Procurement Summary
Country : Switzerland
Summary : “neubau reservoir st. Hilarien, sanitaerinstallationsarbeiten, please do not open“
Deadline : 21 Jun 2019
Other Information
Notice Type : Tender
TOT Ref.No.: 33481079
Document Ref. No. : 1080055
Competition : ICB
Financier : Self Financed
Purchaser Ownership : -
Tender Value : Refer Document
Purchaser's Detail
Purchaser : IBC ENERGIE WASSER CHUR
Bedarfsstelle/Vergabestelle IBC Energie Wasser Chur
Beschaffungsstelle/Organisator IBC Energie Wasser Chur, zu Hdn. von Florian Eigner, Felsenaustrasse 29, 7000 Chur, Schweiz,
Switzerland
Email :florian.eigner@ibc-chur.ch
URL :www.simap.ch
Tender Details
“neubau reservoir st. Hilarien, sanitaerinstallationsarbeiten, please do not open“
the city of chur procures around 2/3 of the drinking water from the source areas of sharmoin in valbella and parpan. From the reservoir staedeli, with a water level of 854.50 meters above sea level, a cast-iron pressure line leads into the engine room of the ibc energy water chur, where a pelton turbine transforms the kinetic energy into electricity. From the reservoir grida, with a whatthe mirror height of 837.00 m ue m., leads the transport line 2 into the engine room of the ibc energy water chur, where a pelton turbine converts the kinetic energy into electricity. The maximum water level lies in the reservoir at 675.22 m above sea level. The existing pressure line is extended and led along the back wall directly into the reservoir (engine room).the transport line 2 from the reservoir grida, via line channel resp. The slide chamber led into the engine room. 2.7 place of execution the location of the reservoir next resp. In the final state at the same location as the existing reservoir st. Hilarien from the year 1880 resp. 1901, was in terms of optimal accessibility as well as the location outsideof the settlement area of chur. The pressure reduction ensures that there is only a low line pressure within the following zones (coordinates center of gravity of the reservoir 2'759'980 / 1'190'165 respectively center of gravity of the new reservoir 2'759'990 / 1'190'160 ). 2.8 duration of contract, framework agreement or dynamic purchasingsystem 24 months after signing the contract this order can be extended: no. 2.9 options yes description of options: main quantities: 400m, supply and installation of piping in stainless steel, dn 125 to 500mm 30 pcs, supply and installation of fittings, dn 125 to 500mm 650m, supply and installation of piping in cast, dn 100 to 350m100 pcs. Delivery and laying of molded pieces in cast, dn 100 to 350mm 2.10 award criteria based on the criteria mentioned in the documents 2.11 are variants allowed no 2.12 are partial offers allowed no 2.13 execution date beginning 15.07.2019 and end 03.07.2020 third
Documents
Tender Notice