Both are located on level 00 (ground floor) .B. KonstrukcjaDziałka, on of which is designed building is not built. Area of land is flat, it is covered with grass. The projected building consists of a high of 19 floors above ground and a low 5-storey hopeof. The whole underpinned two levels of underground garages. The main structure is designed as a monolithic reinforced concrete. The design and layout mullion and transom and mullion-plate shafts of reinforced concrete monolithic. Two-storey underground reinforced concrete slab pole, monolithic, with external walls in the form of diaphragm walls. foundatione directly on a reinforced concrete slab thickness of 180 cm in the high part, 80 and 50 cm in parts niskiej.Poziom "0" of the building was adopted at the elevation of 29.30 m above the level of '0' level of the Vistula foundation designed building amounts to -9.73, -8.73 and - 8.43 m below the "0" of the building, which roughly corresponds to the hollow below the existing ground. the bottom of the trench przyjęto in the level of ~ 15 cm below the foundation level, ie. m -9.88, -8.88, and: 8.58 m below the "0" of the building, ie. on the ordinate 19.42 mi 20.57, -20.72 m above the level of '0' of the Vistula River. The area of land is almost flat and is within ordinates 28.8: 29.5 m eg "0" Wisły.Zgodnie of the Minister of Transport, Construction and Maritime Economy of 25 April 2012 years on establishing geotechnical conditions of foundation construction objects, on the basis of geological and engineering documentation designed object must be in the third category geotechnicznej.Uwzględniając location of the proposed facility, trench depth and shape of the underground part of the plan designed to protect the walls of slotI thickness of 60 cm.Zaprojektowano foundation of the building directly on the slab thickness of 180 cm with local przegłębieniami resulting from technology [pit cranes, wells etc.] and przegłębieniami the columns and pillars. Before the robot design should be developed workshop documentation for the waterproofing of underground partstion building and agree it with the supervision of the investor and autorskim.Elementy vertical supporting structure are shaped in such a way that as little as possible to interfere in the architectural arrangement of the arrangement of individual pomieszczeń.Komunikację vertical in the building designed to provide separate stairs and elevators grouped in a monolithic shafts klatkowych serving storey office / service and garage floors. Plates Gears staircase reinforced concrete, poured-based floor slab on one side and plates spocznikowych the other. Panels sub-assemblies based on concrete walls żelbetowychElementy przeciwogniowo secured by proper selection of the minimum dimension of the reinforced concrete elementego be formed and the required concrete cover in accordance with applicable standards and in accordance with the guidelines of the Institute of Budowlanej.C. Installations sanitarne1) Plumbing: designed building will be supplied with water from the municipal water supply system Dn 150 Street. Bukovina. The meter will be located in the room "Water connections" zlokalizoof an important level -1. On the main conduit will be installed water meter shut-off valves, strainer and insulator flow feedback type BA. In order to ensure adequate water pressure will be applied to a set of booster pumps to lift ciśnienia.2) Installation of sanitary sewage: Sewage sanitarywill come down to the existing sewer fi0, 30 m in the street. Bukowińskiej.Ścieki the ground floors will be discharged by gravity directly into the drains. Waste water from washing floors in the garage will Pretreatment in gasoline separator located on level -2 and then pumped to the external sewage. Waste water from the substation gromadzoAD will be well-cooling and then pumped to the external sewage. Technological sewage created in the kitchen will be discharged by gravity to podczyszczenia in fat separator located on level -2 and then pumped to the external network kanalizacyjnej.3) Installation of storm water drainage: Sewage rain ondbywać will be a sewer in the street. Bukowińska in an amount of not more than 23 dmi?1/2 / s. Rainwater will be collected in the storage reservoir located in the building and then pumped to the external sewage. Drainage system will be vented cargo rainwater from dachu.4) Hydrant system and sprinkler system: water supply systemand the Fire will have the following equipment :: 25 internal hydrants with semi-rigid hose length of 30 m, mounted on all floors above ground, : internal hydrants with 33 lay-flat hose 30 m long, mounted on the underground floors, : DN52 hydrant valves mounted on irrigated risers, on-ground storeys to Hokości 25 m above ground level: one valve on the upper floors and all underground: after 2 hydrant valves, arrangement: each frame schodowej.Instalacja will be supplied with water through a Tank Unit with tank fire with working capacity of 122 mi?1/2, to whose water will be supplied from the municipal water supply. The tank fire 50i?1/2mi?1/2 are for internal hydrants and 72 mi?1/2 to supply hydrant zewnętrznego.5) Installation of high-pressure water mist: Designed system fire. to extinguish uses high-pressure water mist. Elements of the system: the water supply tank, low-pressure water pipeline, high pressure pump unit, compressor unit, high rurociągi and fittings, section valves and flow sensors, sprinklers fog. Each sprinkler and spray fog is equipped with a strainer 300 microns, which prevents clogging of the nozzles of fog by any particles carried in the distribution network. The water used in the system of water mist has parameters of drinking water. All components of the system affectingi?1/2the system water mist are monitored. The control cabinet high-pressure pump unit will be placed in a room pumping water mist. Connected to the control cabinet will signal states of the technical unit and forwarded it to the fire alarm system object. To the central fire alarm system object will be transferred to all alaRMY fire and technical signals directly from the sectional valves and flow sensors high-pressure water mist. In addition, it is expected to provide two signals with technical pumping station to the fire alarm system. The exact amount of video signals and a place to which to bring the cables will be included in the guidelines of industry in the project executive. Aftercorresponding movement pumping water mist is located in a building on level -2 and is extracted from the fire zone garażu.6) Central heating and hot water: heat demand of the building will be covered with High pressure the district heating network. Place switch-chamber heating C-29 / L-5A / p-1 located on the network ofpłowniczej 2xDn300 in Domaniewska street. In order to connect the building will be made osiedlowa a.s. 2xDn125 along. Bukowińska of which will be made direct thermal connection to the proposed building. Connection heating will be made of pre-insulated pipes with running the height of pipes providing drainage and venting wires. Projektowane terminal will be equipped with the necessary shut-off valve, vent and odwadniającą.Armatura and wires designed district heating network will meet w / the requirements of temperature and pressure. Heating cables according to the supplier of heat SPEC will be equipped with a resistive alarm system enables monitoring ofi?1/2heating network and informing about potential leaks of heating wires. To allow heat reception in the proposed building will be made of: 1 garage substation. The substation in the form of a node as a compact 6-functional for the needs of internal installation will be equipped with equipment and fittings authorized for use prstrabismus provider of heat. The substation will have automatic regulation of the system in accordance with the supplier of heat DALKIA. The documentation of the substation in the execution phase will be agreed with DALKIA.Przygotowanie hot water: central node in the warm kitchen and part of the collective residence, in the social office and the tenants locally popElectric heaters slaughter of water.In building provides the following installations of electrical heating :: installation of electric heating garage entrance for cars, : installation of electrical heating crossing on the terrace floor 04, : heating system drain grilles at the entrance to the garage, : installation of heating roof drains, : the radiatorki electric indoor telecommunication or remote wired the power ... smokers c.o., Heating wired chilled water carried on the roof of the building and in a cold garage spaces, : securing wires z.w. in unheated garages frost, : electrical air curtain over the door entrance Interlocking to the premises "parterowych.Dla utmotings circulation of hot water in the system will be applied circulation pump. The installation will provide at the point, the hot water temperature no lower than 55 C and not higher than 60 C. In order to disinfect Installation provides a periodic overheating of the water to a temperature of 70 C. 7) The installation of mechanical ventilation and air-conditioning ventilation systems ::Mechanical exhaust: in the garage: the control system based on detection of hazardous gases, a generator and through the independent fans in toilets, office microwave, garbage separator fat and sewage pumping stations, a separator of oil products, : installation of mechanical ventilation supply and exhaust independent systems: In the entrance halls, in the service area on the ground floor for Sal conference on the first floor: separately for Hall in the low part and the high part, in the areas of office by two assistants central, for part of the collective residence for the kitchen with facilities, : ventilation installations -klimatyzacyjne independent systems: for restaurants, for Sali club, : ukLada cooling water or freon for server, : cooling systems, water or Freon indoor LPD, : in the rooms of the building is expected to use czterorurowych fan coil units, mounted in suspended ceilings, with diffusers spaced slotted in the rhythm of modular office along a fai?1/2ade, : installations smoke, control washi?1/2 ventilation through BMS, keeping the room temperature at a preset level will implement through local ściennych.8 room controllers) Installation chłoduChłod the needs of the building will be generated through the compact units can be air-cooled chiller located on the roof of the building. Provides process cooling clientsmakonwektorow offices and services, coolers ventilation assemblies, fan coil to living a collective cooling system for the server room. The aggregates will be used refrigerant R134a or other eco-friendly. To meet demand for cooling a building provided 2 chilled water cooling capacity of ~ 50% of the maximum zapotrzebowania cold each. Units will have a total capacity 2x684 = 1368kW. Chillers will produce chilled water parameters computing t / tp = 7 / 120C. To increase the economy to produce cooling chillers will be installed in the winter version freecooling. The building is expected to perform pumping chilled water in premisesand in technical on the roof of the building near the chillers. Design is the installation chilled water circuit with separate aggregates and separate circuits connected in a common cold reception technology bypass. As bypass provides a fluid coupling with buffer tank of chilled water. The condensate from draining trays fan coils installed in the ceilingch suspended office space will be gravitationally discharged divisions located in the shafts, pipe over the sink in the basement rooms technicznych.Praca all installations monitored by an integrated system for the whole building automatic control and monitoring based on DDC controllers. The system performs the following functions :: Regulatoryi?1/2maintaining working parameters (temperature, humidity Those expenses) at a preset level, : security ... ce: protection against low temperatures ... ... supply and protection against frost heaters, ... Turning off the fans in case of breaking belt, protection of pumps before Dry-running control purity of your air filters, : alarm: 'signalI fuse monitor any of the security "or default operating conditions, : Information: informing about the operating status of individual equipment devices ..." and .: installation of collecting data from the counters metering installations, : controlled ventilation ... garages on the basis of CO detectors and LPG. D. Installations elektryczneProjektowany object is energized lines MV 15kV. Fori?1/2the needs of the power supply and other fire loads are important for the operation of the facility is expected to provide power on both sides. The building is expected to build a transformer station type CB performed both indoor located on level -1. The station will be equipped with two MV 15kV switchgear in part RWE Stoen Operator. PinkDepartment of electricity in part of the customer will be using two MV, two transformers and switchgear NN. For CB station facilities will be provided access from the garage areas and provide convenient transport of power equipment in accordance with the requirements of the Department of Energy, RWE Stoen.Zasilanie basic: two episodescable line AL 3x1x150 mm2 / 20kV of cable line SN on the directions of the PCO Stegny c.44: transformer station No. 12049.Zasilanie reserve: two sections of the cable line AL. 3x1x150 mm2 / 20kV of cable line SN directions: transformer station 7333: transformer station No. 6172.Kable SN will be brought to the transformer station type CB built-in This property hast at the level of the garage. With the MV part STOEN station CB is derived Branching to the MV part of the customer. Backup power supply provides only for the main switchboard fire RGPPOŻ.W building provides a power generator used for emergency power supply and server load associated with normal operation of the server, such as the Site Uptime Enterpriseed klimatyzacja.Pomieszczenie central UPS is located at -2 building in the immediate vicinity of the main distributor of low voltage. Through a central UPS power load will require uninterruptible power supply, such as servers, local points dystrybucyjne.Pomieszczenie main switchgear low voltage station was design designede -2 at the building. The room will be located RGNN main switchboards, from which we will be taking further distribution of electricity. Low voltage switchgear Candidates RGNN will be equipped with automatic regulation of reactive power using batteries capacitors. Capacitors will be switched gradually by a system of automatic control. With Distributiveelnic main low-voltage power will be :: lighting boards and sockets, : boards, : administrative power lighting, sockets in areas of broad, : cabinet control and power load mechanical / contractor in the field of mechanical installations /, : distribution loads of power-related service technical equipment in the puddingto / in the field of electrical installation contractors /, : supply other administrative loads (heating cable pipelines, heating roof outlets by. guidelines mechanical industry) .Rozdzielnice bunk located on each floor will be equipped with apparatus adapted for mounting on DIN :: switches, : circuit breakers, :circuit prevention by, : apparatus signaling and control, : surge, : control indicators faz.Tablice load strength and mechanical properties will be installed in technical areas related to the operation of devices technicznych.Rozliczeniowy measurement of electricity for the whole building will be realized on the medium voltage: measurement pośrednand the basic power supply and the power rezerwowego.Na each floor designed bunk switchgear for power reception technology of broad, such as general lighting, mechanical type fancoils and plug sockets. These switchgears are designated RO and numbers depending on the floors, on whom they are. Onfloors in part of the collective residence designed switchgear bunk ROH of which will be powered distribution of individual rooms. The indoor kitchen facilities will be located switchgear power kitchen appliances. For power devices in the server provides the switchgear dedicated uninterruptible power supply (with a central UPS) .inASSEMBLY receiving internal :: basic lighting and emergency lighting, : External, : obstruction lighting, : installation of plug sockets, electrical installation equipment, : installations power and load technologicznych.E. Technical installations: Fire Alarm System, : audible warning system, : system CCTV monitoring system, :i?1/2Access, : installation of elevators and intercoms intercom system, : interaction and collaboration Installation installations, : ICT (telecommunication connection, telephone exchange, telephone installation and komputerowa.F. wnętrzProjekt equipment includes all furniture equipment fixed and mobile offices Transportation Technical Supervision, ie.:: Archives: racks stationary and movable metal, : partitions integrated with cabinets furniture, : building furniture cloakroom conference, : building furniture locker room restaurant, : buildings rack auxiliary rooms, : standing furniture: tables, benches, chairs, desks, chairs, beds, sofas, couches and other equipment according to the documentation, : lighting, baskets dareThose rods, lustra.G. WewnętrznaUkład green plantings and plant material, as well as technical solutions related to irrigation, drainage and drainage in relation to the greens in pots and slab tarasow.H. The proposed land development, network and przyłączaTeren designed for the project is not built and is not developed. teren plot is flat and there are trees. Puławska street in the investment proceeds sidewalk pedestrian and cycle path. On the plot there were no trees, which are a monument przyrody.Inwestycja includes the construction of the building which established the Transport Technical Supervision with land development, ie. The building entrance with access for people thanepełnosprawnych, garbage cans, communication system circular pedestrian: ride and pedestrian areas, driveways, drainage, irrigation of greenery, pavements, green on the plot, green roof, landscaping, outdoor lighting, technical infrastructure in the form of networks and connections of water supply, sewerage sanitary and rain, heat, energy, Telecommunications and road and solutions to protect środowisko.Inne information about the performance of the object of the contract: The period of warranty and quality guarantee a minimum of 5 years from the date of final acceptance of the object of the contract for which there are these proceedings including fixed furniture (built-in) and moving furniture and equipment building Ponadto, the period of warranty for defects over a period of three months gwarancji.Wymagania related to the execution of orders on employment of people: on the basis of art. 29 paragraph. 4 Public Procurement Law Employer will require that among those directly involved in carrying out orders were employed at least 2 unemployed persons on the basis of a referral Countyof this Labour Office in accordance with the Act of 20.4.2004 on employment promotion and labor market institutions (ie. Journal of Laws of 2008 no. 69, item. 415 as amended.) or on the basis of the instrument of directing the unemployed to employer issued by a body engaged in the performance of tasks related to the labor market specified in the corresponding provisions of the EU Member State or Europejskiego Economic Area.
Description: Office block construction work
Authority Type: Other

Contact Nature: Works

Procedure: Restricted procedure

Document: Contract notice

Regulation: European Union, with participation by GPA countries

Award criteria: The most economic tender

CPV code: 45213150, 45421160, 45100000, 45223200, 45421153, 45421152, 45400000, 45332000, 45311200, 45312000, 45314000, 45233120, 45231000, 39100000, 39131000

CPV Description: Office block construction work.  

Ironmongery work.  

Site preparation work.  

Structural works.  

Installation of built-in furniture.  

Installation of partition walls.  

Building completion work.  

Plumbing and drain-laying work.  

Electrical fitting work.  

Alarm system and antenna installation work.  

Installation of telecommunications equipment.  

Road construction works.  

Construction work for pipelines, communication and power lines.  

Furniture.  

Office shelving.  
Internet address (URL): http://www.tdt.pl

Directive: Classical Directive (2004/18/EC)

Documents

Tender Notice
Login to view

Similar tenders

Poland Public Procurement Intelligence

Frequently asked questions

The bid deadline for Office block construction work was 15 Apr 2016. Bidding is closed.

This tender has been issued by Transportowy Dozor Techniczny in Poland.

The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.

This tender is Self Financed

The tender is classified under the following CPV code(s): 45213150 - Office block construction work, 45421160 - Ironmongery work, 45100000 - Site preparation work, 45223200 - Structural works, 45421153 - Installation of built-in furniture, 45421152 - Installation of partition walls, 45400000 - Building completion work, 45332000 - Plumbing and drain-laying work, 45311200 - Electrical fitting work, 45312000 - Alarm system and antenna installation work, 45314000 - Installation of telecommunications equipment, 45233120 - Road construction works, 45231000 - Construction work for pipelines, communication and power lines, 39100000 - Furniture, 39131000 - Office shelving.

The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.

The TendersOnTime reference is 5756338. The purchaser document reference is 090000-2016.

See the Similar Tenders section on this page or browse other tenders from Poland.

This tender falls under Construction and Real Estate, Materials and Products in Poland. Suppliers in these sectors can track similar Poland tenders using CPV-based alerts.