Procurement Summary
Country: Andorra
Summary: General Construction Work for Electrical Lines Catalog of Standardized Positions (cpn): 111-direct Work, 113-construction Site Plant, 117-demolitions and Removals, 132-ca ...
Deadline: 29 Oct 2020
Posting Date: 01 Oct 2020
Other Information
Notice Type: Tender
TOT Ref.No.: 46181098
Document Ref. No.: 1156305
Competition: ICB
Financier: Self Financed
Purchaser Ownership: -
Tender Value: Refer Document
CPV Classification
45231400 - Construction work for electricity power lines
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
General works for the construction of electrical lines catalog of standardized positions (cpn): 111-direct works, 113-construction site plant, 117-demolitions and removals, 132-coring and cutting of concrete and masonry, 151-works for underground pipelines, 152-laying of pipes in advance without trenches, 211-excavation pits and earth movements, 213-arrangement of water courses, 222-boundaries, paving stones, paving stones and stairs, 223-flooring, 241-concrete works carried out on the given the current overhead line connecting the pollegio and acquarossa substations, it has reached its technical life limit and must therefore be replaced. For this purpose, aet will lay approximately 30, 000 meters of new cables in lining pipes which will be located inside an underground concrete box about 10, 000 meters long. The route starts at the height of the new p13n pole. it first winds along the malvaglia countryside, continues along the ex-tram grounds in the "valserin" area, the dongio countryside, the brenno river embankment, and then ends at the new pole 149n. 2.7 place of performance lower valley of bleniozona pollegio - acquarossa 2.11 are variants allowed? no 2.12 I know ...
Documents
Tender Notice