Expired Tender UAE ICB TOT Ref. 21492354

Mechanical Service for Removal, Testing Tender in UAE - 21492354

Tender notice from UAE, published on 15 Mar 2018.

Executive Summary

The DUBAI ELECTRICITY & WATER AUTHORITY has issued a Tender notice for the procurement of a Mechanical Service for Removal, Testing, and Re-Installation of Lock 20 ST LP Extraction Line in the UAE. This Tender notice was published on 15 Mar 2018 and is scheduled to close on 18 Mar 2018, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 21492354, while the tender notice number is 2331800584 and Register on the platform.

Key facts

Summary
Mechanical Service for Removal, Testing, and Re-Installation of Lock 20 ST LP Extraction Line
TOT Ref. No.
21492354
Document Ref. No.
2331800584
Country
UAE
Notice type
Tender
Competition
ICB
Publication date
15 Mar 2018
Bid deadline
18 Mar 2018
EMD
Refer Document
Tender value
Refer Document
Purchaser ownership
-
Financier
Self Financed

Purchaser details

Purchaser contact is for registered users

Login to see details

Tender details

Quotation are invited for Mechanical Service for Removal, Testing, and Re-Installation of Lock 20 ST LP Extraction Line.
Qty 1
Technical and General Specification of Outsourcing Work M Station, Jeel Ali Power Station Title: Mechanical Service for Removal, Te Sting, and Re-Installation of lock 20 St Lp Extraction Line#1 Downstream Manual Butterfly Isolation Valve 20naa21aa002; Size: dn1600, Class: Pn 10 Rf Qty: 01 No. Duration: 4 Days a.# Scope of Work: ·#Mobilize Men/Equipment within 01 Day of Advance Notice. ·#Get Pt W (Permit to Work) and Lc (Line Clearance) Document from Dewa. ·#the following Documents to E Submitted to Get Ptw, O# Method Statement O# Risk Assessment of the Work O# Tool Ox Talk Report. ·#Ensure Area is Correctly Secured and Safe to Work on in All Respects, Y Checking Positive Line Isolation and Proper Depressurizing of the Line. ·#Conduct Site Survey and Safety Inspection to Assess the Working Environment. ·#if the Working Environment Safe, You can Proceed with the following Steps. ·#Provide Any Temporary Supports for Locking if Required to Avoid Shifting of Pipeline when the Butterfly Valve is Removed. Any Line or Support Removal Required to E Discussed with Dewa. ·#Loosen/Remove the Flange Bolts & Remove the Valve from its Position.(Dewa Crane to E Used). ·#Transport the Valves S Afely to Contractor Work Shop from Dewa M Station, Jeel Ali. ·#Leak Test for the Valve Shell & Seat as Per Standard Api 598 (Lind Fl Anges for Testing to E Supplied Y Dewa). Dewa Person will E Present during the Test. ·#Transport Ack the Valves to Dewa, Jeel Ali. · #All Flange Olts & Nuts to E Cleaned and Luricated. ·#the Contractor shall Remove Any Temporary Supports #Etc. If Erected to Support Pipes after Completion of Valves Installation Work. ·#Reinstall the Valves in Original Position. The Flange Olts are to E Torque Tightened. ·#Party should Complete the Jo within 4 Days ·#Hot Tightening of the Olts to E Done after Start Up. ·#Final Inspection from the Dewa Personnel. ·#Qualified Jo Supervisor to E Assigned for the Jo. ·#Skilled Technicians to Carry out All the Jos. ·#Housekeeping and Disposal of Waste from the Jo to E Done Efore Site Clearance. ·#De-Mobilize Men and Equipment after Completion of the Jo. ·#Certified Testing Report to E Submitted to Dewa. Testing Report with Photos to E Provided. Testing Instruments Calibration Test Valid Certificates to E Attached in the Report ·#All Tools & Tackles is in Contractor`s Scope. ·#Proper and Tested Tools to E Used. ·#All Lifting & Power Tools should E with Valid Test Certificate. ·#the Contractor shall Visit the Site and Make Himself Fully Familiar with the Work Scope Before He Submit His Id. ·#Provide Work Procedure, Method of Statement & Risk Assessment for the Jo ·# Possibility of Working 24 Hrs /Day in Case of Required to Achieve the Target Completion Date ·#Dewa Scope: O# Scaffolding Erection at Site O# Insulation Work O# Crane Required at Site. .#Warranty ·#the Warranty Period for the Work shall E One Year from the Date of Completion of Work Certified Y Dewa. ·#in Case of Any Damage/Defect of the Work Carried out under this Contract within this Warranty Period, the Contractor shall Attend and Carry out the Necessary Repair Work and Rectify the Defect within Short Period without Affecting the Production of Electricity and Water. C.# General Terms & Conditions ·#the Contractor shall Visit the Site and Make Himself Fully Familiar with the Work Scope, Plant Access, Facilities, Complexities, Safety Measures etc., Before He Submit His Id. ·#the Contractor shall Ensure Housekeeping on a Daily Asis and the Contractor shall E Responsible for All Waste Material Disposals to Designated Places. ·#Al L Dewa Safety & Environment Policy, Rules and Regulation shall E Followed at Work Site during the Execution of the Work. The Contractor #S Engineer should E Familiar with Safety Regulations While Working in a Hazardous Area. ·#Scaffolding if Required shall E Arranged Y Dewa. ·#Crane if Required shall E Arranged Y Dewa. ·#All Rigging and Transporting Equipment should E Arranged Y the Contractor. These Equipment should E Duly Tested and Certified Y the 3rd Party Inspection Agency and the Certificates to E Provided Start of Work. Certified & Qualified Rigger with, Mechanics should E Provided. ·#the Work shall E Executed under Dewa Supervision and as Per Q Uality/Schedule Requirement. #Contractor #S Supervisor and Safety Personnel shall E Available at Site Throughout the Period of Work. ·#Entry Permits for the Staff/Workers should E Applied with Passport Copies Having Valid Visa. Persons, Whose Names are not Available in the List, will not E Allowed to Enter the Powerhouse. ·#Entry Permits for the Vehicle should E Applied with Copies of Vehicle Registration. ·#Dewa will Arrange Necessary Ptw / Lc / Hwp from Operation, Chemical La / Fire Department Clearances to Carry out the S Cope of Work under this Contract. ·#the Contractor upon Receiving the Work Permit shall First Ensure a Safe Working Condition. ·#All the Persons should Wear All the Required PPE While at Work. ·#All Material and Tools Brought in shall E Declared at Power Station Security Gate and the List of These Items shall E Signed Y Dewa Security. The Copies of These Documents shall E Lodged with Dewa Engineer in-Charge on Daily Asis. This Document will E the Asis for the Clearance (Gate Pass) to Take Them out on Completion of the Jo. · #Service Air, Electricity and Water for Work at Dewa Site. It is the Responsibility of the Contractor to have His Own Arrangement in Extending the Electricity and Water Utility to His Places of Work including Lighting.

Documents

Tender Notice
Login to view

UAE Public Procurement Intelligence

Frequently asked questions

The bid deadline for Mechanical Service for Removal, Testing, and Re-Installation of Lock 20 ST LP Extraction Line was 18 Mar 2018. Bidding is closed.

This tender has been issued by DUBAI ELECTRICITY & WATER AUTHORITY in UAE.

The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.

This tender is Self Financed

The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.

The TendersOnTime reference is 21492354. The purchaser document reference is 2331800584.