Procurement Summary
Country: Poland
Summary: Improving the Efficiency of Rainwater Management in the Kd5 Catchment Area in the Reda City Commune in the "Design and Build" Formula
Deadline: 10 Apr 2026
Posting Date: 21 Mar 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 138234964
Document Ref. No.: 2026/BZP 00165485/01
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
45232452 - Drainage works
38125000 - Rainfall recorders
45100000 - Site preparation work
45112100 - Trench-digging work
45112700 - Landscaping work
45112710 - Landscaping work for green areas
45112711 - Landscaping work for parks
45112712 - Landscaping work for gardens
45220000 - Engineering works and construction works
45232130 - Storm-water piping construction work
45233200 - Various surface works
45233260 - Pedestrian ways construction work
45240000 - Construction work for water projects
45246000 - River regulation and flood control works
45232410 - Sewerage work
45232454 - Rain-water basin construction work
71320000 - Engineering design services
71421000 - Landscape gardening services
90700000 - Environmental services
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
The subject of the order is the design and execution of construction works (including renovation works) in the area of ul. Obwodowa in Reda, consisting in the construction of infrastructure for the management of rainwater from the KD5 catchment area, in the design and build formula. The scope includes in particular the renovation of the existing reservoir, the construction of blue-green infrastructure elements (called BZI) and accompanying equipment/works, including: installation of a weather station, inspection of the existing DN1400 rainwater sewer and assembly rain gauge (rainfall recorder) in the area of the retention reservoir. A detailed description of the subject of the order, the conditions of its implementation and the Contractor's obligations include: 1) OPZ, constituting Annex No. 8 to the SWZ, 2) Annexes to the OPZ, constituting Annex No. 8a to the SWZ; a) Program Functional Utility (FFU + drawing) b) Assumptions for the BZI concept for the KD5 catchment area (Assumptions + land development scheme); c) Requirements regarding planting plants and post-construction care; d) Water permit (decision + attachment). e)Indications related to implementation of the subject of the order in accordance with the rules for the implementation of projects co-financed by the FEnIKS 2021-202 program...
Documents
Tender Notice