Line 730, zurich meilen rapperswil, the fourth Tender - 5029405
Tender notice from Switzerland, published on 22 Jan 2016.
Executive Summary
The CHEMINS DE FER FA has issued a Tender notice for the procurement of a Line 730, zurich meilen rapperswil, the fourth part of the zurich rer complement, track cusp herrliberg-feldmeilen, km 16 740 17 680 in the Switzerland. This Tender notice was published on 22 Jan 2016 and is scheduled to close on 02 Mar 2016, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 5029405, while the tender notice number is 898913 and Register on the platform.
Key facts
Summary
Line 730, zurich meilen rapperswil, the fourth part of the zurich rer complement, track cusp herrliberg-feldmeilen, km 16 740 17 680
Line 730, zurich meilen rapperswil, the fourth part of the zurich rer complement, track cusp herrliberg-feldmeilen, km 16 740 17 680
construction at the track the execution of work at the track is divided into several construction phases (cf. Construction program, 1.51 and annex d plans construction phases, annex d 1.53) .after the provisional trace layouts between the cross sections (pt) 7 and 14 (with drainage def., sc matte foundations and roads service steel), the way in service on this section will be moved to the side of the relief at the 1st ban weekend (weekend) .it also during the 1st ban the ballast shoring separate the trace two halves: lake rating and raised ratings. The work at the track will be realized lake side at first, and then the shifted service channel ce side will be commissioned to extend the main track rating relief.les work are: shoring ballast, ballast removal, foundations lc masts, excavation and replacement of materials, drainage, laying of the foundation layer, of the base layer, the bituminous sub-ballast layer and preballastage. The designations of the materials, the thicknesss of different layers arise, the width of the track, ratings, etc. Pt contained in annex d of 1.23 and normal profiles (pn) of schedule d of 1.22.retenue ballastla retaining the ballast is planned between 16 975 and 17 440 km, for a length of about 470 m in the axis of the trace (see appendix d 1.24 pt and construction phases in annex d 1.53). In the construction sized, it is expected to have all of the amounts 2.5m hea (variable length depending on the subgrade, sometimes in the rock) is compartmentalized using steel metal sheets, which will also plugs into the ground . Because of predictable noise exposure, the ballast will be realized shoring day the entire length at the 1st ban weekend. The dismantling will take place in phase 8.drainagede both sides of the feeding trace, a drainage system will be set up during the corresponding phases of construction, the same time as earthworks. The bottom of the pit presents a width of 60 cm. The depth is variable. The crest of the drain pipe must be aat least 20 cm below the platform. The partial drainage pipe (nominal diameter: 200 mm) will be placed in the filler concrete, with the entry of managed water surfaces on the sides. The pit will be filled with a filter body in rond.fondations gravel lcles mats lc matte foundations are to be be built according to the plans in appendix d 2.02, depending on the type foundation (see list in annex d 2.01). The execution of the work is planned during night or day intervals, depending on the railroad and the construction phase of concernee.ouvrages artmur soutenement of the plant at the lake, 16889-16902 km this wall soutenement along nearly 13 m rests on a non-reinforced concrete foundation. The bethy will be flowing and compact immediately after excavation, in order to enjoy the temporary cohesive aspect of the talus. A retaining wall in equerre will be built on site. The depth of the foundation was chosen to avoid a way to weigh more on the rubble wall of the factory by the lake, situated in aval.murs of soutenement rebbergstrasse north and americatrinidad wall soutenement rebbergstrasse north, along almost 150 m must be erected between the pedestrian crossing and the underpass haldengaessli rebbergstrasse. The wall of soutenement rebbergstrasse south, down almost 48 m, will bati south of the underpass rebbergstrasse. Constructions, which function as retaining walls at right angles, are between 3.45 m and 445 m.the soutenement wall located near the ways of installations in service or under railway loads, consolidation excavation is necessary. This wall will take the form of a wall to be perforated nailed to prevent runoff to pressure dynamique.la variable nature of the ground work for this stage of induced measures suivantes on foundations: - if the foundation of the retaining wall is in the rock or near the surface of the rock, the crumbled pieces of rock are excavated and replaced by the concrete maigre.- if the foundation of the retaining wall is in a moraine, the wall can be immeasurable bati particuliere.- if the foundation of the retaining wall is founde in a scree slope, it is planned to replace the materials for lean concrete introduced until about 80 cm deep in the foundation trench. The track of the drainage system will be constructed as a measure of the retaining wall backfill in different couches.passage pedestrian haldengaessliafin to build the structure, maintenance (cff-h) must build a temporary bridge over the channel in service. It will first prepare the support surfaces (with a suction dredger or a conventional machine) when two night intervals protracted. To build the temporary bridge, the current ceiling of the lower pass will then be detached and disassembled for another night interval. The new crossingpedestrian of about 12.0 m long and 3.0 m wide feeder will be under the temporary bridge and take the form of a closed frame construction (with low slab) in poured concrete in place. The pedestrian crossing will remain closed to the public throughout the duration of the work. This new construction will cause various adaptations of pipes. R pipeeste unchanged under the pedestrian crossing. The simple block connections will henceforth behind the abutment wall. The pipeline will be rebuilt further. Under the abutment walls, it is planned to replace the materials for lean concrete until reaching the stable part of the moraine. The abutment walls will be backfilled with pea gravel or e sleepersno draining concrete, as well as all-comers serious, and provided with drainage pipes on both sides to ensure the evacuation of the water. The work of the ceiling will be covered with a waterproof layer (the tightness in polymer bitumen) and an asphalt protective layer flows from each side to the drainage device. Finally, at the 4th ban weekend, the temporary bridge will be destroyed and backfilling of the book will be complete.pont of rebbergstrassele railings will demonte rating lake. The granite cover plates are removed and replaced, but this time by anchoring in the cantilever by means of threaded rods glued. The degradations protection mortar around the edgewill be repaired. A new railing will be fitted on the cover plates replacees.le base of the parapet will be disassembled terrain rating. In parallel to the dismantling of the base and service degagement, tightness of the deck will be reinforced by the polymer bitumen. A coating mastic asphalt is applied as a further layer of protection. On this couche dock equerres of elements willing to be a constant distance from the axis of the road, over a concrete foundation built over the whole width of the structure. An asphalt wedge flows will be shaped on the outside of cable duct for fasteners. Cote also raised the railings will renouvele.passage to the lower pedestrian bodenackerstrasseafin to build the structure, maintenance (sbb-ih) has to build a temporary bridge over the channel in service. It will first prepare the support surfaces (with a suction dredger or a conventional machine) when two night intervals protracted. To build the temporary bridge, the current ceiling of the lower pass will then be detached and demonte at the 1st ban weekend. The new pedestrian crossing lower by about 8.0 m long and 4.0 m wide feeder will be under the temporary bridge and take the form of a closed frame construction concrete poured in place. Throughout the duration of the work (excluding weekend bans), will be guides pedestrians through the chantier safely (include or associate with different positions of the offer the corresponding sequence of construction steps p. Ex. In 2 steps and protective measures p. Ex. Protective tunnel). This new construction will cause various adaptations of pipes. The configuration of the conduits and lines of various simple hook sera magazine. The abutment walls are backfilled with pea gravel and provided with drainage pipes on both sides to ensure the evacuation of the water. The work of the ceiling will be covered with a waterproof layer (the tightness in polymer bitumen) and an asphalt protective layer flows from each side to the drainage device. Finally, at the 4th inprohibition weekend, the provisional bridge will be destroyed and backfilling of the book will be supplemented. Locksmiths and security glissieres (see data from 133.100.04 and 143.300.01 positions) mechanics service way construction of mechanics service path is illustrated by the pn 8, 9, 13 and 15 and pt 8 15. This path has comlaying foundations concreted pipes (dn 250 mm, a = 2.0 m) implemented a phase 1, constituted of a steel structure equerres h supports and provided with screwed amounts consoles on which grating rests, b = 1.0 m. The amount of metal is embedded in the foundation in pipes concreted. The definitive dimensions of the foundations must be consignees by construction. The steel structure will montee has 8.glissiere phase securitela glissiere of safety is represented in the position 2, annex d1.21, between 17 245 and 17 315 km, the side relief with respect to the railway line. She also appeared in a pt 11 13. It provides for a single farm framework that should also be mounted to the stage 8.surp55cote south wharf elevation, the extremity of the dock (currently p25) will built over 60 my p55 with the help of elements in type equerre 48. The current granite slab will be demolished, and the element will be in equerre replaced by a new foundation with tachograph band. On the elevated part the asphalt coating will be destroyed and eliminated. The surface ofdock will be filled by materials in height of the foundation layer (untreated mixture to the binder 0/45 mm). The new dock surface is constituted of a interlocking paving stones in concrete. We must add two steps to the stairs of the lower transition kaffee hag, located at the tip of the wharf. The dock will be raised during the construction phase 8, in june 2016, without interruption exploitation. The replacement of the elements must be nuit.remplacement unroll at intervals of elements with outsourcing from the installation site a (see installation plan, annex d 1.02) .metresvoie cusp (book 1) earthmoving : cut 6000 5000 m3evacuations foundation m3couche: grave 5000 m3drainage: lines 950 filling mbeton 175 m3corps round gravel filter 500 m3travaux of coating: base coat 8000 m2couche sub-ballast oil tpreballastage 1500: 3000 ballast ttravaux of concreting: foundations mats lc 42 unitesfondations steel tracks 145 unitesouvrages art (notebook 2) wall soutenement: factory-rating lacw sfasdeblai 110 m3coffrage 60 m2armature 3200 kgbeton 20 m3drainage filling mbeton 10 20 60 m3remblayage m3mur of soutenement: reb. Nordw-srndeblai 1700 m3coffrage 1350 m2armature kgbeton 70 000 550 160 m3drainage filling mbeton 40 m3remblayage 1300 m3mur of soutenement: reb. Sudw-srsdeblai 550 m3coffrage m2armature 450 21 000 125 kgbeton m3drainage 50 filling mbeton 20 m3remblayage 400 m3ouvragespi: haldengaessli w-whadeblai 400 m3coffrage 350 m2armature 17, 000 kgbeton 100 m3drainage 50 filling mbeton 15 m3etancheite 150 m2remblayage 400 m3ouvrages pi: bodenackerstrasse w-ubodeblai 800 m3coffrage 500 m2armature 25, 000 kgbeton 160 m3drainage 75 filling mbeton 15 m3etancheite 120 m2remblayage 700 m3pont rebbergstrasse of the w-70 bredeblai m3consolidation excavations 20 m2galets 30 m3drainage concrete filling mbeton 40 10 125 m3etancheite m2elements in equerre 20 m3travaux locksmith and fences (book 3) circulation of service mechanics: length of the steel structure 270 m (b = 1.00 m grating equerres on supports h embedded in the concrete a = 2.00 m) guard rails: single farm setting 80m 2.6 place of execution zurich, communes and meilen herrliberg 2.7 walking divided into lots no 2.8 are variations admitted no 2.9 are partial offers permitted no
The bid deadline for Line 730, zurich meilen rapperswil, the fourth part of the zurich rer complement, track cusp herrliberg-feldmeilen, km 16 740 17 680 was 02 Mar 2016. Bidding is closed.
This tender has been issued by CHEMINS DE FER FA in Switzerland.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 5029405. The purchaser document reference is 898913.
Browse other tenders from Switzerland or search by relevant keywords and CPV classification.