5151A: Foundation Work Response Submission: Vista Housing for Seniors 11622 - 119 Street Nw Edmonton, Ab T5g 2X7 Response Contact: Alcabedos, Jay Maintenance Manager 11622 - 119 Street Nw Edmonton, Alberta T5g 2X7 Tel: 7806198037 Fax: 7804750275 Email:
[email protected] Opportunity Description: Scope of Work A. Administrative 1. Certify that Injectible Grout will Produce Properties Appropriate to Filling Voids, Raising Slabs and Levelling Slabs. 2. Conduct Review of the Main Floor of the Building with Consultant and Owner to Document Conditions Prior to Treatment and Outline Scope of Treatment at Each Suite, Room, Common Area. 3. Conduct Pre-Construction Meeting and Pre-Placement Meeting(S) Attended by the Contractor, Other Subcontractors, Owner, and Consultant to Discuss: A) Owners Occupancy Requirements and Restrictions, Including Hours of Work, B) Address Specific Issues Related to Work Results and Scheduling Associated with Slab Raising Operations, C) Other Topics of Concern Raised by the Meeting Participants. 4. Coordinate Locating of Grout Holes, Extent of Required Work, and Verify Locations of Sub-Slab Utility Services Before Starting Work. 5. Schedule Work and Daily Clean-Up Such that Building Can Continue Operation. B. Execution 1. Mobilize/Demobilize from the Site As Required to Include up to Twelve (12) Injection Events, As a Result of the Necessary Scheduling of the Work to be in Conjunction with the Temporary Relocation of the Tenants on a Rotating Basis. 2. Locate Underground Utilities Such to Avoid Damage to Underground Utilities During the Slab Coring and Grouting Operations; 3. Core Access Holes in the Concrete Slab, As Required, to be used As Injection Points for the Polymer Grout; 4. Fill Sub-Slab Voids and Lift/Level the Concrete Floor Slab, As Much As the Building and Slab will Allow; 5. Monitor Slab Movements During the Grouting Operations Utilizing a Rapid Survey Technique (Ziplevel or Similar Device); 6. Patch the Core Holes with a Bonded Cementicious Material that is Finished to be Smooth and Ready for New Flooring Installation; 7. Restore Work Area, Including Core Holes, to Condition Similar to As Found Prior to Treatment to the Approval of the Consultant and Owner; 8. Review the Site with Consultant and Owner After Completion of Each Injection; 9. Following Slab Levelling, Verify the Integrity of the Floor Drains (Storage Room, Laundry Room, Garbage Room), Sanitary Drains (Toilets, Sinks), and Stormwater Drains that Extend Below the Levelled Slab, by Scoping of the Drains by Cctv Operators with Pacp Certification (Pipe Assessment Certification Program); 10. Re-Align the Levelness of the Slab After One Year, at No Charge, Should there be Future Settlement of the Slab; 11. Provide Access for Consultant and Owner to Observe and Inspect During Inject Treatment. Vista Housing for Seniors
Expires Date : ...