Expired Tender China NCB TOT Ref. 73238798

Institutional and Capacity Strengthening Tender in China - 73238798

Tender notice from China, published on 18 Oct 2022.

Executive Summary

The ZUOQUAN COUNTY GOVERNMENT has issued a Tender notice for the procurement of a Institutional and Capacity Strengthening for Integrated Urban-Rural Water Supply in the China. This Tender notice was published on 18 Oct 2022 and is scheduled to close on 16 Nov 2022, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 73238798, while the tender notice number is LOAN-3557 PRC and Register on the platform.

Key facts

Summary
Institutional and Capacity Strengthening for Integrated Urban-Rural Water Supply
TOT Ref. No.
73238798
Document Ref. No.
LOAN-3557 PRC
Country
China
Notice type
Tender
Competition
NCB
Publication date
18 Oct 2022
Bid deadline
16 Nov 2022
EMD
Refer Document
Tender value
Refer Document
Purchaser ownership
Public
Financier
Asian Development Bank (ADB)

Purchaser details

Purchaser contact is for registered users

Login to see details

Tender details

Shanxi Urban-Rural Water Source Protection and Environmental Demonstration Project - ZQ-CS4 Institutional and Capacity Strengthening for Integrated Urban-Rural Water Supply
Approval Date: 22-Aug-2017
Deadline of Submitting EOI: 16-Nov-2022 11:59 PM Manila local time
Estimated Short-listing Date: 17-Nov-2022
Estimated Commencement Date: 17-Dec-2022
Estimated Commencement Date: 200, 000 USD
Engagement Period: 24 MONTH
Objective and Purpose of the Assignment

1. Project description

The Asian Development Bank ("ADB") has approved a loan of US$100 million to the government of the

People's Republic of China on December 31, 2017 to fund the urban and rural water conservation and

environmental demonstration project in Shanxi Province. The project will be implemented by the

Shanxi Provincial Government through the Jinzhong Municipal Government and Zuoquan County

Government. Through the implementation of this project, (i) the operation of Shixia Reservoir and

its basin vegetation will get improved, (ii) Qingzhang River and Binhe Road will get rehabilitated,

and (iii) inclusive water supply and wastewater collection services will be achieved, and (iv)

institutional capacity will get strengthened, thereby the living and environmental conditions for

urban and rural residents of Zuoquan County will get improved.

Zuoquan County Institutional and Capacity Strengthening for Integrated Urban-RuralWater Supply (ZQ-

CS4) is a contract package under the Shanxi Province Urban- Rural Water Source Protection and

Environmental Demonstration Project. Through the implementation of this contract package, it will

provide support for Zuoquan County-s overall urban-rural water supply services, strengthen related

water company-s capacity, and assist newly established water company to meet the challenges of

water sector reform.

By having an impact on the implementation of the project, the system and capacity building of

Zuoquan County's urban-rural integrated water supply will be strengthened, urban-rural water supply

service capabilities will get coordinated, and water supply capabilities will get enhanced, and

thus the living and environmental conditions of urban-rural residents in Zuoquan County will get

improved.

The current rural water supply in Zuoquan County has not yet formed a complete water supply system.

In some areas, raw water without any treatment is still for drink, and the water quality cannot be

guaranteed. The rural industrial water supply is insufficient, which is extremely incompatible with

the development of cities and towns. It not only cannot meet the needs of the increasing people-s

living standards, but also cannot meet the needs of economic development and severely restricts the

development of productivity. Therefore, it is necessary to improve the capacity of rural water

supply and strengthen the construction and management capabilites of urban-rural water supply

integration institutions.

2. Consulting service content and requirements

2.1 Basic scope of work

1) Analyze the current situation and development goals of the integration of urban and rural water

supply from the national, provincial, Shanxi and Zuoquan levels

2) Assess current performance across the whole service area and the development of an operational

improvement plan to improve and harmonize service standards;

3) Review the financial management status in the water utility, including institutional

organization, manpower sourcing, and control system; and offer suggestions on improvement of the

financial management pertinent to existing problems;

4) Design organization set-up to operate the water supply utility, and identify staff

responsibility in key positions;

5) Review and upgrade of billing and income collection systems;

6) Establish financial projections for the water utility;

7) Help to develop a capital investment plan linked to current performance and taking account of

changes in future demand;

8) Help to develop an asset management plan;

9) Provide advice on the management information system of the water utility;

10) Prepare a framework for water demand management (WDM); and assist the designated agency in

preparing a comprehensive WDM program for each water use sector: agriculture; commercial, domestic,

and industry; and

11) Provide technical advice to the designated agency on implementation of the WDM activities,

including industry water efficiency plans; repair and maintenance of agricultural storage and

conveyance infrastructure; development of the information, education, and communication materials

and distribution; monitoring and reducing nonrevenue water reduction for the water utility;

12) Assist water supply companies to improve their ability to manage and operate large-scale water

supply systems in a technically and financially sustainable way;

13) Upgrade and improve the water safety plan to determine the potential risks of low drinking

water quality and assist in the implementation of risk control and mitigation measures;

14) Evaluate and draft a comprehensive non-income water management plan;

15) Conduct water price willingness surveys, assist the government in setting appropriate water

prices and water price adjustment mechanisms;

16) Determine detailed capacity development requirements for sustainable water supply

infrastructure services and governance, organize and provide training on operation and maintenance,

water supply management planning, water supply safety, water resources protection, water

conservation, etc., and propose a list of training plans;

17) Organize seminars and domestic study tours to learn from the experience of other projects to

improve and upgrade the management level of the organization;

18) Research needs to meet the relevant requirements of PAM of this ADB project.

2.2 Carry out research on urban-rural water supply integration model, assist Zuoquan government in

formulating urban-rural integration agency settings, responsibilities and interests of various

departments; discuss and suggest the urban-rural water supply model of Zuoquan County.

1) Integrate water supply in urban-rural areas to promote sustainable social and economic

development

Integrated urban-rural water supply is the efficient allocation of water resources. The

implementation of tap water supply methods that integrate raw water, merge water plants, one-

network dispatch, large-scale operate, and high-quality service to promote the integration of urban-

rural water supply in suburbs and rural areas is conducive for strengthening the unified management

and improvement of water resource utilization and efficiency, improving the quality of water supply

and providing high-quality services, and promoting the sustainable development of the economy and

society.

2) Integrated urban-rural water supply model

Regional centralized water supply model:Under the regional centralized water supply mode, the water

plants in the water supply area are relatively concentrated, and the water supply and transmission

pipelines are connected as a whole, and the water supply dispatch and management are unified.

Generally, the regional centralized water supply mode is adopted in the central urban area and

surrounding townships, areas with relatively high population density, or when there are few water

areas that can be used as drinking water sources.

Centralized management mode of decentralized water supply:Some small and medium-sized water supply

facilities in rural mountainous areas are mostly self-contained systems. However, at the management

level, it can cross the corresponding urban-rural water supply integration, which is a stage of

modernization and urbanization development.

3)Implement the integration of urban-rural water supply

Adhere to the comprehensive, coordinated, and sustainable scientific development concept, and in

accordance with the basic requirements of the overall planning of urban and rural development,

regional development, economic and social development, and the harmonious development of man and

nature, gradually eliminate the dual structure of urban and rural areas, reduce the difference

between urban and rural areas, conduct unified planning, optimize layout, comprehensively promote,

improve the systematic, coordination, sharing, and economy of urban and rural water supply, create

a complete urban-rural integrated water supply system, and build a unified water supply system for

urban pipe networks, a centralized water supply system for townships, and a village-level water

supply system.

Strengthen the protection of drinking water source areas and the prevention and control of water

pollution, and strengthen source governance. Improve the management system, achieve overall

planning and overall management, strengthen the construction of smart water systems, and realize

intelligent water supply management.

2.3 Establish the spatial division and index system of urban-rural integrated water supply

1)Spatial division

The spatial division of the urban-rural integrated water supply system should not only consider the

internal connection with the distribution of water resources, but also combine the actual urban-

rural spatial layout. At the same time, it should take into account the possibility of major cross-

basin project construction in the province and the operability of construction, operation, and

management of urban-rural integrated water supply systems.

It is necessary to conduct a comprehensive analysis based on the relevant upper water resources

development, utilization, protective planning and spatial development planning, and divide the

urban-rural integrated water supply system into different areas.

2) Index system

Aspects to be considered in the construction of the framework of the urban-rural integrated water

supply indicato

Documents

Tender Notice
Login to view

China Public Procurement Intelligence

Frequently asked questions

The bid deadline for Institutional and Capacity Strengthening for Integrated Urban-Rural Water Supply was 16 Nov 2022. Bidding is closed.

This tender has been issued by ZUOQUAN COUNTY GOVERNMENT in China.

The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.

This tender is financed by Asian Development Bank (ADB).

The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.

The TendersOnTime reference is 73238798. The purchaser document reference is LOAN-3557 PRC.

Browse other tenders from China or search by relevant keywords and CPV classification.